
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
FCC STATEMENT 1. This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference. (2) This device must accept any interference received, including interference that may cause undesired operation. 2. Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: Reorient or relocate the receiving antenna. Increase the separation between the equipment and receiver. Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. Consult the dealer or an experienced radio/TV technician for help. FCC Radiation Exposure Statement This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment.
LIGHTCOM TECHNOLOGY CO., LTD FCC Confidentiality Request Number:CF303 Version:V05 Date: 21-05-2012 (Permanent or also called long term confidentiality is the normal method to keep certain docuements confidential, and may apply to schematics, block diagrams, operational description and bill of materials.) To: Federal Communications Commission Equipment Authorization Branch 7435 Oakland Mills Road Columbia, MD 21046 Pursuant to 47 CFR Section 0.459(a) & (b), we, (the applicant / grantee) Company nameLIGHTCOM TECHNOLOGY CO., LTD AddressDahou Administer District, Xiegang Town, CityDongguan CountryChina request for this certification filing under: Grantee CodeProduct Number FCC ID:ZJA-72-003 to maintainpermanent confidentialityfor the following documents submitted within this application: (please cross what is applicable, or add other documents, provide the file name and description) ExhibitFile NameDescription โ Operational DescriptionOperational Descriptionexplaining the functioning of the block diagram โ Block DiagramsBlock Diagramsshowing the systematic building blocks of the EUT โ Schematics DiagramsSchematicsshowing components, their values and interconnection Bill of MaterialsList of components used on the PCBโs of the EUT Above materials crossed contain secrets, proprietary and technical information, which would customarily be guarded from competitors under 47 CFR, section 0.457(d)(2). Disclosure or publication or any portion of this company confidential material to other parties could cause substantial competitive harm and provide unjustified benefits for competitors. We understand that pursuant to 47 CFR section 0.457(d)(1)(ii) disclosure of the applicant and all accompanying documentation will not be made before the date of the grant. The documents indicated as confidential above, are not publicly available elsewhere. Attestation: City and Country:Date:Name: (this must be a person) Function:Signature: (or official company stamp) Dongguan, China2014-05-09 Shengxiang LiPurchasing Agent
Figure 1 The EUT-Overall View Figure 2 The EUT- Front View Figure 3 The EUT- Back View
Product Name:120CT BLUETOOTH LED C6 LIGHTS Model No.:72-003 FCC ID:ZJA-72-003 This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation.
FCC RF Exposure FCC ID: ZJA-72-003 Frequency: 2402-2480 MHz (79 channels) Mid-Channel: 2.441 GHz (channel 39) Mid-Channel Peak Power, Conducted: 1.21 dBm == 1.33 mW Antenna Gain: G = 0 dBi Peak, Radiated = 1.21 dBm + 0 dBi = 1.21 dBm = 1.33 mW SAR Test Exclusion Thresholds specified in KDB447498 Appendix A: Evaluation: The Calculated Radiated Peak output power is taken as worst case, and this emission level appears to be far under the maximum allowed emission level at even the closest distance for 2.4G device specified in this table. Conclusion: The emitted power appears to be (far) below the required limit, so PASS.
Shenzhen Anbotek Compliance Laboratory Limited FCC ID: ZJA-72-003 Page 1 of 50 Report No.: R011405014E Shenzhen Anbotek Compliance Laboratory Limited Tel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com FCC TEST REPORT for LIGHTCOM TECHNOLOGY CO., LTD 120CT BLUETOOTH LED C6 LIGHTS Model No.: 72-003 Report Number:R011405014E Date of Test:May 06~12, 2014 Date of Report:May 12, 2014 Prepared fo r:LIGHTCOM TECHNOLOGY CO., LTD Address:Dahou Administe rDistrict, XiegangTown, Dongguan, China Prepared By:Shenzhen Anbotek Compliance LaboratoryLimited Address:1/F., Building 1, SEC Industrial Park, No.0409 Qianhai Road, Nanshan District, Shenzhen, Guangdong, China Tel: (86) 755-26066544 Fax: (86) 755-26014772 Shenzhen Anbotek Compliance Laboratory Limited FCC ID: ZJA-72-003 Page 2 of 50 Report No.: R011405014E Shenzhen Anbotek Compliance Laboratory Limited Tel:(86)755-26066544 Fax:(86)755-26014772 www.anbotek.com TABLE OF CONTENTS Description Page Test Report 1. GENERAL INFORMATION......................................................................................................5 1.1 Description of Device (EUT).................................................................................................................5 1.2 Auxiliary Equipment Used during Test................................................................................................. 6 1.3 Description of Test Facility................................................................................................................... 6 1.4 Measurement Uncertainty......................................................................................................................6 2. TEST PROCEDURE....................................................................................................................7 3. CONDUCTED EMISSION......................................................................................................... 8 3.1 Block Diagram of Test Setup.................................................................................................................8 3.2 Power Line Conducted Emission Measurement Limits (15.207)..........................................................8 3.3 Configuration of EUT on Measurement................................................................................................ 8 3.4 Operating Condition of EUT................................................................................................................. 8 3.5 Test Procedure....................................................................................................................................... 9 3.6 Power Line Conducted Emission Measurement Results....................................................................... 9 4. RADIATION INTERFERENCE.............................................................................................. 12 4.1 Requirements (15.247, 15.209):...........................................................................................................12 4.2 Test Procedure..................................................................................................................................... 12 4.3 Test Results..........................................................................................................................................12 5. CHANNEL SEPARATION TEST............................................................................................21 5.1 Measurement Procedure.......................................................................................................................21 5.2 Test SET-UP........................................................................................................................................ 21 5.3 Test Equipment.................................................................................................................................... 21 5.4 Test Results..........................................................................................................................................22 6. 20DB BANDWIDTH TEST.......................................................................................................26 6.1 Measurement Procedure.......................................................................................................................26 6.2 Test SET-UP........................................................................................................................................ 26 6.3 Test Equipment.................................................................................................................................... 26 6.4 Test Results..........................................................................................................................................26 7. QUANTITY OF HOPPING CHANNEL TEST...................................................................... 30 7.1 Measurement Procedure.......................................................................................................................30 7.2 Test SET-UP........................................................................................................................................ 30 7.3 Test Equipment.................................................................................................................................... 30 7.4 Test Results..........................................................................................................................................30 8. DWELL TIME TEST................................................................................................................32 8.1 Measurement Procedure.......................................................................................................................32 8.2 Test SET-UP........................................................................................................................................ 32 8.3 Test Equipโฆ
Text truncated - open the document above for the full version.
1 Photo of Conducted Emission Test 2 Photo of Radiation Emission Test
Rietven 31 ยท Enschede, Overyssel ยท Netherlands
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 1.33 mW |

CHRISTMAS LIGHTS WITH REMOTE CONTROLLER
Equipment Class
CYY - Communications Receiver used w/Pt 15 Transmitter
WIRELESS REMOTE CONTROLLER
Equipment Class
DSC - Part 15 Security/Remote Control Transmitter