
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
MainNet PLUS™ Installation Manual & User Guide Release 2.1 October 2006 October 2006 Installation Manual & User Guide Page 2 of 38 Release 2.1 MainNet PLUS™ NOTICES 1. See Chapter 6 for important regulatory and legal notices 2. MainNet, the stylized MainNet logo, and the PLUS™ and all other trademarks indicated as such herein are trademarks of MainNet Communications, Ltd. All other product or service names are the property of their respective owners. © 2006 MainNet Communications, Ltd. All rights reserved. http://www.mainnet-plc.com October 2006 Installation Manual & User Guide Page 3 of 38 Release 2.1 MainNet PLUS™ TABLE of CONTENTS 1. MainNet PLUS System Architecture..............................................................5 1.1 General................................................................................................................... 5 1.2 PLUS Architecture Overview............................................................................ 5 1.3 PLUS Unit Configuration................................................................................... 5 1.3.1 PLUS Aggregation Unit (CuPLUS)........................................................... 6 1.3.2 RpPLUS.......................................................................................................... 6 1.3.3 Customer Premises Equipment (CPE)................................................... 7 2. Plus Network and Deployment Guidelines...................................................8 2.1 Quality of Service (QoS)................................................................................ 8 2.2 Latency............................................................................................................... 9 2.3 Recommend Design Standards for the MainNet PLUS™..................... 9 2.4 Introduction to MainNet PLUS™ Network Design................................ 10 2.5 MainNet Network Design Procedure........................................................ 11 2.6 Post Installation Monitoring & Evaluation.............................................. 14 2.6.1 Corrective Actions..................................................................................... 14 2.6.1.1 Problem Scenerio 1: Poor Medium Voltage Link (step 1)............ 14 2.6.1.2 Problem Scenerio 2: Poor Medium Voltage Link (step 2)............ 14 2.6.1.3 Problem Scenerio 3: Poor Low Voltage Link Problem................. 15 2.7 Network Release............................................................................................ 15 3. Hardware Installation Procedure.................................................................16 3.1 Single Phase Overhead Installation – Typical....................................... 16 3.2 Double Phase Overhead Installation - Special...................................... 17 3.3 Single Phase Underground Installations - Typical............................... 18 4. Product Specifications.................................................................................19 4.1 NtPLUS™ Specifications............................................................................. 19 4.2 PLUS™............................................................................................................. 20 4.4 MV OH Coupler Specifications.................................................................. 21 5. Safety.............................................................................................................22 5.1 Exposure to RF Energy................................................................................ 22 5.2 Lightning and Surge Protection................................................................ 22 5.3 Conforming to Regulations........................................................................ 22 5.4 Protecting Cables and Connections from Wind................................... 23 5.5 Moisture........................................................................................................... 23 6. Legal & Regulatory Notices.........................................................................24 6.1 Important Note on Modifications.............................................................. 24 6.2 U.S. Federal Communication Commission (FCC)................................ 24 6.2.1 FCC Labeling BPL Access Device........................................................ 26 October 2006 Installation Manual & User Guide Page 4 of 38 Release 2.1 MainNet PLUS™ 6.2.2 FCC Labeling BPL In-Home Device...................................................... 27 6.3 Legal Notices.................................................................................................. 28 6.3.1 Limited Warrenty, Software License Agreement & Notices........... 28 6.3.2 Standard Purchase Terms and Conditions......................................... 33 7. How to Contact MainNet...............................................................................38 August 2006 Installation Manual & User Guide Page 5 of 38 Issue 2.1 MainNet PLUS™ 1. MainNet PLUS System Architecture 1.1 General MainNet’s PLUS system provides Power Utilities with the ability to supply Broadband Communication services to their customers over their existing electricity infrastructure. The PLUS BPL (Broadband over Power Line) communication system is based on a unique and patented technology that enables high data rate communication over noisy low and medium voltage power lines, combining both access and in-home networks in one system. By bridging the last mile between the Internet backbone and the user’s home over the electricity grid, PLUS allows home users direct access to broadband Internet and IP Telephony through any electrical outlet in the home. L 1.2 PLUS Architecture Overview The PLUS system architecture consists of three distinct elements as the figure to the right shows. Access – consists of units installed by the power utility along the street’s power lines. These are Concentrator Units (CuPLUS units…
Text truncated - open the document above for the full version.
attestation.doc 1 of 1 November 01, 2006 Test Report Attestation According to the testing performed by Product Safety Engineering, the Main.net Communications, Ltd., models CuPLUS and RpPLUS are in compliance with the electromagnetic compatibility requirements in FCC rules, Part 15, Subpart G. Details are shown in the accompanying test report. This document was created with Win2PDF available at http://www.daneprairie.com. The unregistered version of Win2PDF is for evaluation or non-commercial use only.
47 Hanessi’im Street ? PO Box 192 ? Raanana – North 43583 ? ISRAEL Office: +972-9-770-0800 ? Fax: +972-9-774-1327 Federal Communications Commission Authorization and Evaluation Division RE: Confidentiality Request regarding application for certification of QM3G2APLUS To Whom It May Concern: Pursuant to Sections 0.457 and 0.459 of the Commission’s Rules, we hereby request long term confidential treatment of information accompanying this application as outlined below: • Schematic Diagrams • Block Diagrams • Operational Descriptions The above materials contain trade secrets and proprietary information not customarily released to the public. The public disclosure of these materials may be harmful to the applicant and provide unjustified benefits to its competitors. Also, pursuant to Sections 0.457 and 0.459 of the Commission’s Rules, we hereby request short-term confidential treatment of information accompanying this application as outlined below: • Product photographs • User guide • Coupler Descriptions • Interference Mitigation Documentation The above materials are considered proprietary and confidential until such time as the official product launch takes place. Public disclosure of these materials may be harmful to the applicant. The applicant understands that pursuant to Section 0.457 of the Rules, disclosure of this application and all accompanying documentation will not be made before the date of the Grant for this application. Further, the applicant understands that the exhibits described above as requiring long term confidential treatment will remain undisclosed indefinitely, and that the exhibits described above as requiring short term confidential treatment will remain undisclosed for a period of 45 days from the date of the grant of equipment authorization, or until the product is publicly announced, whichever comes first. Sincerely, Rami Refaeli VP – R&D This document was created with Win2PDF available at http://www.daneprairie.com. The unregistered version of Win2PDF is for evaluation or non-commercial use only.
Correspondence Reference Number: 32260 1) Upload coupler photos to the external photos exhibit. Please see uploaded file named QM3G2APLUS Coupler photos.pdf. 2) Is this device used for common mode injection, differential mode injection, or both? Which mode of injection was tested? The device operates in differential mode and was tested in differential mode. 3) Does this device couple to low voltage lines? If so, how was this tested? Yes, this device couples to the low voltage lines. The connections on the low voltage lines are direct connections (no use of couplers on the LV side). The connections are illustrated in the installation guide but again they show how they are installed together with the coupling on the MV side not how it was tested (when we tested we separated the injection of MV from that of the LV). The typical installation is that the device is connected to the two secondary phases & neutral (220V). The device gets it power and transmits on these wires. In the typical installation the same device is also connected to the medium voltage (by use of couplers), thus transmitting the signal both on the medium voltage and low voltage. 4) The User’s Manual is not clear how the utility would set the notch is there was a complaint on a specific frequency. Please clarify how this would be done. Please see uploaded file named QM3G2APLUS Mitigation Methodolgy.pdf 5) The overhead testing was done at a power setting of 6 (7 being the highest power setting) and the device is 0.1 dB from the limit. Preliminary data has indicated that a power setting of 4 might be appropriate for overhead lines. Explain the difference in field strength between a power setting of 6 and 4? I am not aware of any preliminary data for this device operating at power level (4). The previous version of this product line operated at power level (4) but this is a new design. The difference in field strength between each power level is approximately (3) dB.
October 2006 FCC Labeling Page 1 of 3 Rev. 1.1 MainNet PLUS™ US Federal Communications Commission (FCC) Rules and Regulations for Broadband over Power Line (BPL) 47 CFR 15 Labeling Revision 1.1 Date: October 27, 2006 October 2006 FCC Labeling Page 2 of 3 Rev. 1.1 MainNet PLUS™ BPL Access unit; FCC compliance labeling; MainNet PLUS Manufacturer: MainNet Communications, Ltd BPL Classification: Broadband over Power Line Access Product Note: FCC ID Label Details – The label below shall be fixed to the base of the plastic housing. Figure - Expanded View of Label Figure - Actual Size of Label MainNet Communications Ltd. FCC ID: QM3G2APLUS This device complies with Part 15 of the FCC rules. Operation is subject to the following two conditions; (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation. MainNet Communications Ltd. FCC ID: QM3G2APLUS This device complies with Part 15 of the FCC rules. Operation is subject to the following two conditions; (1) This device may not cause harmful interference, and (2) This device must accept any interference r eceived, including interference that may cause undesired operation. October 2006 FCC Labeling Page 3 of 3 Rev. 1.1 MainNet PLUS™ BPL In-home unit; FCC compliance labeling; MainNet PLUS Manufacturer: MainNet Communications, Ltd BPL Unit Type: Broadband over Power Line In-Building Product Note: FCC ID Label Details – The label below shall be fixed to the base of the plastic housing. Figure - Expanded View of Label Figure - Actual Size of Label MainNet Communications Ltd. This device complies with Part 15 of the FCC rules. Operation is subject to the following two conditions; (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation. MainNet Communications Ltd. This device complies with Part 15 of the FCC rules. Operation is subject to the following two conditions; (1) This device may not cause harmful interference, and (2) This device must accept any interference r eceived, including interference that may cause undesired operation.
COUPLER DATA OVERHEAD COUPLER Main.net FCC ID: QM3G2APLUS Medium Voltage Overhead Coupler - Confidential Ver 2.1 CPL00001-001 05/03 Copyright© 2002 Main.net Communications Ltd. The copying of this document or disclosure of the information it contains to any person who is not an employee of Main.Net communication Ltd. is strictly prohibited, unless prior written consent is obtained from Main.net communication Ltd. The information herein is Main.net Communication Ltd. intellectual property, reflects ideas and should not be used in a sales process. 1 Overhead Coupler. CPL00001-001 Medium Voltage Overhead Coupler - Confidential Ver 2.1 CPL00001-001 05/03 Copyright© 2002 Main.net Communications Ltd. The copying of this document or disclosure of the information it contains to any person who is not an employee of Main.Net communication Ltd. is strictly prohibited, unless prior written consent is obtained from Main.net communication Ltd. The information herein is Main.net Communication Ltd. intellectual property, reflects ideas and should not be used in a sales process. 2 List of contents Para ITEM Page 1 General 3 2 Coupler Labeling 4 3 High Voltage Wire installation. 5 4 Coupler Base – ferrite cores installation. 6 5 Packaging 7 App. A LBL10008, INSTALLATION DIRECTION “ARROW”LABEL 8 App. B LBL10012, 'OPEN', LABEL 9 App. C LBL10013, SCREW ARROW LABEL 10 App. D LBL20053-05, MODEL LABEL 11 App. E LBL20120, “G2” LABEL for Coupler Cable marking. 12 Medium Voltage Overhead Coupler - Confidential Ver 2.1 CPL00001-001 05/03 Copyright© 2002 Main.net Communications Ltd. The copying of this document or disclosure of the information it contains to any person who is not an employee of Main.Net communication Ltd. is strictly prohibited, unless prior written consent is obtained from Main.net communication Ltd. The information herein is Main.net Communication Ltd. intellectual property, reflects ideas and should not be used in a sales process. 3 1. General. Over Head Coupler - general view. The Coupler construction include: -Plastic housing CPL10001 – Base, Cover, connection Axe, Flange, etc. -Cores-P/N COR10005 -Fuses-P/N FUS00007 -Cable-P/N CAB0103K Fig. 1-1. Medium Voltage Overhead Coupler - Confidential Ver 2.1 CPL00001-001 05/03 Copyright© 2002 Main.net Communications Ltd. The copying of this document or disclosure of the information it contains to any person who is not an employee of Main.Net communication Ltd. is strictly prohibited, unless prior written consent is obtained from Main.net communication Ltd. The information herein is Main.net Communication Ltd. intellectual property, reflects ideas and should not be used in a sales process. 4 2. Coupler Labeling. a. Put the “OPEN” (P/N LBL10012) and Arrow label (P/N LBL10013 ) on the Coupler Base as shown on the Fig. 2-1. Base (bottom view) O p e n Fig. 2-1. b. Put the installation arrow (LBL10008) label on the Coupler Cover, as shown on the Fig. 2-2. Fig. 2-2. Medium Voltage Overhead Coupler - Confidential Ver 2.1 CPL00001-001 05/03 Copyright© 2002 Main.net Communications Ltd. The copying of this document or disclosure of the information it contains to any person who is not an employee of Main.Net communication Ltd. is strictly prohibited, unless prior written consent is obtained from Main.net communication Ltd. The information herein is Main.net Communication Ltd. intellectual property, reflects ideas and should not be used in a sales process. 5 3. High Voltage Wire installation. a. Cut a 68.5 cm of a H.V. red wire (P/N WIR20001). b. Install/wrap the High Voltage Wire (P/N WIR20001) into the Coupler Base - two wraps. The installation must begin from the “Input”, as shown on the Fig. 3-1. c Put a Label (White cello tape) on the Input side of the HV wire, 120 mm from the bottom side of the Base. High Voltage Cable Input Output Input Label (White cello tape) 120 mm Base (bottom view) O p e n Fig. 3-1. Medium Voltage Overhead Coupler - Confidential Ver 2.1 CPL00001-001 05/03 Copyright© 2002 Main.net Communications Ltd. The copying of this document or disclosure of the information it contains to any person who is not an employee of Main.Net communication Ltd. is strictly prohibited, unless prior written consent is obtained from Main.net communication Ltd. The information herein is Main.net Communication Ltd. intellectual property, reflects ideas and should not be used in a sales process. 6 4. Coupler Base – ferrite cores installation. 4.1. Ferrites (P/N COR10005) coating. -Cover the Ferrites open, non-coated, sides with metals Lack, (GLU00005) transparent spray, (Jacoby, Vegelzang, Germany, ZAPON LACK). -Let the Ferrites dry for an Hour minimum. -Repeat the above for 2 times. At all should be 3 coating layers. 4.2 Ferrites/Cores (P/N COR10005) installation. Take two half cores and drop them into the Coupler Base. Fig 4-1 Medium Voltage Overhead Coupler - Confidential Ver 2.1 CPL00001-001 05/03 Copyright© 2002 Main.net Communications Ltd. The copying of this document or disclosure of the information it contains to any person who is not an employee of Main.Net communication Ltd. is strictly prohibited, unless prior written consent is obtained from Main.net communication Ltd. The information herein is Main.net Communication Ltd. intellectual property, reflects ideas and should not be used in a sales process. 7 5. Packaging. - Fix the Coupler Cable to the Weather Tube/Skirt: Fig. 5-1. Medium Voltage Overhead Coupler - Confidential Ver 2.1 CPL00001-001 05/03 Copyright© 2002 Main.net Communications Ltd. The copying of this document or disclosure of the information it contains to any person who is not an employee of Main.Net communication Ltd. is strictly prohibited, unless prior written consent is obtained from Main.net communication Ltd. The information herein is Main.net Communication Ltd. intellectual property, reflects ideas and should not be used in a sales process. 8 App. A. LBL10008, INSTALLATION DIRECTION “ARROW” LABEL. Medium Voltage Overhead Coupler - C…
Text truncated - open the document above for the full version.
October 2006 Interference Mitigation & Avoidance Methodology Page 1 of 5 Rev. 1.0 MainNet PLUS™ Interference Mitigation & Avoidance Methodolgy for Compliance with the 47 CFR 15 US Federal Communications Commission (FCC) Rules and Regulations for Broadband over Power Line (BPL) Revision 1.0 Date: October 10, 2006 October 2006 Interference Mitigation & Avoidance Methodology Page 2 of 5 Rev. 1.0 MainNet PLUS™ Introduction On January 7, 2005 the Federal Communication Commission 47 CFR Part 15 Rules for Broadband Power Lines Systems were published in the Federal Register. These rules as adopted and published went into effect on July 7, 2006. The Rules among other things define Broadband Power Line systems and establish requirements for emissions limits, reporting, certification, interference mitigation and excluded frequencies and exclude deployment zones. As part of the these rules the FCC has added defined Broadband over Power Line (BPL) thereby differentiating it from Power Line Carrier (PLC) and creating a new class of Part 15 product. The FCC further differetiated BPL products creating definitions for Access BPL and In-Home BPL devices recognizing the distintly different function the products serve and the different environments where the products shall be applied. itions for these products which were not present prior to the rules changes. The definitions can be found in 47 CFR §15.3(ff) and 47 CFR §15.3(gg). The rules for interference mitigation apply to Access BPL products. Specifically any Access BPL equipment that is manufactured, sold, distributed or installed from July 7, 2006 onward must meet the new rules. These rules require that: • Access BPL equipment be certified compliant with the FCC rules 1 ; • Access BPL equipment when applied to overhead electric distributionlines have a set of pre-set notches where no carrier frequencies are placed 2,3 1 47 CFR §15.101(a) 2 47 CFR §15.516(f)(1) 3 The FCC Office of Engineering and Technology (OET) provided clarification regarding the reference in 47 CFR §15.516f to no carriers in the excluded bands. The communication is presented below: Inquiry: Section 15.615(f) states ....system does not operate on any frequencies designated as excluded bands or on identified frequencies within any designated exclusion zones. What are the limits for spurious emissions within the excluded bands? Response: Section 15.611(c) "Interference Mitigation and Avoidance" addresses the limits for excluded bands. The signal shall be attenuated by 20 dB below the Part 15 limit for frequencies below 30 MHz and 10 dB below the applicable limit for frequencies above 30 MHz. At frequencies above 30 MHz Class A limits are permissible on medium-voltage lines with justification. Justification includes marketing requirements and usage requirements. Generally these devices are sold and used by public utility companies so class A limits are applicable for the medium- voltage lines. The application must provide a paragraph on this justification. Otherwise Class B limits can be used on medium-voltage lines. BPL devices used on low-voltage lines and operating above 30 MHz must use Class B limits. Class A limits are not permissible on low-voltage lines. There is no test procedure for the 20 dB or 10 dB notch. This is due to the dangers inherent in moving a measurement antenna close to the power line. However, the application must describe what frequencies or bands are notched and how this is implemented to meet the requirements. This can be done in the operational Description or a Letter Exhibit of compliance can be submitted by the applicant. October 2006 Interference Mitigation & Avoidance Methodology Page 3 of 5 Rev. 1.0 MainNet PLUS™ • The equipment has the capability to remotely places notches or filters that will reduce radiated emissions to 20 dB below the Part 15 limits for frequencies below 30 MHz and 10 dB below the Part 15 limits for frequencies above 30 MHz 4 ; • The equipment has the ability to automatically restore system settings following a power interruption 5 ; and, • The equipment has the capability to be shut-down remotely 6 . This paper describes MainNet’s methodolgy for meeting specifically the interference mitigation requirements as adopted by these rules. Definitions From 47 CFR §15.3, (ff) Access Broadband over Power Line (Access BPL). A carrier current system installed and operated on an electric utility service as an unintentional radiator that sends radio frequency energy on frequencies between 1.705 MHz and 80 MHz over medium voltage lines or over low voltage lines to provide broadband communications and is located on the supply side of the utility service’s points of interconnection with customer premises. Access BPL does not include power line carrier systems as defined in Section 15.3(t) of this part or In-House BPL as defined in Section 15.3(gg) of this part. (gg) In-House Broadband over power line (In-House BPL). A carrier current system, operating as an unintentional radiator, that sends radio frequency energy by conduction over electric power lines that are not owned, operated or controlled by an electric service provider. The electric power lines may be aerial (overhead), underground, or inside the walls, floors or ceilings of user premises. In-House BPL devices may establish closed networks within a user’s premises or provide connections to Access BPL networks, or both. Interference Mitigation Avoidance Requirements 47 CFR §15.611(c) defines the interference mitigation technical requirements. “Interference Mitigation Avoidance (1) Access BPL systems shall incorporate adaptive interference mitigation techniques to remotely reduce power and adjust operating frequencies, in order to avoid site specific, local use of same spectrum by licensed services. These techniques may 4 47 CFR §15.611(c)(1) 5 47 CFR §15.611(c)(2) 6 47 CFR §15.611(c)(3) October 2006 Interference Mitigation & Avoidance Methodology Page 4 of 5 Rev. 1.0 MainNet PLUS™ include a…
Text truncated - open the document above for the full version.
Product Safety Engineering, Inc 12955 Bellamy Brothers Blvd. Dade City, FL 33525 Tel (352) 588-2209 Fax (352) 588-2544 Test Report Number 06F278B Page 1 of 10 Certification # 1367-01 TEST REPORT Laboratory IDSubmitter ID PRODUCT SAFETY ENGINEERING, INC.Main.net Communications, Ltd 14th Hataas St. 12955 Bellamy Brothers BoulevardPO Box 2324 Dade City, Florida 33525 USAKfar-Saba 44641 PH (352) 588-2209 FX (352) 588-2544Israel Report Issue Date: 30 Oct 2006 Test Report Number:06F278B Sample S/N: NA Model Designation: CuPLUS / RpPLUS (REV G2) Sample Receipt Date: NA Product Description: Access BPL Sample Test Date: see data sheets Marketing Approval Description of non-standard test method or test practice: None Estimated Measurement Uncertainty: Not Applicable Special limitations of use: None Traceability: reference standards of measurement have been calibrated by a competent body using standards traceable to the NIST. According to testing performed at Product Safety Engineering, Inc., the above-mentioned unit is in compliance with the electromagnetic compatibility requirements defined in regulations indicated on page (3) of the test report. The test results contained herein relate only to the model(s) identified above. It is the manufacturer’s responsibility to assure that additional production units of this model are manufactured with identical electrical and mechanical characteristics. As the responsible EMC Project Engineer, I hereby declare that the equipment tested as specified above conforms to the requirements indicated on page (3) of the test report. Signature Name David Foerstner Title Engineering Group Leader Date 30 Oct 2006 Reviewed by: Approved Signatory Date 20 Oct 2006 This report may only be reproduced in full without written permission from Product Safety Engineering, Inc. Product Safety Engineering, Inc 12955 Bellamy Brothers Blvd. Dade City, FL 33525 Tel (352) 588-2209 Fax (352) 588-2544 Test Report Number 06F278B Page 2 of 10 D I R E C T O R Y - EMISSIONS Page(s) A)Documentation Test report1 - 10 Directory2 Test Regulations3 General Remarks10 B)Test data Conducted emissions10/150 kHz - 30 MHz5, 9 Radiated emissions10 kHz - 30 MHz5, 9 Radiated emissions30 MHz - 1000 MHz6, 9 Interference MitigationAs Required6, 9 Equivalent Radiated emissions1 GHz - 18 GHz7, 9 Antenna Disturbance Voltage30 MHz - 1,000 MHz7,9 C)Appendix A Test Equipment Calibration Information Description of Testing Test Data Sheets A2 A3 - A10 A11 -A23 Product Safety Engineering, Inc 12955 Bellamy Brothers Blvd. Dade City, FL 33525 Tel (352) 588-2209 Fax (352) 588-2544 Test Report Number 06F278B Page 3 of 10 EMISSIONS TEST REGULATIONS : The emissions tests were performed according to following regulations: 9 - EN 61000-6-3:2001 9 - EN 61000-6-4:2001 9 - EN 55011 : 1998 / A1:19999 - Group 19 - Group 2 9 - Class A9 - Class B 9 - EN 55013 : 1990 / A12:1994 / A13:1996 / A14:1999 9 - EN 55014 -1: 20019 - Household appliances and similar 9 - Portable tools 9 - Semiconductor devices 9 - EN 55022 (1998) /A1:2001 /A2:20039 - Class A9 - Class B 9 -AS/NZS 3548:19959 - Class A9 - Class B 9 - ICES-0039 - Class A9 - Class B 9 - CNS 134389 - Class A9 - Class B 9 - VCCI : 19999 - Class A9 - Class B # - FCC Part 15 Sub Part G9 - Class A9 - Class B “General Technical Requirements” # - Certification 9 - Verification 9 - Declaration of Conformity 9 - FCC Part 18 Product Safety Engineering, Inc 12955 Bellamy Brothers Blvd. Dade City, FL 33525 Tel (352) 588-2209 Fax (352) 588-2544 Test Report Number 06F278B Page 4 of 10 Environmental conditions during testing: LAB OATS Temperature: * _________: ________ Relative Humidity: ** _________: ________ * The ambient temperature during the testing was within the range of (50 - 104 F) unless indicted above. oo ** The humidity levels during the testing was within the range of (10% - 90%) relative humidity unless indicated above. Power supply system: 110 Volts 60 Hz SINGLE phase Sign Explanations: 9 - not applicable # - applicable Product Safety Engineering, Inc 12955 Bellamy Brothers Blvd. Dade City, FL 33525 Tel (352) 588-2209 Fax (352) 588-2544 Test Report Number 06F278B Page 5 of 10 Emissions Test Conditions: CONDUCTED EMISSIONS (Interference Voltage) The CONDUCTED EMISSIONS (INTERFERENCE VOLTAGE) measurements were performed at the following test location: # - Test not applicable 9 - Darby Test Site (Open Area Test Site) 9 - Darby Laboratory Test equipment used : Model NumberManufacturerDescriptionSerial Number 9 -8028-50Solar50 S LISN829012, 829022 9 -3825/2Solar50 S LISN924840 9 -EMC-30Electro-MetricsEMI Receiver191 9 -8566BHewlett-PackardSpectrum Analyzer2421A00526 9 -85650AHewlett-PackardQuasi-Peak Adapter2043A00209 9 -85662AHewlett Packard Analyzer Display2403A07352 9 -8028-50Solar50 S LISN903725, 903726 9 -FCC-TLISN-T4Fisher Custom Com.Telecom ISN20072 Emissions Test Conditions: RADIATED EMISSIONS (Magnetic Field) The RADIATED EMISSIONS (MAGNETIC FIELD) measurements were performed at the following test location: 9 - Darby Test Site (Open Area Test Site) # - In-Situ Testing (Princeton, IL & Manasas, Va) 9 - at a test distance of : 9 - 3 meters # - 10 meters 9 - Test not applicable Test equipment used : Model NumberManufacturerDescriptionSerial…
Text truncated - open the document above for the full version.
12955 Bellamy Bros. Blvd. · Dade City, Florida · United States
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15G | 4 MHz - 21 MHz | - |

Carrier Current Network Device
Equipment Class
JBP - Part 15 Class B Computing Device Peripheral