Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
NOTICE This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: —Reorient or relocate the receiving antenna. —Increase the separation between the equipment and receiver. —Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. —Consult the dealer or an experienced radio/TV technician for help. FCC Warning: This device complies with part 15 of the FCC Rules.Operation is subject to the following two conditions: (1)This device may not cause harmful interference,and (2)This device must accept any interference received,including interference that may cause undesired operation Changes or modifications not expressly approved by the paty responsible for compliance could void the user’s authority to operate the equipment
SCS-F18: Project and Product Certification Representative Authorization Letter Page 1 of 2 Rev 2.0 2206 Ringwood Avenue San Jose, CA 95131 Tel: 408-526-1188 Fax: 408-526-1088 Email: [email protected] Project and Product Certification Representative Authorization Letter Reason for Amendment (current / obsolete) Revision History Approved Date From To Initial Release (current) 1.0 1.0 Nov-14-2006 Revised wording (current) 1.0 2.0 Sept–25-2007 SCS-F18: Project and Product Certification Representative Authorization Letter Page 2 of 2 Rev 2.0 (Netac Technology Co., Ltd) (2011-07-12) To: SIEMIC, INC. 2206 Ringwood Avenue, San Jose, CA 95131 USA Dear Sir/Madam, Re: Project and Product Certification Representative Authorization Letter We, __ Netac Technology Co., Ltd ___ _hereby authorize World Standardization Certification & Testing CO., LTD. to act as a Certification Body for certifying for the following project(s): (Product description: USB 3.0 Portable Hard Disk model name: K901, K902, K910, K203, K303, E601 FCC ID: ZSE-K910 We affirm that between WSCT and __ Netac Technology Co., Ltd _ __, any difference in understanding, including test plan, measurement methods, applicable standards and relevant procedures and processes have been resolved prior to commencement of testing activities. Sincerely, Client’s signature Client’s name / title: Kevin Liu / Quality Engineer Contact information / address: 6F, Incubator Building, China Academy of Science & Tech Development, High-Tech Zone, Nanshan, Shenzhen, Guangdong 518057, China
EXTERIOR PHOTOGRAPHS
FCC ID: ZSE-K910 Label Location on EUT ID Label: FCC ID: ZSE-K910 This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. MADE IN CHINA
INTERIOR PHOTOGRAPHY
Page 1 FCC ID TEST REPORT for USB 3.0 Portable Hard Disk MODEL: K901, K902, K910, K203, K303, E601 Trade Mark: FCC ID: ZSE-K910 Test Report Number: WSCT11070331E Issued Date: July 12, 2011 Issued for: Netac Technology Co., Ltd 6F, Incubator Building, China Academy of Science & Tech Development, High-Tech Zone, Nanshan, Shenzhen, Guangdong 518057, China Issued by: World Standardization Certification & Testing CO., LTD. Building A, Baoshi Road, Baoshi Science & Technology Park, Bao’an District, Shenzhen, Guangdong, China TEL: +86-755-26996192 FAX: +86-755-26996253 Note: This report shall not be reproduced except in full, without the written approval of World Standardization Certification& Testing CO., LTD. This document may be altered or revised by World Standardization Certification& Testing CO., LTD. personnel only, and shall be noted in the revision section of the document. The test results in the report only apply to the tested sample. Report reference No.:WSCT11070331E Issued: July 12, 2011 Revised: None TRF No.: FCC Part 15B-13/A0 Page 2 of 27 FCC ID: ZSE-K910 This report shall not be reproduced except in full, without the written approval of World Standardization Certification & Testing CO., LTD. Revision History Rev. Issue No. Revisions Effect Page Revised By 00 WSCT11070331E Initial Issue ALL Kallen Wang Report reference No.:WSCT11070331E Issued: July 12, 2011 Revised: None TRF No.: FCC Part 15B-13/A0 Page 3 of 27 FCC ID: ZSE-K910 This report shall not be reproduced except in full, without the written approval of World Standardization Certification & Testing CO., LTD. TABLE OF CONTENTS 1 TEST RESULT CERTIFICATION ................................................................................................. 4 2 EUT DESCRIPTION ..................................................................................................................... 5 3 TEST METHODOLOGY ................................................................................................................ 6 3.1. DECISION OF FINAL TEST MODE ........................................................................................................ 6 3.2. EUT SYSTEM OPERATION ................................................................................................................... 6 4 SETUP OF EQUIPMENT UNDER TEST ...................................................................................... 7 4.1. DESCRIPTION OF SUPPORT UNITS ................................................................................................... 7 4.2. CONFIGURATION OF SYSTEM UNDER TEST .................................................................................... 7 5 FACILITIES AND ACCREDITATIONS ......................................................................................... 8 5.1. FACILITIES ............................................................................................................................................. 8 5.2. ACCREDITATIONS ................................................................................................................................. 8 5.3. MEASUREMENT UNCERTAINTY .......................................................................................................... 8 6 CONDUCTED EMISSION MEASUREMENT ............................................................................... 9 6.1. LIMITS OF CONDUCTED EMISSION MEASUREMENT ....................................................................... 9 6.2. TEST INSTRUMENTS ............................................................................................................................ 9 6.3.TEST PROCEDURES ............................................................................................................................ 10 6.4. TEST SETUP ........................................................................................................................................ 11 6.5. TEST RESULTS .................................................................................................................................... 11 7 RADIATED EMISSION MEASUREMENT .................................................................................. 14 7.1. LIMITS OF RADIATED EMISSION MEASUREMENT .......................................................................... 14 7.2. TEST INSTRUMENTS .......................................................................................................................... 14 7.3. TEST PROCEDURES ........................................................................................................................... 15 7.4. TEST SETUP ........................................................................................................................................ 17 7.5. TEST RESULTS .................................................................................................................................... 18 8 PHOTOGRAPHS OF THE TEST CONFIGURATION ................................................................ 22 9 PHOTOGRAPHS OF EUT .......................................................................................................... 25 Report reference No.:WSCT11070331E Issued: July 12, 2011 Revised: None TRF No.: FCC Part 15B-13/A0 Page 4 of 27 FCC ID: ZSE-K910 This report shall not be reproduced except in full, without the written approval of World Standardization Certification & Testing CO., LTD. 1 TEST RESULT CERTIFICATION Product: USB 3.0 Portable Hard Disk Model: K901, K902, K910, K203, K303, E601 Trade Mark: Applicant: Netac Technology Co., Ltd 6F, Incubator Building, China Academy of Science & Tech Development, High-Tech Zone, Nanshan, Shenzhen, Guangdong 518057, China Manufacturer: Netac Technology Co., Ltd Yueliangwan Division 3-5F, No.11, Lishan Industrial Park, Xinghai Road, Nanshan, Shenzhen, Guangdong 518052, China Tested Date: June 28 ~ July 12, 2011 Test Voltage: DC 5V(PC Input AC 120V/60Hz) EMISSION Standard Item …
Text truncated - open the document above for the full version.
TEST SETUP PHOTOGRAPHY CONDUCTED EMISSION TEST RADIATED EMISSION TEST BELOW 1GHz RADIATED EMISSION TEST ABOVE 1GHz
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15B | - | - |

Home Network Drive
Equipment Class
DTS - Digital Transmission SystemUSB 3.0 Flash Drive
Equipment Class
JBP - Part 15 Class B Computing Device Peripheral