FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Bretford Manufacturing, Inc./
  3. YY9-HE406LLA

YY9-HE406LLAPOWERSYNC STATION 20 FOR IPAD AND IPAD MINI

Bretford Manufacturing, Inc.
POWERSYNC STATION 20 FOR IPAD AND IPAD MINI - FCC ID YY9-HE406LLA - Bretford Manufacturing, Inc.
Click to zoom

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Dec 25, 2013
Application Purpose
Original Equipment
Date of Application
Dec 25, 2013
Equipment Note
POWERSYNC STATION 20 FOR IPAD AND IPAD MINI
Frequency Range
2412.00000000 - 2462.00000000
Company
Bretford Manufacturing, Inc.
Country
United States

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗
↗
↗
↗

External Photos

↗

ID Label/Location Info

↗
↗

Internal Photos

↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

PowerSync Station 20 for iPad and iPad mini ® Charge your devices 1. Place one iPad in each slot of the PowerSync Station, and attach the included Lightning cable. 2. Unwind the power cord for the PowerSync Station and plug it into a power outlet. 3. Turn the PowerSync Station on. Your iPad and iPad mini devices will begin charging. Configure your Devices To configure multiple iPad devices, we recommend using Apple Configurator. Apple Configurator works with Apps from the App store, and allows you to install those apps, along with settings specific for your organization, to multiple devices simultaneously. 1. Connect your devices to the PowerSync Station 20 for iPad. 2. Connect your PowerSync Station 20 for iPad to your Mac. 3. Launch Apple Configurator (Available for free on the Mac App Store.) 4. In Apple Configurator, enter your settings, configure your profiles, and import your Apps. Click “Prepare” To help our customers with Apple Configurator, Bretford has written an eBook entitled “iOS Deployment: A guide for managing iPad, iPhone, and iPod touch in your organization”. Get this free resource on our website at bretford.com/apple/deployment. Understanding LED Status Lights The PowerSync Station 20 features LED status indicators above each slot to let you know when your devices are ready: LightDescription OffDevice is not connected. Amber Device is charging. OK to disconnect. Green Device is fully charged. OK to disconnect Flashing Amber Device is charging & syncing. Do not disconnect. Flashing Amber and Green Device is fully charged, but still syncing. Do not disconnect. Monitor Your Station The PowerSync Station 20 allows you to remotely monitor the status of the iOS devices connected to your station. With the PowerSync+ app, you can: Check Charge StatusReceive NotificationsReceive Reporting PowerSync+ All devices are fully charged OK View ® To get started, download PowerSync+ from the App Store, or visit powersyncplus.com. Configure the Station to Join a Wi-Fi Network To configure the PowerSync Station to join a Wi-Fi network, you’ll use your iOS device’s bluetooth connection to share it’s Wi-Fi network information with the station. 1. Make sure your iOS device is connected to the Wi-Fi network you want to share with your station. 2. Turn the PowerSync Station power switch to OFF, then back to ON. After turning on, if you haven’t already configured your PowerSync Station, your station will be discoverable via Bluetooth for one minute. 3. On your iOS device, open the Settings app, and navigate to Bluetooth. 4. Choose to pair with “PowerSync+” 5. When prompted to “Share Wi-Fi Settings”, tap the “Allow” button. Your PowerSync Station will join your WiFi Network. Use the PowerSync+ App to add this station to your account. Technical Specifications Model Number: HE406LL/A Dimensions: 28.7 in wide x 15.0 in deep x 14.7 in high Capacity: 20 iPad or iPad mini devices Weight without devices: 49 lbs Rating: 125VAC, 3A Max. 60Hz Max Charge Current: 2.4A for each device Cord: Certified Power Supply Input Cord with IEC plug C13 Approval: USA and Canada Assembly: Ships fully assembled Warranty: 12 years on cart, 2 years on electrical Electrical The socket-outlet shall be installed near the equipment and shall be easily accessible! Avoid sparks. Avoid arcing. Always turn OFF the power to the unit before plugging IN or OUT! Be sure each device is turned OFF before plugging into the station. For Safety Purposes, make sure all electrical components do not exceed the maximum load rating of 5 amps. Risk of electrical shock. Do not plug the power cord into another extension cord or relocatable power tap. The Power Module inside the station is only for charging & syncing Apple iPad devices. Do not unplug this product from the outlet when your hands are wet. Do not plug the unit in if the switch, receptacle(s) or power cord has been damaged. Contact Bretford before attempting to make any type of electrical repair or parts replacement. Caution Ventilation is critical for PowerSync products to operate correctly, Do not block the ventilation holes on the unit. Proper air flow is required for safe operation of equipment. Arranging devices in the station should be such that a hazardous condition is not achieved due to uneven mechanical loading. Install and operate the cart in an environment compatible with the maximum ambient temperature of 25° C or 77° F. This station is not designed to be operated by a child or student. Adult operation and supervision is recommended at all times. Do not place a TV or monitor on top of the station. The total weight of accessories on top of the cart should be less than 25 lbs. This cart it is not designed for outdoor use. Liquids should not be stored in, set on or placed inside this unit. FCC Note: This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. THE MANUFACTURER IS NOT RESPONSIBLE FOR ANY RADIO OR TV INTERFERENCE CAUSED BY UNAUTHORIZED MODIFICATIONS OR CHANGE TO THIS EQUIPMENT. SUCH MODIFICATIONS OR CHANGE COULD VOID AND CHANGE ANTENNA WHICH THE MANUFACTURER PROVIDES. IT IS THE USER’S AUTHORITY TO OPERATE THE EQUIPMENT. This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be deter…

Text truncated - open the document above for the full version.

Cover Letter(s)

Bretford Manufacturing, Inc. Date: Dec 17, 2013 Federal Communications Commission Authorization and Evaluation Division Confidentiality Request regarding application for certification of FCC ID: YY9-HE406LLA Pursuant to Sections 0.457 and 0.459 of the Commission’s Rules, we hereby request confidential treatment of information accompanying this application as outlined below: Exhibit Type File Name Schematics SCH.pdf Block Diagram BlockDiagram.pdf Operational Description CircuitDescription.pdf The above materials contain trade secrets and proprietary information not customarily released to the public. The public disclosure of these materials may be harmful to the applicant and provide unjustified benefits to its competitors. The applicant understands that pursuant to Section 0.457 of the Rules, disclosure of this application and all accompanying documentation will not be made before the date of the Grant for this application. Sincerely, Bretford Manufacturing, Inc. 11000 Seymour Ave Franklin Park IL 60131 USA ............................................................... Signature Chris Brandel / Project Engineer ................................................ Typed name and Title

Cover Letter(s)

Federal Communications Commission Authorization and Evaluation Division 1435 Oakland Mills Road Columbia, MD 21046 Date: Dec 17, 2013 SUBJECT: FCC Application for (FCC ID: YY9-HE406LLA) To Whom It May Concern: I, the undersigned, hereby attest to the fact that I will apply the Declaration of Conformity procedure to the class B computer peripheral portion of this composite device. I understand the following FCC requirements: 1. Devices subject to the DoC procedure are required to be tested to show compliance with the FCC technical regulations by a recognized accredited testing laboratory. The testing laboratory must be accredited by a Commission approved accreditation body or designated under the terms of a government-to-government Mutual Recognition Agreement (MRA). A listing of those accredited testing laboratories that have been recognized by the Commission is published on the FCC Webpage: https://apps.fcc.gov/oetcf/eas/reports/TestFirmSearch.cfm (Select the "accredited" option to search for FCC recognized accredited test firms.) 2. Test facilities located in countries, where the U.S. does not have an operational Telcom MRA are not recognized by the FCC to test for the DoC procedure. 3. Pt 2.1077 contains the list of information that must be included in the Declaration of Conformity, which must be supplied with each product sold. The DoC compliance info shall be included in the User’s Manual or as a separate sheet. The info must contain the name, address, and phone number of the responsible party, which must be located within the United States. According to 2.909(c)(2), the responsible party is either the Manufacturer or if the product is imported the Importer. Regards, Signature: Chris Brandel / Project Engineer Applicant: Bretford Manufacturing, Inc. Address: 11000 Seymour Ave Franklin Park IL 60131 USA

Cover Letter(s)

Bretford Manufacturing, Inc. FCC ID: YY9-HE406LLA POWER OF ATTORNEY Date: Dec 17,2013 Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 To Whom It May Concern: We, the undersigned, hereby authorize Waltek Services (ShenZhen) Co., Ltd. (Philo Zhong) on our behalf, to apply to the Federal Communications Commission on our equipment. Any and all acts carried out by Waltek Services (ShenZhen) Co., Ltd. (Philo Zhong) on our behalf shall have the same effect as acts of our own. This authorization expires on Dec 16,2014. This is to advise that we are in full compliance with the Anti-Drug Abuse Act. We, Bretford Manufacturing,Inc., are not subject to a denial of federal benefits pursuant to Section 5301 of the Anti-Drug Act of 1988, 21 USC853a, and no party to the application is subject to a denial of federal benefits pursuant to that section. Sincerely, Signature: Chris Brandel / Project Engineer .................................................................................... [typed name and title] Bretford Manufacturing,Inc. 11000 Seymour Ave Franklin Park IL 60131 USA

Cover Letter(s)

TEST REPORT Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn Page 1 of 79 Reference No. : WTS13S0907154E FCC ID : YY9-HE406LLA Applicant : Bretford Manufacturing, Inc. Address : 11000 Seymour Ave Franklin Park IL 60131 USA Manufacturer : BCD China Electronics Manufacturing (Shenzhen) Ltd Address : 3/F&5/F, Bldg B2, Xin An No. 3 Industrial Park, Hang Cheng Industrial Zone, Qian Jin Road, Xi Xiang, Bao An District, Shenzhen, Guangdong, China 518126 Equipment Under Test (EUT) : Product Name : PowerSync Station 20 for iPad and iPad mini Model No. : HE406LL/A Rules : FCC CFR47 Part 15 C Section 15.247:2010 Date of Test : Sep . 11~25, 2013 Date of Issue : Nov. 13, 2013 Test Result : PASS* Remark: * The sample detailed above has been tested to the requirements of FCC rules mentioned above. The test results have been reviewed against the directives above and found to meet their essential requirements. The results shown in this test report refer only to the sample(s) tested, this test report cannot be reproduced, except in full, without prior written permission of the company. The report would be invalid without Sepcific stamp of test institute and the signatures of compiler and approver. PERPARED BY: Waltek Services (Shenzhen) Co., Ltd. Address: 1/F., Fukangtai Building, West Baima Road, Songgang Street, Baoan District, Shenzhen, Guangdong, China Testing location: 1/F., Fukangtai Building, West Baima Road, Songgang Street, Baoan District, Shenzhen, Guangdong, China Tel :+86-755-83551033 Fax:+86-755-83552400 Compiled by: Approved by: Maikou Zhang / Project Engineer Philo Zhong / Manager Reference No.: WTS13S0907154E Page 2 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn 2 Test Summary Test Items Test Requirement Result Radiated Emissions 15.205(a) 15.209(a) PASS Conducted Emissions 15.207(a) PASS 6dB Bandwidth 15.247(a)(2) PASS Maximum Peak Output Power 15.247(b)(3),(4) PASS Power Sepctral Density 15.247(e) PASS Band Edge 15.247(d) PASS Emissions from out of band 15.247(d) PASS Emissions from the restricted bands 15.247(d) PASS Antenna Requirement 15.203 PASS Maximum Permissible Exposure (Exposure of Humans to RF Fields) 1.1307(b)(1) PASS Reference No.: WTS13S0907154E Page 3 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn 3 Contents Page 1 COVER PAGE .......................................................................................................................................... 1 2TEST SUMMARY................................................................................................................................................... 2 3CONTENTS............................................................................................................................................................. 3 4GENERAL INFORMATION.................................................................................................................................. 5 4.1G ENERALDESCRIPTION OF E.U.T.................................................................................................................. 5 4.2D ETAILS OF E.U.T........................................................................................................................................... 5 4.3T ESTMODE..................................................................................................................................................... 5 4.4T ESTFACILITY................................................................................................................................................. 6 4.5T ESTLOCATION............................................................................................................................................... 6 5EQUIPMENT USED DURING TEST................................................................................................................... 7 5.1E QUIPMENTS LIST........................................................................................................................................... 7 5.2M EASUREMENTUNCERTAINTY........................................................................................................................ 7 5.3T ESTEQUIPMENT CALIBRATION..................................................................................................................... 7 6CONDUCTED EMISSION..................................................................................................................................... 8 6.1E.U.T. O PERATION.......................................................................................................................................... 8 6.2EUT S ETUP..................................................................................................................................................... 8 6.3C ONDUCTED EMISSION TEST RESULT............................................................................................................ 9 7RADIATED EMISSIONS..................................................................................................................................... 11 7.1EUT O PERATION :......................................................................................................................................... 11 7.2T ESTSETUP.................................................................................................................................................. 12 7.3S EPCTRUMANALYZER SETUP...................................................................................................................... 13 7.4T ESTPROCEDURE......................................................................................................................................... 14 7.5C ORRECTED AMPLITUDE&MARGIN CALCULATION..................................................................................... 14 7.6S UMMARY OF TESTRESULTS......................................................................…

Text truncated - open the document above for the full version.

External Photos

Reference No.: WTS13S0907154E Page 66 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn 16 Photographs - Constructional Details 16.1 EUT – External View Reference No.: WTS13S0907154E Page 67 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn Reference No.: WTS13S0907154E Page 68 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn Wifi antenna

ID Label/Location Info

FCC Label Location for model: HE406LL/A The Label must not be a stick-on paper. The Label on these products must be permanently affixed to the product and readily visible at the time of purchase and must last the expected lifetime of the equipment not be readily detachable. Bretford Manufacturing, Inc. Model No.: HE406LL/A FCC ID: YY9-HE406LLA This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any nterference received, including interference that may cause undesired operation.

ID Label/Location Info

FCC Label FCC Label Sample for model: HE406LL/A FCC ID: YY9-HE40 6LLA This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.

Internal Photos

Reference No.: WTS13S0907154E Page 69 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn 16.2 EUT- Internal View Reference No.: WTS13S0907154E Page 70 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn Reference No.: WTS13S0907154E Page 71 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn Reference No.: WTS13S0907154E Page 72 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn Reference No.: WTS13S0907154E Page 73 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn Reference No.: WTS13S0907154E Page 74 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn Reference No.: WTS13S0907154E Page 75 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn Reference No.: WTS13S0907154E Page 76 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn Reference No.: WTS13S0907154E Page 77 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn 16.3 WIFI Module View Wifi Module Reference No.: WTS13S0907154E Page 78 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn 16.4 BT Module View RF ceramic antenna Bluetooth Module Reference No.: WTS13S0907154E Page 79 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn ============End of Test Report============

Test Report

TEST REPORT Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn Page 1 of 52 FCC ID : YY9-HE406LLA Applicant : Bretford Manufacturing, Inc. Address : 11000 Seymour Ave Franklin Park IL 60131 USA Manufacturer : BCD China Electronics Manufacturing (Shenzhen) Ltd Address : 3/F&5/F, Bldg B2, Xin An No. 3 Industrial Park, Hang Cheng Industrial Zone, Qian Jin Road, Xi Xiang, Bao An District, Shenzhen, Guangdong, Equipment Under Test (EUT) : Product Name : PowerSync Station 20 for iPad and iPad mini Model No. : HE406LL/A Standards : FCC CFR47 Part 15 C Section 15.247:2012 Date of Test : Sep 05~25, 2013 Date of Issue : Nov 13, 2013 Test Result :PASS* Remark: * The sample described above has been tested to be in compliance with the requirements of RSS-Gen Issue 3:2010. The test results have been reviewed and comply with the rules listed above and found to meet their essential requirements. The results shown in this test report refer only to the sample(s) tested, this test report cannot be reproduced, except in full, without prior written permission of the company. The report would be invalid without Sepcific stamp of test institute and the signatures of compiler and approver. Prepared By: Waltek Services (Shenzhen) Co., Ltd. Address: 1/F., Fukangtai Building, West Baima Road, Songgang Street, Baoan District, Shenzhen, Guangdong, China Testing location: 1/F., Fukangtai Building, West Baima Road, Songgang Street, Baoan District, Shenzhen, Guangdong, China Tel :+86-755-83551033 Fax:+86-755-83552400 Compiled by: Approved by: Maikou Zhang / Project Engineer Philo Zhong / Manager Reference No.: WTS13S0907158E Page 2 of 52 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn 2 Test Summary Test Items Test Requirement Result Radiated Emissions 15.205(a) 15.209(a) PASS Conducted Emissions 15.207(a) PASS 6dB Bandwidth 15.247(a)(2) PASS Maximum Peak Output Power 15.247(b)(3),(4) PASS Power Sepctral Density 15.247(e) PASS Band Edge 15.247(d) PASS Emissions from out of band 15.247(d) PASS Antenna Requirement 15.247(d) PASS Maximum Permissible Exposure (Exposure of Humans to RF Fields) 15.203 PASS Reference No.: WTS13S0907158E Page 3 of 52 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn 3 Contents Page 1 COVER PAGE .......................................................................................................................................... 1 2TEST SUMMARY...................................................................................................................................................2 3CONTENTS.............................................................................................................................................................3 4GENERAL INFORMATION..................................................................................................................................5 4.1G ENERALDESCRIPTION OF E.U.T.................................................................................................................. 5 4.2D ETAILS OF E.U.T........................................................................................................................................... 5 4.3T ESTFACILITY................................................................................................................................................. 5 4.4T ESTLOCATION............................................................................................................................................... 5 5EQUIPMENT USED DURING TEST...................................................................................................................6 5.1E QUIPMENTS LIST........................................................................................................................................... 6 5.2M EASUREMENTUNCERTAINTY........................................................................................................................ 6 5.3T ESTEQUIPMENT CALIBRATION..................................................................................................................... 6 6CONDUCTED EMISSION.....................................................................................................................................7 6.1E.U.T. O PERATION.......................................................................................................................................... 7 6.2EUT S ETUP..................................................................................................................................................... 7 6.3C ONDUCTED EMISSION TEST RESULT............................................................................................................ 8 7RADIATED EMISSIONS.....................................................................................................................................10 7.1EUT O PERATION :......................................................................................................................................... 10 7.2T ESTSETUP.................................................................................................................................................. 11 7.3S EPCTRUMANALYZER SETUP...................................................................................................................... 12 7.4T ESTPROCEDURE......................................................................................................................................... 13 7.5C ORRECTED AMPLITUDE&MARGIN CALCULATION..................................................................................... 13 7.6S UMMARY OF TESTRESULTS....................................................................................................................... 14 8BAND EDGE MEASUREMENT........................................................................................................................22 8.1T ESTPRODUCE...........................…

Text truncated - open the document above for the full version.

Test Setup Photos

Reference No.: WTS13S0907154E Page 64 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn 15 Photographs – Test Setup 15.1 Conducted Emission 15.2 Radiated Emission Test frequency below 30MHz Reference No.: WTS13S0907154E Page 65 of 79 Waltek Services (Shenzhen) Co.,Ltd. http://www.waltek.com.cn Test frequency from 30MHz to 1GHz Test frequency above 1GHz

Contact Information

Applicant

Chris Brandel(Product Development)
[email protected]847.801.1613Fax: 847.671.9537

Test Firm

Waltek Services(Shenzhen) Co., Ltd.Philo zhong
[email protected]0086-755-27553488Fax: 0086-755-27553868

Technical Specifications

#Rule PartsFrequency RangePower Output
215C2.41 GHz - 2.46 GHz69.30 mW
Confidentiality
Long Term
Grant Notes
Power listed is conducted. This device must be installed to provide a separation distance of at least 20 cm from all persons. End users and installers must be provided with antenna installation instructions and transmitter operating conditions for satisfying RF exposure compliance.

Other Applications from Bretford Manufacturing, Inc.

POWERSYNC CART 20 OR 40 FOR IPAD AND IPAD MINI - FCC ID YY9-HE405407 - Bretford Manufacturing, Inc.
YY9-HE405407

POWERSYNC CART 20 OR 40 FOR IPAD AND IPAD MINI

Dec 17, 2013

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
Bretford PowerSync Cart for iPad - FCC ID YY9H3635 - Bretford Manufacturing, Inc.
YY9H3635

Bretford PowerSync Cart for iPad

Dec 22, 2010

Equipment Class

JBP - Part 15 Class B Computing Device Peripheral