FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. EcoFlow Inc./
  3. 2A2P9-EFSD006

2A2P9-EFSD006WiFi/Bluetooth wireless Module

EcoFlow Inc.

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Jun 18, 2026
Application Purpose
Original Equipment
Equipment Note
WiFi/Bluetooth wireless Module
Frequency Range
2402.00000000 - 2480.00000000
Company
EcoFlow Inc.
Country
China

Documents & Files

Select a file to view

Attestation Statements

↗
↗
↗

Cover Letter(s)

↗
↗
↗
↗

ID Label/Location Info

↗

RF Exposure Info

↗

Test Report

↗
↗
↗
↗
↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Attestation Statements

EcoFlow Inc. Date: 5/14/2026 Federal Communications Commissions Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 RE: CFR 47 §2.911 (d)(5) Attestation FCC ID: 2A2P9-EFSD006 FCC FRN: 0031193519 1. EcoFlow Inc. (“the applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. 2. EcoFlow Inc. (“the applicant”) certifies that the device does not have cybersecurity and / or anti-virus software produced or provided by Kaspersky Lab, Inc. or any of its successors and assignees, identified on the Covered List installed on the device, nor will it be installed by the applicant anytime after certification. 3. EcoFlow Inc. (“the applicant”) certifies that the RF device is not a router “produced in a foreign country”. 4. EcoFlow Inc. (“the applicant”) certifies that, as of the date of the filing of the application, the applicant is not identified on the Covered List as an entity producing “covered” equipment and is not an affiliate or subsidiary of an entity identified on the Covered List. Sincerely yours, Signature Name: Vicky Guan Job Title: Engineer Company Name: EcoFlow Inc.

Attestation Statements

EcoFlowTechnologyInc Date:7/21/2025 FederalCommunicationsCommissions AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,MD21046 RE:CFR47§2.911(d)(7)FCCUSAgentLetterofAttestation GranteeCode:2A2P9 GranteeFRN:0031193519 Towhomitmayconcern: FCCUSAgent AgentCompanyName:EcoFlowTechnologyInc FCCFRN:0033593781 AgentContactName:YvonneZhou AgentUSAddress:1687114thAveSEsuite101Bellevue,WA98004UnitedStates AgentEmailAddress:[email protected] ThisletteristoconfirmthatwehaveacceptedtheresponsibilitytoactasUSAgentonbehalf ofEcoFlowInc.fortheabovereferencedFCCGranteeCode. Weareawareoftherequirementsandresponsibilitiesoftheapplicant’sagentforserviceof processasoutlinedintheFCCsection2.911(d)(7)andReportandOrderFCC22-84 paragraph63. Sincerely, Signature AuthorizedAgentContactPersonName:YvonneZhou AgentcontactJobTitle:EMCEngineer AgentCompanyname:EcoFlowTechnologyInc

Attestation Statements

EcoFlow Inc. Date: 5/14/2026 Federal Communications Commissions Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 RE: CFR 47 §2.911 (d)(7) Agent Designation Attestation Grantee Code: 2A2P9 Grantee FRN: 0031193519 EcoFlow Inc. (“the applicant”) as required by section 2.911(d)(7), designates the following agent, located in the United States, for purposes of acting as the applicant’s agent for service of process. The applicant acknowledges that they will maintain an agent for no less than one year after the grantee has terminated all marketing and importation or the conclusion of any Commission-related proceeding involving the equipment. The applicant further acknowledges their responsibility under CFR 47 §2.929(c) to inform the FCC whenever the agent information changes. U.S. Agent Information: Agent Company Name: EcoFlow Technology Inc FCC FRN: 0033593781 Agent Contact Name: Yvonne Zhou Agent US Address: 1687 114th Ave SE suite 101 Bellevue, WA 98004 United States Agent Email Address: [email protected] Sincerely yours, Signature Name: Vicky Guan Job Title: Engineer Company Name: EcoFlow Inc.

Cover Letter(s)

EcoFlow Inc. Date: 5/14/2026 UL Verification Services Inc. 47173 Benicia Street Fremont, CA 94538, USA To whom it may concern: I, the undersigned, hereby authorize UL Verification Services Inc. to act on our behalf in all manners relating to application for equipment authorization, including signing of all documents relating to these matters. Any and all acts carried out by UL Verification Services Inc. on our behalf shall have the same effect as acts of our own. I, the undersigned, hereby certify that we are not subject to a denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. § 862 because of a conviction for possession or distribution of a controlled substance. In authorizing UL Verification Services Inc. as our representative, we still recognize that we are responsible to: a) fulfill the requirements for the scope of certification requested, including implementing any appropriate changes requested by UL Verification Services Telecommunications Certification Body (TCB) and / or the FCC; b) supply any and all information needed for the evaluation of the products for which certification is sought; c) make claims regarding certification only in respect of the scope for which certification has been granted; d) not use our product certification in such a manner as to bring the TCB or FCC into disrepute and to not make any statement regarding product certification which the TCB or FCC may consider misleading or unauthorized; e) discontinue use of all advertising matter that contains any reference thereto and complies with any and all actions required by the FCC upon suspension or cancellation of certification; f) use certification only to indicate that products are certified in conformity with specified standards; g) endeavor to ensure that no certificate or report or any part thereof is used in a misleading manner, and any copies of the grants/certificates shall be reproduced in their entirety; h) comply with the requirements of the TCB and FCC, including the use of marks and label information prescribed for the scope of certification, when making reference to product certification in communication media such as documents, brochure or advertisements; i) comply with the requirements for certification, supply any information needed for evaluation of products to be certified and, where applicable, make provision for the participation of observers; j) ensure that products marketed under the scope of the requested certification continue to comply with the certification requirements; k) provide a sample of a production unit for testing within 30 days of the request should this product be selected as part of either the TCB’s or the FCC’s market surveillance requirements; l) keep a record of all complaints relating to product’s compliance with requirements of relevant standard; make records available to UL or FCC when requested; take appropriate action with respect to such complaints and any deficiencies found in the product that affect compliance with requirements for certification; document the actions taken with respect to complaints and/or deficiencies; m) inform the TCB immediately of any changes that may affect its ability to comply with the certification requirements. This authorization is valid until further written notice from the applicant. Sincerely Yours, Company Name: EcoFlow Inc. Contact Name: Vicky Guan Title of Person: Engineer Address: RM 401,Plant #1, Runheng Industrial Zone, Fuhai Street, Bao'an District, Shenzhen, 518000, China Date: 05/14/2026

Cover Letter(s)

EcoFlow Inc. DATE : 2026-05-14 Equipment Autorisation Division Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 Request for Short-Term Confidentiality Company name: EcoFlow Inc. FCC ID: 2A2P9-EFSD006 FCC Part 15 Certification Pursuant to Sections 0.457 and 0.459 of the commission rules, and in accordance with the FCC Public notice dated June 15, 2004 (DA 04-1705), we hereby request short-term confidentiality for the following items prior to marketing the device.: (1) Test Setup Photos (2) External Photos (3) Internal Photos (4) User Manual (5) Antenna photos and test setup photos The applicant requests the exhibits selected above as short term confidential be withheld from public view for a period of 180 days from the date of the Grant of Equipment Authorization and prior to marketing. This is to avoid premature release of sensitive information prior to marketing or release of the product to the public. Sincerely, Company Name: EcoFlow Inc. Contact Name: Vicky Guan Title of Person: Engineer Address: RM 401, Plant #1, Runheng Industrial Zone, Fuhai Street, Bao'an District, Shenzhen, 518000, China

Cover Letter(s)

EcoFlow Inc. Federal Communications Commission 7435 Oakland Mills Road Columbia MD 21046 Subject: Request for Confidentiality FCC ID: 2A2P9-EFSD006 To Whom It May Concern: Pursuant to the provisions of Sections 0.457 and 0.459 of the Commission’s rules (47 CFR §§ 0.457, 0.459), we are requesting the Commission to withhold the following attachments as confidential document from public disclosure indefinitely. Schematic Diagram Block Diagram Theory of Operation Above mentioned document contains detailed system and equipment description are considered as proprietary information in operation of the equipment. The public disclosure of above documents might be harmful to our company and would give competitor an unfair advantage in the market. It is our understanding that all measurement test reports, FCC ID label format and correspondent during certification review process cannot be granted as confidential documents and those information will be available for public review once the grant of equipment authorization is issued. Best Regards Company Name: EcoFlow Inc. Contact Name: Vicky Guan Title of Person: Engineer Address: RM 401,Plant #1, Runheng Industrial Zone, Fuhai Street, Bao'an District, Shenzhen, 518000, China Date: 05/14/2026

Cover Letter(s)

Modular Approval Request FCC (Per 15.212) FCC ID: 2A2P9-EFSD006 Items to be covered Answer From Applicant 1. The radio elements of the modular transmitter must have their own shielding. The physical crystal and tuning capacitors may be located external to the shielded radio elements. Yes The EUT module does contain its shield 2. The modular transmitter must have buffered modulation/data inputs (if such inputs are provided) to ensure that the module will comply with part 15 requirements under conditions of excessive data rates or over- modulation. Yes The module’s transmitter chip utilizes buffered data inputs. 3. The modular transmitter must have its own power supply regulation. Yes The module contains its own power supply regulator chip. 4. The modular transmitter must comply with the antenna and transmission system requirements of §§ 15.203, 15.204(b) and 15.204(c). The antenna must either be permanently attached or employ a “unique” antenna coupler (at all connections between the module and the antenna, including the cable). The “professional installation” provision of § 15.203 is not applicable to modules but can apply to limited modular approvals under paragraph (b) of this section. Yes Please refer to the Operation Description. 5. The modular transmitter must be tested in a stand-alone configuration, i.e., the module must not be inside another device during testing for compliance with part 15 requirements. Unless the transmitter module will be battery powered, it must comply with the AC line conducted requirements found in § 15.207. AC or DC power lines and data input/output lines connected to the module must not contain ferrites, unless they will be marketed with the module (see § 15.27(a)). The length of these lines shall be the length typical of actual use or, if that length is unknown, at least 10 centimeters to insure that there is no coupling between the case of the module and supporting equipment. Any accessories, peripherals, or support equipment connected to the module during testing shall be unmodified and commercially available (see § 15.31(i)). Yes Please refer to the test reports. 6. The modular transmitter must be equipped with either a permanently affixed label or must be capable of electronically displaying its FCC identification number. (A) If using a permanently affixed label, the modular transmitter must be labeled with its own FCC identification number, and, if the FCC identification number is not visible when the module is installed inside another device, then the outside of the device into which the module is installed must also display a label referring to the enclosed module. This exterior label can use wording such as the following: “Contains Transmitter Module FCC ID: XYZMODEL1” or “Contains FCC ID: XYZMODEL1.” Any similar wording that expresses the same meaning may be used. Yes Please refer to Label and location/User manual. The Grantee may either provide such a label, an example of which must be included in the application for equipment authorization, or, must provide adequate instructions along with the module which explain this requirement. In the latter case, a copy of these instructions must be included in the application for equipment authorization. (B) If the modular transmitter uses an electronic display of the FCC identification number, the information must be readily accessible and visible on the modular transmitter or on the device in which it is installed. If the module is installed inside another device, then the outside of the device into which the module is installed must display a label referring to the enclosed module. This exterior label can use wording such as the following: “Contains FCC certified transmitter module(s).” Any similar wording that expresses the same meaning may be used. The user manual must include instructions on how to access the electronic display. A copy of these instructions must be included in the application for equipment authorization. 7. The modular transmitter must comply with any specific rules or operating requirements that ordinarily apply to a complete transmitter and the manufacturer must provide adequate instructions along with the module to explain any such requirements. A copy of these instructions must be included in the application for equipment authorization. Yes Please refer to the user manual. 8. Radio frequency devices operating under the provisions of this part are subject to the radio frequency radiation exposure requirements specified in §§ 1.1307(b), 1.1310, 2.1091, and 2.1093 of this chapter, as appropriate. Applications for equipment authorization of modular transmitters under this section must contain a statement confirming compliance with these requirements. The modular transmitter must comply with any applicable RF exposure requirements in its final configuration. Technical information showing the basis for this statement must be submitted to the Commission upon request. Yes Please refer to RF exposure. Note: If compliance with one or more of the numbered requirements, listed above, cannot be demonstrated, it may be possible to obtain a “Limited Modular Approval” (LMA). Signature Contact Name: Vicky Guan Title of Person: Engineer Company Name: EcoFlow Inc.

ID Label/Location Info

RF chip & Label location

RF Exposure Info

The results reported herein have been performed in accordance with the laboratory’s terms of accreditation. This report shall not be reproduced except in full without the written approval of the Laboratory. The results in this report apply to the test sample(s) mentioned above at the time of the testing period only and are not to be used to indicate applicability to other similar products. FCC RF EXPOSURE REPORT For WiFi/Bluetooth wireless Module MODEL NUMBER: OS-SD006-PD REPORT NUMBER: 4792249455.2-RF-3 ISSUE DATE: May 28, 2026 FCC ID: 2A2P9-EFSD006 Prepared for EcoFlow Inc. RM 401, Plant #1, Runheng Industrial Zone, Fuhai Street, Bao'an District, Shenzhen, 518000, China Prepared by UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch Room 101, Building 2, No.4, Information Road, Songshan Lake, Dongguan, Guangdong, China Tel: +86 769 22038881 Fax: +86 769 33244054 Website: www.ul.com REPORT NO.: 4792249455.2-RF-3 Page 2 of 7 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Revision History Rev. Issue Date Revisions Revised By V0 May 12, 2026 Initial Issue REPORT NO.: 4792249455.2-RF-3 Page 3 of 7 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. TABLE OF CONTENTS 1. ATTESTATION OF TEST RESULTS ................................................................................. 4 2. TEST METHODOLOGY ..................................................................................................... 5 3. FACILITIES AND ACCREDITATION ................................................................................. 5 4. REQUIREMENT ................................................................................................................. 6 REPORT NO.: 4792249455.2-RF-3 Page 4 of 7 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. 1. ATTESTATION OF TEST RESULTS Applicant Information Company Name: EcoFlow Inc. Address: RM 401, Plant #1, Runheng Industrial Zone, Fuhai Street, Bao'an District, Shenzhen, 518000, China Manufacturer Information Company Name: EcoFlow Inc. Address: RM 401, Plant #1, Runheng Industrial Zone, Fuhai Street, Bao'an District, Shenzhen, 518000, China EUT Information EUT Name: WiFi/Bluetooth wireless Module Model: OS-SD006-PD Brand: ECOFLOW; EF ECOFLOW Sample Received Date: May 11, 2026 Sample Status: Normal Sample ID: 9732141 Date of Tested: May 22, 2026 to May 28, 2026 APPLICABLE STANDARDS STANDARD TEST RESULTS 447498 D04 Interim General RF Exposure Guidance v01 PASS Prepared By: Checked By: Johnson Liu Kebo Zhang Laboratory Engineer Associate Operations Leader Approved By: Stephen Guo Operations Manager REPORT NO.: 4792249455.2-RF-3 Page 5 of 7 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. 2. TEST METHODOLOGY The tests documented in this report were performed in accordance with 47 CFR FCC Part 2 Subpart J, section 2.1091 and KDB 447498 D04 General RF Exposure Guidance v01. 3. FACILITIES AND ACCREDITATION Accreditation Certificate A2LA (Certificate No.: 4102.01) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. has been assessed and proved to be in compliance with A2LA. FCC (FCC Designation No.: CN1187) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. Has been recognized to perform compliance testing on equipment subject to the Commission's Declaration of Conformity (DoC) and Certification rules. ISED (Company No.: 21320) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. has been registered and fully described in a report filed with ISED. The Company Number is 21320 and the test lab Conformity Assessment Body Identifier (CABID) is CN0046. VCCI (Registration No.: C-20202, G-20240, R-20248 and T-20202) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. has been assessed and proved to be in compliance with VCCI, the Membership No. is 3793. Facility Name: Chamber E, the VCCI registration No. is G-20240 and R-20248 Shielding Room F, the VCCI registration No. is C-20202 and T-20202 Note 1: All tests measurement facilities use to collect the measurement data are located at Room 101, Building 2, No.4, Information Road, Songshan Lake, Dongguan, Guangdong, China. Note 2: The test anechoic chamber in UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch had been calibrated and compared to the open field sites and the test anechoic chamber is shown to be equivalent to or worst case from the open field site. Note 3: For below 30 MHz, lab had performed measurements at test anechoic chamber and comparing to measurements obtained on an open field site. And these measurements below 30 MHz had been correlated to measurements performed on an OFS. REPORT NO.: 4792249455.2-RF-3 Page 6 of 7 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. 4. REQUIREMENT LIMIT AND CALCULATION METHOD According to 447498 D04 Interim General RF Exposure Guidance v01, 2.1.4 MPE-Based Exemption An alternative to the SAR-based exemption is provided in § 1.1307(b)(3)(i)(C), for a much wider frequency range, from 300 kHz to 100 GHz, applicable…

Text truncated - open the document above for the full version.

Test Report

The results reported herein have been performed in accordance with the laboratory’s terms of accreditation. This report shall not be reproduced except in full without the written approval of the Laboratory. The results in this report apply to the test sample(s) mentioned above at the time of the testing period only and are not to be used to indicate applicability to other similar products. FCC 47 CFR PART 15 SUBPART C ISED RSS-247 Issue 4 TEST REPORT For WiFi/Bluetooth wireless Module MODEL NUMBER: OS-SD006-PD REPORT NUMBER: 4792249455.2-RF-1 ISSUE DATE: May 28, 2026 FCC ID: 2A2P9-EFSD006 IC: 27618-EFSD006 Prepared for EcoFlow Inc. RM 401, Plant #1, Runheng Industrial Zone, Fuhai Street, Bao'an District, Shenzhen, 518000, China Prepared by UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch Room 101, Building 2, No.4, Information Road, Songshan Lake, Dongguan, Guangdong, China Tel: +86 769 22038881 Fax: +86 769 33244054 Website: www.ul.com REPORT NO.: 4792249455.2-RF-1 Page 2 of 84 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0035 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Revision History Rev. Issue Date Revisions Revised By V0 May 28, 2026 Initial Issue REPORT NO.: 4792249455.2-RF-1 Page 3 of 84 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0035 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Summary of Test Results Test Item Clause Limit/Requirement Result Antenna Requirement N/A FCC Part 15.203/15.247 (c) RSS-GEN Clause 6.8 Pass AC Power Line Conducted Emission ANSI C63.10-2020, Clause 6.2 FCC Part 15.207 RSS-GEN Clause 8.8 Pass Conducted Output Power ANSI C63.10-2020, Clause 11.9.1.2 FCC Part 15.247 (b)(3) RSS-247 Clause 6.3.2 Pass 6dB Bandwidth and 99% Occupied Bandwidth ANSI C63.10-2020, Clause 11.8.1 FCC Part 15.247 (a)(2) RSS-247 Clause 6.3.1 (a) RSS-Gen Clause 6.7 Pass Power Spectral Density ANSI C63.10-2020, Clause 11.10.2 FCC Part 15.247 (e) RSS-247 Clause 6.3.1 (b) Pass Conducted Band edge and spurious emission ANSI C63.10-2020, Clause 11.11 FCC Part 15.247(d) RSS-247 Clause 6.6 Pass Radiated Band edge and Spurious Emission ANSI C63.10-2020, Clause 11.12 FCC Part 15.247 (d) FCC Part 15.205/15.209 RSS-247 Clause 6.6 RSS-GEN Clause 8.9 Pass Duty Cycle ANSI C63.10-2020, Clause 11.6 None; for reporting purposes only. Pass Note: 1. For FCC, ANSI C63.10:2020 + Cor.1:2023 is also considered for the corresponding test item which is needed. 2. For ISED, this report is also performed according to ANSI C63.10-2020 + Cor.1-2023 + C63.10a-2024 + Errata to C63.10a-2024 standards. *This test report is only published to and used by the applicant, and it is not for evidence purpose in China. *The measurement result for the sample received is <Pass> according to <FCC 47 CFR PART 15 SUBPART C ISED RSS-247 Issue 4> when <Simple Acceptance> decision rule is applied. Decision rule for statement of conformity: The measurement uncertainty is not taken into account for statement of conformity. REPORT NO.: 4792249455.2-RF-1 Page 4 of 84 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0035 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. CONTENTS 1. ATTESTATION OF TEST RESULTS ..................................................................................... 6 2. TEST METHODOLOGY ......................................................................................................... 7 3. FACILITIES AND ACCREDITATION ..................................................................................... 7 4. CALIBRATION AND UNCERTAINTY ................................................................................... 8 4.1. MEASURING INSTRUMENT CALIBRATION ........................................................... 8 4.2. MEASUREMENT UNCERTAINTY ............................................................................ 8 5. EQUIPMENT UNDER TEST .................................................................................................. 9 5.1. DESCRIPTION OF EUT ........................................................................................... 9 5.2. CHANNEL LIST ........................................................................................................ 9 5.3. MAXIMUM POWER .................................................................................................. 9 5.4. TEST CHANNEL CONFIGURATION ...................................................................... 10 5.5. THE WORSE CASE POWER SETTING PARAMETER .......................................... 10 5.6. DESCRIPTION OF AVAILABLE ANTENNAS ......................................................... 10 5.7. SUPPORT UNITS FOR SYSTEM TEST ................................................................. 11 6. MEASURING EQUIPMENT AND SOFTWARE USED......................................................... 12 7. ANTENNA PORT TEST RESULTS ..................................................................................... 15 7.1. CONDUCTED OUTPUT POWER ........................................................................... 15 7.2. 6DB BANDWIDTH AND 99% OCCUPIED BANDWIDTH ........................................ 16 7.3. POWER SPECTRAL DENSITY .............................................................................. 18 7.4. CONDUCTED BAND EDGE AND SPURIOUS EMISSION ..................................... 19 7.5. DUTY CYCLE ......................................................................................................... 21 8. RADIATED TEST RESULTS ............................................................................................... 22 8.1. RESTRICT…

Text truncated - open the document above for the full version.

Test Report

The results reported herein have been performed in accordance with the laboratory’s terms of accreditation. This report shall not be reproduced except in full without the written approval of the Laboratory. The results in this report apply to the test sample(s) mentioned above at the time of the testing period only and are not to be used to indicate applicability to other similar products. FCC 47 CFR PART 15 SUBPART C ISED RSS-247 Issue 4 TEST REPORT For WiFi/Bluetooth wireless Module MODEL NUMBER: OS-SD006-PD REPORT NUMBER: 4792249455.2-RF-2 ISSUE DATE: May 28, 2026 FCC ID: 2A2P9-EFSD006 IC: 27618-EFSD006 Prepared for EcoFlow Inc. RM 401, Plant #1, Runheng Industrial Zone, Fuhai Street, Bao'an District, Shenzhen, 518000, China Prepared by UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch Room 101, Building 2, No.4, Information Road, Songshan Lake, Dongguan, Guangdong, China Tel: +86 769 22038881 Fax: +86 769 33244054 Website: www.ul.com REPORT NO.: 4792249455.2-RF-2 Page 2 of 131 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0035 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Revision History Rev. Issue Date Revisions Revised By V0 May 28, 2026 Initial Issue REPORT NO.: 4792249455.2-RF-2 Page 3 of 131 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0035 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Summary of Test Results Test Item Clause Limit/Requirement Result Antenna Requirement N/A FCC Part 15.203/15.247 (c) RSS-GEN Clause 6.8 Pass AC Power Line Conducted Emission ANSI C63.10-2020, Clause 6.2 FCC Part 15.207 RSS-GEN Clause 8.8 Pass Conducted Output Power ANSI C63.10-2020, Clause 11.9.2.3.1 FCC Part 15.247 (b)(3) RSS-247 Clause 6.3.2 Pass 6dB Bandwidth and 99% Occupied Bandwidth ANSI C63.10-2020, Clause 11.8.1 FCC Part 15.247 (a)(2) RSS-247 Clause 6.3.1 (a) RSS-Gen Clause 6.7 Pass Power Spectral Density ANSI C63.10-2020, Clause 11.10.5 & 11.10.3 FCC Part 15.247 (e) RSS-247 Clause 6.3.1 (b) Pass Conducted Band edge and spurious emission ANSI C63.10-2020, Clause 11.11 FCC Part 15.247(d) RSS-247 Clause 6.6 Pass Radiated Band edge and Spurious Emission ANSI C63.10-2020, Clause 11.12 FCC Part 15.247 (d) FCC Part 15.205/15.209 RSS-247 Clause 6.6 RSS-GEN Clause 8.9 Pass Duty Cycle ANSI C63.10-2020, Clause 11.6 None; for reporting purposes only. Pass Note: 1. For FCC, ANSI C63.10:2020 + Cor.1:2023 is also considered for the corresponding test item which is needed. 2. For ISED, this report is also performed according to ANSI C63.10-2020 + Cor.1-2023 + C63.10a-2024 + Errata to C63.10a-2024 standards. *This test report is only published to and used by the applicant, and it is not for evidence purpose in China. *The measurement result for the sample received is <Pass> according to <FCC 47 CFR PART 15 SUBPART C ISED RSS-247 Issue 4> when <Simple Acceptance> decision rule is applied. Decision rule for statement of conformity: The measurement uncertainty is not taken into account for statement of conformity. REPORT NO.: 4792249455.2-RF-2 Page 4 of 131 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0035 This report shall not be reproduced except in full, without the writte…

Text truncated - open the document above for the full version.

Contact Information

Applicant

Vicky Guan
[email protected]Fax: N.A.

Technical Contact

EcoFlow Technology IncYvonne Zhou
[email protected]

1687 114th Ave. SE · Bellevue, 98004 · United States

Test Firm

UL Verification Services (Guangzhou) Co., Ltd.Stephen Guo
[email protected]

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.40 GHz - 2.48 GHz1.50 mW
215C2.41 GHz - 2.46 GHz71.00 mW
Modular Type
Single Modular Approval
Confidentiality
Long Term
Grant Notes
Output power listed is Peak conducted for BLE and maximum average power for WLAN. This device operates with 20 MHz bandwidths. The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter. End-Users must be provided with transmitter operation conditions for satisfying RF exposure

Other Applications from EcoFlow Inc.

2A2P9-EFTT5PG1

Power Station

Jul 20, 2026

Equipment Class

DTS - Digital Transmission System
2A2P9-EFTT5CG1

Power Station

Jul 20, 2026

Equipment Class

NII - Unlicensed National Information Infrastructure TX
2A2P9-REEFWM36

EcoFlow 4G Dongle SEP

Apr 22, 2026

Equipment Class

PCB - PCS Licensed Transmitter
2A2P9-RE306

EcoFlow Smart Inlet Box

Jan 23, 2026

Equipment Class

DTS - Digital Transmission System
Wireless Module - FCC ID 2A2P9-AP306 - EcoFlow Inc.
2A2P9-AP306

Wireless Module

Dec 09, 2025

Equipment Class

DTS - Digital Transmission System