
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
nano3G AP Installation Manual N3G_INST_3008.1 ip.access Ltd Building 2020 Cambourne Business Park Cambourne Cambridgeshire CB23 6DW United Kingdom www.ipaccess.com Revision History Version Change SummaryDateAuthor 1.0Released for N3G_1.129 Jul 2009ZN1 2.0Released for N3G_1.1_UPGRADE28 Aug 2009ZN1 3.0Released for N3G_1.1_UPGRADE MR111 Sep 2009ZN1 4.0Released for N3G_1.1_UPGRADE MR1005 Mar 2010AM4 5.0Released for N3G_1.1_UPGRADE MR10.1, with approval comments01 Apr 2010AM4 6.0Re-released for N3G_1.1_UPGRADE MR10.1 with minor correction12 Apr 2010AM4 6.1Updated for N3G_2.0, added nano3G E8 information13 Apr 2010ZN1 6.2Editorial changes15 Apr 2010AM4 6.3Updated from review comments, reorganised so config file creation is all in one section 14 Jun 2010AM4 7.0Released, incorporating minor comments from approval24 Jun 2010AM4 7.1Updated regulatory information for Band 1 E8 AP10 Jan 2011AM4 8.0Re-released for N3G_2.0, with minor changes from approval comments 10 Jan 2011AM4 8.1Update for N3G_2.0.5, add S8 AP08 Mar 2011AM4 The information contained in this document is commercially confidential and must not be disclosed to third parties without prior consent. nano3G AP Installation ManualContents N3G_INST_300 v8.1 for N3G_2.0.5 © ip.access Limited 2011Page i Table of Contents 1Introduction............................................................................................ 1 1.1Overview ............................................................................................................ 1 1.2User Requirements ............................................................................................ 1 1.3Related Information............................................................................................ 2 1.4Licenses and Copyright Notices ........................................................................ 2 1.5Terminology ....................................................................................................... 2 2Installation Overview and Requirements............................................ 3 2.1Installation Tasks ............................................................................................... 3 2.1.1Pre-Provisioning ................................................................................................... 3 2.1.2Commissioning..................................................................................................... 3 2.1.3On Site Installation ............................................................................................... 4 2.2Requirements for All nano3G APs ..................................................................... 5 2.2.1General Requirements ......................................................................................... 5 2.2.2Information Required for Pre-Provisioning ........................................................... 6 2.2.3Configuration Files - Optional............................................................................... 7 2.2.4Optional Items for Commissioning ....................................................................... 7 2.2.5Information Required for Commissioning ............................................................. 7 2.3nano3G S4 AP Site Requirements .................................................................... 9 2.3.1nano3G S4 AP Power Requirements................................................................... 9 2.3.2nano3G S4 AP Physical Requirements.............................................................. 11 2.3.3nano3G S4 AP IP Bandwidth Requirements...................................................... 11 2.3.4nano3G S4 AP Sundry Installation Equipment................................................... 11 2.4nano3G S8 AP Site Requirements .................................................................. 12 2.4.1nano3G S8 AP Power Requirements................................................................. 12 2.4.2nano3G S8 AP Physical Requirements.............................................................. 14 2.4.3nano3G S8 AP IP Bandwidth Requirements...................................................... 14 2.4.4nano3G S8 AP Sundry Installation Equipment................................................... 14 2.5nano3G E8 AP Site Requirements .................................................................. 15 2.5.1nano3G E8 AP Power Requirements................................................................. 15 2.5.2nano3G E8 AP Physical Requirements.............................................................. 16 2.5.3nano3G E8 AP IP Bandwidth Requirements...................................................... 17 2.5.4nano3G E8 AP Installation Tool Requirements.................................................. 17 3Pre-Provisioning a nano3G AP........................................................... 18 3.1Create a Site for a New AP.............................................................................. 18 3.1.1Start the Create Site Wizard............................................................................... 18 3.1.2Optional - Use an Existing AP Configuration...................................................... 19 3.1.3Optional - Load an AP Configuration File........................................................... 20 3.1.4Enter AP Identification Details............................................................................ 22 3.1.5Select NTP Servers............................................................................................ 23 3.1.6Modify NAS and Network Listen Settings........................................................... 23 3.2Apply an Attribute Configuration to the AP ...................................................... 25 nano3G AP Installation ManualContents N3G_INST_300 v8.1 for N3G_2.0.5 © ip.access Limited 2011Page ii 4Configuration File Preparation ........................................................... 26 4.1Overview of Attribute Configuration Files…
Text truncated - open the document above for the full version.
ip.access ltd Tel +44 (0)1954 713700 Building 2020 Fax +44 (0)1954 713799 Cambourne Business Park www.ipaccess.com Cambourne Cambridge CB23 6DW United Kingdom Registered office: ip.access Building 2020, Cambourne Business Park, Cambridge, CB23 6DW Registered number 3400157 02 February 2011 BABT FCB Forsyth House, Churchfield Road, Walton-on-Thames, Surrey, KT12 2TD Dear Sir or Madam, I, Costa Panayi of ip.access Ltd, Building 2020, Cambourne Business Park Cambourne, Cambridge, CB23 6DW, hereby authorize Natalie Bennett of TÜV SÜD Product Service Ltd, Octagon House, Concorde Way, Segensworth North, Fareham, Hampshire (+44(0)1489 558254) to act as our agent in all matters relating to applications for equipment authorization, including the signing of all documents relating to these matters. This authorization expires on 01 August 2011. Sincerely, Company Officer: Costa Panayi Mechanical Design and Approvals Engineer Telephone Number: +44 (0)1954 713721 Email: [email protected]
ip.access ltd Tel +44 (0)1954 713700 Building 2020 Fax +44 (0)1954 713799 Cambourne Business Park www.ipaccess.com Cambourne Cambridge CB23 6DW United Kingdom Registered office: ip.access Building 2020, Cambourne Business Park, Cambridge, CB23 6DW Registered number 3400157 02 February 2011 BABT TCB Forsyth House, Churchfield Road, Walton-on-Thames, Surrey, KT12 2TD Confidentiality Request Pursuant to Sections 0.457(d)(1)(ii) and 0.459 of the Commission’s Rules, ip.access Ltd hereby requests permanent confidential treatment of information accompanying this application as outlined below: Schematics Bill of Materials/Parts List Technical Descriptions Block Diagrams PCB Layouts The above materials contain trade secrets and proprietary information not customarily released to the public. The public disclosure of these matters might be harmful to the Applicant and provide unjustified benefits to its competitors. The Applicant understands that pursuant to Rule 0.457(d)(1)(ii), disclosure of this Application and all accompanying materials will not be made before the date of the Grant for this Application. Yours sincerely, Company Officer: Costa Panayi Mechanical Design and Approvals Engineer Telephone Number: +44 (0)1954 713721 Email: [email protected]
IP.ACCESS LTD 237 nano3G S8 Access Point Top View Front View (with Stand) Rear View (with Stand) Side View (no Stand) Rear Sockets (no Stand)
18.0 45.0 R1 This device complies with Part 15 of the FCC rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation. SEE NOTE 3 FCC ID: XXXXXXXXXX NOTES BACKING ADHESIVE TO BE 3M 467 OR SIMILAR.1. ALL TEXT TO BE FONT 'ARIAL'.2. ENTER FCC ID AS SHOWN BELOW:3. MODELFCC ID 237BQGGIPA237B 237BAQGGIPA237BA 237CQGGIPA237C 237CAQGGIPA237CA CP A Size: All dimensions in mm Tolerances unless otherwise stated 2 DEC PLACES 0.10mm 1 DEC PLACE 0.20mm 0 DEC PLACE 0.50mm Angular 0.5 DO NOT SCALE www.ipaccess.com C This drawing is the property of ip.access ltd and must not be copied or disclosed without prior written consent A4 SCALE 2:1 Finish: N/A Material: SHEET 1 OF 1 237_044 nano3G-S8 Drawing Number: Drawn by: CP (26-01-2011) Weight: N/A Title: Third Angle CONFIDENTIAL Project: ISSUE DATECHANGE INTL 1 ABCDEFGHIJ 2 3 4 5 6 7 ABCDEFGH IJ 01-03-2011ECN 0918 FCC LABEL 7 6 5 4 3 2 1 MATT OR GLOSS WHITE POLYESTER INFO-MARK 336T-E1
IP Access 237 nano3G S8 Access Point Labels Positions Warranty Seal Product Label Barcode Label FCC Label CASEWORKS REAR VIEW (Variant 237C shown for reference)
IP.ACCESS LTD 223BA PCB (Used in 237BA nano3G S8 Access Point assembly) PCB Top View PCB Bottom View
Document 75912615 Report 04 Issue 1 February 2011 Report On RF Exposure Assessment of the ip.access Ltd 237BA 3G Enterprise Access Point TÜV SÜD Product Service Ltd, Octagon House, Concorde Way, Segensworth North, Fareham, Hampshire, United Kingdom, PO15 5RL Tel: +44 (0) 1489 558100. Website: www.tuvps.co.uk Document 75912615 Report 04 Issue 1 Page 1 of 22 REPORT ON RF Exposure Assessment of the ip.access Ltd 237BA 3G Enterprise Access Point Document 75912615 Report 04 Issue 1 February 2011 PREPARED FOR ip.access Ltd Building 2020 Cambourne Business Park Cambourne Cambridge CB3 6DW PREPARED BY M Whiting Project Manager APPROVED BY M J Hardy Authorised Signatory DATED 03 February 2011 Document 75912615 Report 04 Issue 1 Page 2 of 22 CONTENTS Section Page No 1 REPORT SUMMARY ................................................................................................................... 3 1.1 Introduction ................................................................................................................................... 4 1.2 Brief Summary of Results ............................................................................................................. 5 1.3 Product Information ...................................................................................................................... 7 1.4 Summary ...................................................................................................................................... 7 2 TEST DETAILS ............................................................................................................................ 8 2.1 Rationale for Assessment of the RF Exposure ............................................................................ 9 2.2 Defined Limits ............................................................................................................................. 10 2.3 Establishing Wavelength and 1/4 Wavelength ........................................................................... 10 2.4 Far Field Calculations ................................................................................................................. 11 2.5 Field Regions .............................................................................................................................. 11 3 FIGURES .................................................................................................................................... 12 3.1 Field Representations – ICNIRP ................................................................................................ 13 3.2 Field Representations – FCC ..................................................................................................... 15 3.3 Field Representations – IC ......................................................................................................... 17 3.4 Field Representations – ACMA .................................................................................................. 19 4 DISCLAIMERS AND COPYRIGHT ........................................................................................... 21 4.1 Disclaimers and Copyright .......................................................................................................... 22 Document 75912615 Report 04 Issue 1 Page 3 of 22 SECTION 1 REPORT SUMMARY RF Exposure Assessment of the ip.access Ltd 237BA 3G Enterprise Access Point Document 75912615 Report 04 Issue 1 Page 4 of 22 1.1 INTRODUCTION The information contained in this report is intended to show verification of the RF Exposure Assessment of the ip.access Ltd 237BA 3G Enterprise Access Point to the requirements of the applied test specifications. Objective To perform RF Exposure Assessment to determine the Equipment Under Test's (EUT’s) compliance of the applied rules. Applicant ip.access Ltd Manufacturer ip.access Ltd Manufacturing Description nano3G S8 Access Point (Bands 2 & 5) Model Number(s) 237BA Test Specification/Issue/Date 1. EN62311:2008 - Assessment of electronic and electrical equipment related to human exposure restrictions for electromagnetic fields (0 Hz – 300 GHz). 2. OET Bulletin 65 Edition 97-01 August 1997 - Evaluating Compliance with FCC Guidelines for Human Exposure to Radiofrequency Electromagnetic Fields 3. RSS-102 Issue 2 November 2005 Radio Frequency Exposure Compliance of Radiocommunication Apparatus (All Frequency Bands) 4. Radiocommunications (Electromagnetic Radiation – Human Exposure) Standard 2003 Related Document(s) 5. Council Recommendation 1999/519/EC of 12 July 1999 on the limitation of exposure of the general public to electromagnetic fields (0 Hz to 300 GHz) (Official Journal L 197 of 30 July1999). 6. FCC Guidelines for Evaluating exposure to RF Emissions - 47 CFR § 1.1310; 47 CFR § 1.1307(b) & 47 CFR § 80.83. 7. Health Canada's Safety Code 6: Limits of Human Exposure to Radiofrequency Electromagnetic Fields in the Frequency Range from 3 KHz to 300 GHz. 8. ARPANSA, ‘Radiation Protection Standard – Maximum Exposure Levels to Radiofrequency Fields – 3KHz to 300GHz’ 9. ICNIRP 1998,’Guidelines for limiting exposure to time-varying electric magnetic, and electromagnetic fields (up to 300GHz). Guidelines of the International Commission on Non-Ionizing Radiation Protection’, Health Physics, vol.74, no.4, pp.494-522. Document 75912615 Report 04 Issue 1 Page 5 of 22 10. National Council on Radiation Protection and Measurements (NRPC) - Report No. 86(1986) "Biological Effects and Exposure Criteria for Radio frequency Electromagnetic Fields". 11. EN 50383:2002 - Basic standard for the calculation and measurement of electromagnetic field strength and SAR related to human exposure from radio base stations and fixed terminal stations for wireless telecommunication systems (110 MHz - 40 GHz). 12. IEEE Std C95.1-2005: IEEE Standard for Safety Levels with respect to Human Exposure to Radio Frequency Electromagnetic Fields, 3KHz to 300GHz. 13. Australian Standard 2772.2 – 1…
Text truncated - open the document above for the full version.
Document 75912615 Report 02 Issue 1 April 2011 Report On FCC Testing of the ip.access Ltd 237BA 3G S8 Access Point COMMERCIAL-IN-CONFIDENCE FCC ID: QGGIPA237BA TÜV SÜD Product Service Ltd, Octagon House, Concorde Way, Segensworth North, Fareham, Hampshire, United Kingdom, PO15 5RL Tel: +44 (0) 1489 558100. Website: www.tuvps.co.uk COMMERCIAL-IN-CONFIDENCE Document 75912615 Report 02 Issue 1 Page 1 of 58 COMMERCIAL-IN-CONFIDENCE REPORT ON FCC Testing of the ip.access Ltd 237BA 3G S8 Access Point Document 75912615 Report 02 Issue 1 April 2011 PREPARED FOR ip.access Ltd Building 2020 Cambourne Business Park Cambourne CB23 6DW PREPARED BY N Bennett Senior Administrator APPROVED BY M J Hardy Authorised Signatory DATED 19 April 2011 ENGINEERING STATEMENT The measurements shown in this report were made in accordance with the procedures described on test pages. All reported testing was carried out on a sample equipment to demonstrate limited compliance with FCC CFR 47: Part 2 and 22. The sample tested was found to comply with the requirements defined in the applied rules. Test Engineer(s); G Lawler R Henley B Airs COMMERCIAL-IN-CONFIDENCE Document 75912615 Report 02 Issue 1 Page 2 of 58 COMMERCIAL-IN-CONFIDENCE CONTENTS Section Page No 1 REPORT SUMMARY ................................................................................................................... 3 1.1 Introduction ................................................................................................................................... 4 1.2 Brief Summary of Results ............................................................................................................. 5 1.3 Application Form ........................................................................................................................... 7 1.4 Product Information ...................................................................................................................... 9 1.5 Test Conditions ........................................................................................................................... 10 1.6 Deviations From the Standard .................................................................................................... 10 1.7 Modification Record .................................................................................................................... 10 2 TEST DETAILS .......................................................................................................................... 11 2.1 Spurious Emissions at Band Edge ............................................................................................. 12 2.2 Effective Radiated Power ........................................................................................................... 15 2.3 Maximum Peak Output Power - Conducted ............................................................................... 22 2.4 Emission Limitations for Cellular Equipment .............................................................................. 24 2.5 Conducted Spurious Emissions .................................................................................................. 39 2.6 Occupied Bandwidth ................................................................................................................... 44 2.7 Modulation Characteristics ......................................................................................................... 47 2.8 Frequency Stability Under Temperature Variations ................................................................... 48 2.9 Frequency Stability Under Voltage Variations ............................................................................ 50 3 TEST EQUIPMENT USED ......................................................................................................... 52 3.1 Test Equipment Used ................................................................................................................. 53 3.2 Measurement Uncertainty .......................................................................................................... 56 4 ACCREDITATION, DISCLAIMERS AND COPYRIGHT ............................................................ 57 4.1 Accreditation, Disclaimers and Copyright ................................................................................... 58 COMMERCIAL-IN-CONFIDENCE Document 75912615 Report 02 Issue 1 Page 3 of 58 COMMERCIAL-IN-CONFIDENCE SECTION 1 REPORT SUMMARY FCC Testing of the ip.access Ltd 237BA 3G S8 Access Point COMMERCIAL-IN-CONFIDENCE Document 75912615 Report 02 Issue 1 Page 4 of 58 COMMERCIAL-IN-CONFIDENCE 1.1 INTRODUCTION The information contained in this report is intended to show verification of ip.access Ltd 237BA 3G S8 Access Point to the requirements of FCC CFR 47 Part 2 and 22. Objective To perform FCC Testing to determine the Equipment Under Test's (EUT’s) compliance with the Test Specification, for the series of tests carried out. Manufacturer ip.access Ltd Model Number(s) 237BA 3G S8 Access Point Serial Number(s) 000295-0000024940 Software Version SR1.2.0_491.8.0 Hardware Version B Number of Samples Tested 1 Test Specification/Issue/Date FCC CFR 47 Part 2: 2010 FCC CFR 47 Part 22: 2010 Incoming Release Date Application Form 18 April 2011 Disposal Reference Number Date Held Pending Disposal Not Applicable Not Applicable Order Number Date PO26014 28 January 2011 Start of Test 20 February 2011 Finish of Test 23 March 2011 Name of Engineer(s) B Airs R Henley G Lawler Related Document(s) ANSI C63.4: 2003 COMMERCIAL-IN-CONFIDENCE Document 75912615 Report 02 Issue 1 Page 5 of 58 COMMERCIAL-IN-CONFIDENCE 1.2 BRIEF SUMMARY OF RESULTS A brief summary of results for each configuration, in ac cordance with FCC CFR 47 Part 2 and 22 is shown below. Configuration 1: PoE Supply Section Spec Clause Test Description Mode Mod State Result Base Standard Part 2 Part 22 2.1 2.1051 22.905 Spurious Emissions at Band Edge 871.4 MHz…
Text truncated - open the document above for the full version.
Document 75912615 Report 03 Issue 1 April 2011 Report On FCC Testing of the ip.access Ltd 237BA 3G S8 Access Point COMMERCIAL-IN-CONFIDENCE FCC ID: QGGIPA237BA TUV Product Service Ltd, Octagon House, Concorde Way, Segensworth North, Fareham, Hampshire, United Kingdom, PO15 5RL Tel: +44 (0) 1489 558100. Website: www.tuvps.co.uk COMMERCIAL-IN-CONFIDENCE Document 75912615 Report 03 Issue 1 Page 1 of 62 COMMERCIAL-IN-CONFIDENCE REPORT ON FCC Testing of the ip.access Ltd 237BA 3G S8 Access Point Document 75912615 Report 03 Issue 1 April 2011 PREPARED FOR ip.access Ltd Building 2020 Cambourne Business Park Cambourne CB23 6DW PREPARED BY N Bennett Senior Administrator APPROVED BY M J Hardy Authorised Signatory DATED 19 April 2011 ENGINEERING STATEMENT The measurements shown in this report were made in accordance with the procedures described on test pages. All reported testing was carried out on a sample equipment to demonstrate limited compliance with FCC CFR 47: Part 24. The sample tested was found to comply with the requirements defined in the applied rules. Test Engineer(s); B Airs R Henley G Lawler COMMERCIAL-IN-CONFIDENCE Document 75912615 Report 03 Issue 1 Page 2 of 62 COMMERCIAL-IN-CONFIDENCE CONTENTS Section Page No 1 REPORT SUMMARY ................................................................................................................... 3 1.1 Introduction ................................................................................................................................... 4 1.2 Brief Summary of Results ............................................................................................................. 5 1.3 Application Form ........................................................................................................................... 7 1.4 Product Information ...................................................................................................................... 9 1.5 Test Conditions ........................................................................................................................... 10 1.6 Deviations From the Standard .................................................................................................... 10 1.7 Modification Record .................................................................................................................... 10 2 TEST DETAILS .......................................................................................................................... 11 2.1 Frequency Stability Under Temperature Variations ................................................................... 12 2.2 Frequency Stability Under Voltage Variations ............................................................................ 14 2.3 Spurious Emissions at Band Edge ............................................................................................. 16 2.4 Maximum Peak Output Power - Conducted ............................................................................... 19 2.5 Effective Isotropic Radiated Power ............................................................................................. 21 2.6 Modulation Characteristics ......................................................................................................... 28 2.7 Emission for Broadband PCS Equipment................................................................................... 29 2.8 Conducted Spurious Emissions .................................................................................................. 47 2.9 Occupied Bandwidth ................................................................................................................... 53 3 TEST EQUIPMENT USED ......................................................................................................... 56 3.1 Test Equipment Used ................................................................................................................. 57 3.2 Measurement Uncertainty .......................................................................................................... 60 4 ACCREDITATION, DISCLAIMERS AND COPYRIGHT ............................................................ 61 4.1 Accreditation, Disclaimers and Copyright ................................................................................... 62 COMMERCIAL-IN-CONFIDENCE Document 75912615 Report 03 Issue 1 Page 3 of 62 COMMERCIAL-IN-CONFIDENCE SECTION 1 REPORT SUMMARY FCC Testing of the ip.access Ltd 237BA 3G S8 Access Point COMMERCIAL-IN-CONFIDENCE Document 75912615 Report 03 Issue 1 Page 4 of 62 COMMERCIAL-IN-CONFIDENCE 1.1 INTRODUCTION The information contained in this report is intended to show verification of ip.access Ltd 237BA 3G S8 Access Point to the requirements of FCC CFR 47 Part 2 and 24. Objective To perform FCC Testing to determine the Equipment Under Test's (EUT’s) compliance with the Test Specification, for the series of tests carried out. Manufacturer ip.access Ltd Manufacturing Description 3G S8 Access Point Model Number(s) 237BA Serial Number(s) 000295-0000024940 Software Version SR1.2.0_491.8.0 Hardware Version B Number of Samples Tested 1 Test Specification/Issue/Date FCC CFR 47 Part 2: 2010 FCC CFR 47 Part 24: 2010 Incoming Release Date Application Form 18 April 2011 Disposal Reference Number Date Held Pending Disposal Not Applicable Not Applicable Order Number Date PO26016 28 January 2011 Start of Test 28 February 2011 Finish of Test 12 April 2011 Name of Engineer(s) B Airs R Henley G Lawler Related Document(s) ANSI C63.4: 2003 COMMERCIAL-IN-CONFIDENCE Document 75912615 Report 03 Issue 1 Page 5 of 62 COMMERCIAL-IN-CONFIDENCE 1.2 BRIEF SUMMARY OF RESULTS A brief summary of results for each configuration, in ac cordance with FCC CFR 47 Part 2 and 24 is shown below. Configuration 1: PoE Supply Section Spec Clause Test Description Mode Mod State Result Base Standard Part 2 Part 24 2.1 2.1055 24.135(a) Frequency Stability Under Tem…
Text truncated - open the document above for the full version.
| # | Rule Parts | Frequency Range | Power Output | Emission | Tolerance |
|---|---|---|---|---|---|
| 2 | 24E | 1.93 GHz - 1.99 GHz | 330.00 mW | 4M20F9W | 0.1 ppm |

3G Transmitter UMTS Bands 2 and 5
Equipment Class
PCB - PCS Licensed Transmitter
16 user 3G Access Point operating in Bands 2 & 5
Equipment Class
PCB - PCS Licensed Transmitter
16 user 3G Access Point operating at UMTS Bands 2 & 5
Equipment Class
PCB - PCS Licensed Transmitter
8 user 3G Access Point operating at UMTS Band 4
Equipment Class
JBP - Part 15 Class B Computing Device Peripheral
8 user 3G Access Point operating at UMTS Band 4
Equipment Class
TNB - Licensed Non-Broadcast Station Transmitter