
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
#18 is the Label Location
PRONET Tracking Systems 6340 LBJ Freeway Dallas, TX 75240 To: Jaunice GreenFrom: Robert Palmer Date: November 17, 1999 Subject: Correspondence Reference Number: 10666 Confirmation Number: EA95894 CC:Larry Zhou Dear Sir or Madam, Recently, it was brought to our attention that the location of the FCC Identification label would require some clarification. I am writing to specify the location of this label to be placed on the backside of the equipment in a clear viewing area. This statement appears on the label drawing (CT-01405) as note 2. For your reference, I have attached a copy of the drawing and have highlighted this note. Please take a moment to review this drawing and let me know if there are any additional questions. I can be reached via email at [email protected] or by phone at (972) 687-2189. Sincerely, Robert Palmer Sr. Mechanical Engineer ProNet Tracking Systems 2 LABEL TO BE PLACED ON BACKSIDE OF TRACKER ASSY. IN CLEAR VIEWING AREA
FCC ID# NBI-TRKR1000 Project Number: 00128-10 Prepared for: PRONET, INC. 6340 LBJ Freeway Dallas Texas 75240 By Professional Testing (EMI), Inc. 1601 FM 1460, Suite B Round Rock, Texas 78664 October 1999 CERTIFICATION Electromagnetic Interference Test Report PRONET, INC. Tracker-1000 Transceiver (Intentional Radiator Portion) FCC ID# NBI-TRKR1000 Professional Testing (EMI), Inc.Page 2 of 22 Table of Contents Title Page....................................................................................................................................1 Table of Contents........................................................................................................................2 Certificate of Compliance............................................................................................................3 1.0EUT Description.................................................................................................................4 1.1EUT Operation....................................................................................................................4 2.0Electromagnetic Emissions Testing......................................................................................4 2.1Test Procedure................................................................................................................5 2.2Test Criteria...................................................................................................................5 2.3Test Results.....................................................................................................................5 3.0Occupied Bandwidth Measurements....................................................................................6 3.1Test Procedure................................................................................................................6 3.2Test Criteria....................................................................................................................6 3.3Test Results.....................................................................................................................6 4.0Antenna Requirement..........................................................................................................6 4.1Evaluation Procedure.......................................................................................................7 4.2Evaluation Criteria...........................................................................................................7 4.3Evaluation Results...........................................................................................................7 5.0Modifications to Equipment.................................................................................................7 6.0List of Test Equipment........................................................................................................7 Figures Figure 1: Radiated Emissions Test Setup.....................................................................................8 Appendices Appendix A: Fundamental Emissions Test Data...........................................................................9 Appendix B: Spurious Emissions Test Data...............................................................................11 Appendix C: Occupied Bandwidth Test Data.............................................................................14 THIS REPORT SHALL NOT BE REPRODUCED EXCEPT IN FULL, WITHOUT THE WRITTEN APPROVAL OF PROFESSIONAL TESTING (EMI), INC. FCC ID# NBI-TRKR1000 1601 FM 1460, Suite B Round Rock, Texas 78664 512/244-3371 Fax 512/244-1846 Applicant:ProNet, Inc. Applicant’s Address:6340 LBJ Freeway Dallas Texas 75240 Model:Tracker-1000 Transceiver Serial Number:N/A Project Number:00128-10 Test Dates:October 15, 1999 I, Jeffrey A. Lenk, for Professional Testing (EMI), Inc., being familiar with the FCC rules and test procedures have reviewed the test setup, measured data and this report. I believe them to be true and accurate. The ProNet, Inc. Tracker-1000 Transceiver was tested to and found to be in compliance with FCC Part 15 Subpart C for an Intentional Radiator. The highest emissions generated by the above equipment are listed below: Frequency (MHz)Level (dB μV/m)Limit (dBμV/m)Margin (dB) Fundamental904.899.5125.0-25.5 Spurious1809.660.263.5-3.3 Occupied Bandwidth Record Only Per 47 CFR 15 - Widest OCBW: 16.4 kHz ______________________________ Jeffrey A. Lenk President This report has been reviewed and accepted by ProNet, Inc.. The undersigned is responsible for ensuring that the Tracker-1000 Transceiver will continue to comply with the FCC rules. ______________________________ Certificate of Compliance FCC ID# NBI-TRKR1000 Professional Testing (EMI), Inc.Page 4 of 22 1.0EUT Description The Equipment Under Test (EUT) is the ProNet, Inc. Tracker-1000 Transceiver. The Tracker- 1000 Transceiver is one of the component of ProNet Tracking Systems’ Campus-911 System. The Tracker-1000 Transceiver is a fast scanning receiver to locate a transmitting Personal Alarm Device (PAD) based on the received signal strength. The EUT operates in the 902 to 928 MHz frequency band and employs frequency-hopping to obtain diversity. The EUT is designed for compliance with 47 CFR 15.247 of the FCC rules. Specific test requirements for this device include the following: 47 CFR 15.247 Fundamental Transmit Power 47 CFR 15.247 & 15.205Spurious Radiated Power 47 CFR 15.247 & 2.1049Occupied Bandwidth (2.989 used as Procedural Reference) 47 CFR 15.203Antenna Requirement The system tested consisted of the following: Manufacturer & ModelSerial # FCC ID #Description ProNet, Inc.N/ANBI-TRKR1000Frequency Tracker-1000 TransceiverHopping Transceiver A separate report pursuant to Part 15, Subpart B has been prepared for the ProNet, Inc., Tracker- 1000 Transceiver as a Digital Device. 1.1EUT Operation The Tracker-1000 Transceiver was tested with the wireless link active and fully modulated. Set…
Text truncated - open the document above for the full version.
6340 LBJ Freeway · Dallas, Texas · United States
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 904.8 MHz - 914.6 MHz | 100.00 mW |

Transceiver for wireless data transmission
Equipment Class
TNB - Licensed Non-Broadcast Station Transmitter
Cellular Asset Recovery Device
Equipment Class
PCB - PCS Licensed Transmitter
LPRS Transmitter
Equipment Class
TNB - Licensed Non-Broadcast Station Transmitter
Tracking Unit
Equipment Class
TNB - Licensed Non-Broadcast Station Transmitter
Dye-Pack Actuation Device
Equipment Class
DXX - Part 15 Low Power Communication Device Transmitter