
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
2.Kstation kbeacon control 1, Connect kStation to network, computer connect WiFi, landing 192.168.10.1 or cable connection router, login the router IP, In login screen, enter the SSID: XXXXXXX, password: kstation, click login, kstation will be flashing green light, when long become green Said kstation on computer is already connected. Log on to https://www.admin.bcp.io, the user name: admin, password: admin, the following figure (a).Login after the global map, can choose you need to use kstation address, (2) the diagram below 3. Computer Binding kstation, login and then click the summary - kstation Binding, click kstation Bind above button at the same time, the computer began to control kstation.The following figure 4. Click on SCAN, after completion of binding kstation start scanning attachments kbeacon, green for kbeacon, below.Kstation scanning time, ten minutes show green kbeacon normal, red represents kbeacon damage or insufficient power supply. manual 一 二 This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. This device and its antenna(s) must not be co-located or operation in conjunction with any other antenna or transmitter. Note: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: —Reorient or relocate the receiving antenna. —Increase the separation between the equipment and receiver. —Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. —Consult the dealer or an experienced radio/TV technician for help.
Da t e FC C Sub j Dea Our The The uni n “De The If y o Yo u r Sign Clie n Clien Cont e ID: ject: A ttestat i r Sir s, products wi t tr ansmitter i device is als o nte ntio nal ra d eclar ation of Test lab: Co m ou ha ve any q rs sincer ely, atory nt ’ s si gnatu r e : nt ’s name / titl e act information : : : ion L etter “D th the abo ve s authorized o de fined as “ dia tor s, wher e Conf ormity” mpliance Cert ues tions, pl e e : / address: D eclar ation of FCC ID are d e under the “C “PC P eri pher y e we her eby procedure. tifica tion Ser v ease f eel free DOC AT TES TA T Conf ormity” efined as com Certific ation” y” acc to §15 declar e, tha t vices Inc. to con tac t m TION LET TER mposit e devic procedure. .101 Equipm e t we apply an me at the addr e. ent authoriza d fo llo w the ress shown b ation of below. Kopi Incorporation Limited Samuel Au / Director Kopi Incorporation Limited. Unit 716, Vanta Ind.Ctr.,21-33 Tai Lin Pai Roda, Kwai Chung, N.T., Address:No.81-1, Lane 210, Bade Rd. 2, Luchu Hsiang, Taoyuan Hsien, (338)Taiwan, R.O.C Test Report Number:1412023-E Date of issue:2014-12-2 2ABRB-KSTATION 2015-01-12 Hong Kong 8
Kopi Incorporation Limited Unit 716, Vanta Ind.Ctr.,21-33 Tai Lin Pai Roda, Kwai Chung, N.T., Hong Kong FCC Confidentiality Request Number: CF303 Version: V05 Date: 21-05-2012 (Permanent or also called long term confidentiality is the normal method to keep certain docuements confidential, and may apply to schematics, block diagrams, operational description and bill of materials.) To: Federal Communications Commission Equipment Authorization Branch 7435 Oakland Mills Road Columbia, MD 21046 Pursuant to 47 CFR Section 0.459(a) & (b), we, (the applicant / grantee) Company nameKopi Incorporation Limited AddressUnit 716, Vanta Ind.Ctr.,21-33 Tai Lin Pai Roda, Kwai Chung, N.T., CityHong Kong CountryChina request for this certification filing under: Grantee CodeProduct Number FCC ID:2ABRB-KSTATION to maintain permanent confidentiality for the following documents submitted within this application: (please cross what is applicable, or add other documents, provide the file name and description) ExhibitFile NameDescription xOperational Descriptionexplaining the functioning of the block diagram xBlock Diagramsshowing the systematic building blocks of the EUT xSchematics Diagramsshowing components, their values and interconnection Bill of MaterialsList of components used on the PCB’s of the EUT Above materials crossed contain secrets, proprietary and technical information, which would customarily be guarded from competitors under 47 CFR, section 0.457(d)(2). Disclosure or publication or any portion of this company confidential material to other parties could cause substantial competitive harm and provide unjustified benefits for competitors. We understand that pursuant to 47 CFR section 0.457(d)(1)(ii) disclosure of the applicant and all accompanying documentation will not be made before the date of the grant. The documents indicated as confidential above, are not publicly available elsewhere. Attestation: City and Country:Date:Name: (this must be a person) Function:Signature: (or official company stamp) Enschede, Netherlands20-01-2015M. Koop (authorized) Manager
Kopi Incorporation Limited Unit 716, Vanta Ind.Ctr.,21-33 Tai Lin Pai Roda, Kwai Chung, N.T., Hong Kong FCC Authorization Letter Number: CF304 Version: V03 Date: 01-08-2011 We, (the approval holder) Company name Kopi Incorporation Limited Address Unit 716, Vanta Ind.Ctr.,21-33 Tai Lin Pai Roda, Kwai Chung, N.T., City Hong Kong Country China declare that the following representative (agent): Name (person) KAIT CHEN Company name WST Certification & Testing (HK) Limited Address 12/F., San Toi Building,137-139 Connaught Road Central, City Hong Kong, Country China is hereby authorized to apply the following equipment for certification on our behalf: Product Description kStation Type or Model(s) kStation-01, kStation-02, kStation-03, kStation-04, kStation-05, kStation-06. Tradename or Brand(s) KOPI We also authorize Teleconformity (Mr. M. Koop, Manager Certification, Address: Rietven 31, 7534NH Enschede, the Netherlands) to apply and sign this application for certification, registration or filing on our behalf (as representative agent or certifier). Attestation: City and Country:Date:Name: (this must be a person) Function:Signature: (or official company stamp) Hong Kong, ChinaDec. 30,2014Samuel AuDirector
FCC ID Label Label Location Kopi Incorporation Limited Product name: kStation FCC ID: 2ABRB-KSTATION This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1)This device may not cause harmful interference, and (2)This device must accept any interference received, including interference that may cause undesired operation.
FCC RF Exposure EUT Description: kStation Model No.: kStation-01, kStation-02, kStation-03, kStation-04, kStation-05, kStation-06 All the model are the same circuit and RF module,except the appearance colour, this report only test mode name: kStation-01 FCC ID: 2ABRB-K STAT I ON 1. Applicable Standard According to §1.1307(b)(5), systems operating under the provisions of this section shall be operated in a manner that ensure that the public is not exposed to radio frequency energy level in excess of the Commission’s guideline. This is a Portable device. KDB 447498 D01 General RF Exposure Guidance v05 was used as the guidance. According to §1.1310 and §2.1093 RF exposure is calculated. 2. RF Exposure Calculation Result: WIFI: Frequency: 2412-2462 MHz Low-Channel: 2.412GHz (channel 01) Antenna Gain: G = 0 dBi According to the requirement of KDB 447498 D01 General RF Exposure Guidance v05 Appendix A SAR Test Exclusion Thresholds for 100 MHz – 6 GHz and ≤ 50 mm. The Max Peak Power measured and achieved in High-Channel: 2.412GHz (channel 01) mode is: 9.5dBm = 8.91mW < 10mW (Thresholds) and the exact distance from (the closest part of) the internal antenna to the outside surface of the tablet is greater than 5mm. The SAR measurement is not necessary. BT: Frequency: 2402-2480 MHz Middle-Channel: 2.440GHz (channel 20) Antenna Gain: G = 0 dBi According to the requirement of KDB 447498 D01 General RF Exposure Guidance v05 Appendix A SAR Test Exclusion Thresholds for 100 MHz – 6 GHz and ≤ 50 mm. The Max Peak Power measured and achieved in Middle-Channel: 2.440GHz (channel 20) mode is:-2.09dBm =0.0618mW < 10mW (Thresholds) and the exact distance from (the closest part of) the internal antenna to the outside surface of the tablet is greater than 5mm. The SAR measurement is not necessary.
Report No.: WST20141224006 FCC TEST REPORT For Kopi Incorporation Limited kStation Trade Name : KOPI Model No. : kStation-01, kStation-02, kStation-03, kStation-04, kStation-05, kStation-06. All the model are the same circuit and RF module,except the appearance colour, this report only test mode name: kStation-01 FCC ID : 2ABRB- KSTATION Frequency range : 2402-2480MHz Number of Channel : 40CH Type of antenna : Internal monopole Antenna Applicant : Kopi Incorporation Limited Unit 716, Vanta Ind.Ctr.,21-33 Tai Lin Pai Roda, Kwai Chung, N.T.,Hong Kong Regulation : FCC Rules and Regulations Part 15 Subpart C Section 15.247 Prepared by : WST Certification & Testing (HK) Limited Address : 12/F., San Toi Building,137-139 Connaught Road Central, Hong Kong, China Report No.: : WST20141224006 Test Date : Dec. 24-28, 2014 Date of Report : Dec. 28, 2014 WST Certification & Testing (HK) Limited Page 1 of 38 Report No.: WST20141224006 TABLE OF CONTENT Description Page Test Report Declaration 1. TEST PROCEDURES AND RESULTS ............................................................................... 4 2. GENERAL INFORMATION ................................................................................................ 5 1.1. General Information ............................................................................................................................ 5 1.2. Test Facility ........................................................................................................................................ 6 3. TEST INSTRUMENT USED ................................................................................................. 7 4. OPERATION OF EUT DURING TESTING ........................................................................... 8 5. 6DB BANDWIDTH MEASUREMENT ................................................................................ 10 5.1. Block Diagram of Test Setup ...................................................................................................... 10 5.2. Limits .......................................................................................................................................... 10 5.3. Test Procedure ............................................................................................................................. 10 5.4. Test Result ................................................................................................................................... 10 6. MAXIMUM PEAK OUTPUT POWER ................................................................................. 13 6.1. Block Diagram of Test Setup ...................................................................................................... 13 6.2. Limits .......................................................................................................................................... 13 6.3. Test Procedure ............................................................................................................................. 13 6.4. Test Result ................................................................................................................................... 13 7. POWER SPECTRAL DENSITY MEASUREMENT ............................................................ 16 7.1. Block Diagram of Test Setup ...................................................................................................... 16 7.2. Limits .......................................................................................................................................... 16 7.3. Test Procedure ............................................................................................................................. 16 7.4. Test Result ................................................................................................................................... 16 8. BAND EDGE COMPLIANCE TEST..................................................................................... 19 8.1. Block Diagram of Test Setup ...................................................................................................... 19 8.2. Limits .......................................................................................................................................... 19 8.3. Test Procedure ............................................................................................................................. 19 8.4. Test Result ................................................................................................................................. 20 9. RADIATED SPURIOUS EMISSION TEST .......................................................................... 24 9.1. Block Diagram of Test Setup ...................................................................................................... 24 9.2. Limits .......................................................................................................................................... 25 9.3. Restricted bands of operation ...................................................................................................... 25 9.4. Test Procedure ............................................................................................................................. 26 9.5. Test Result ................................................................................................................................... 27 10. CONDUCTED SPURIOUS EMISSION COMPLIANCE TEST ........................................... 30 10.1. Block Diagram of Test Setup ...................................................................................................... 30 10.2. Limits .......................................................................................................................................... 30 10.3. Test Procedure ............................................................................................................................. 30 10.4. Test Result…
Text truncated - open the document above for the full version.
Report No.: WST20141224007 F CC TEST REPORT For K opi Incorporation Limited k Station Trade Name : KOPI Model No. : kStation-01, kStation-02, kStation-03, kStation-04, kStation-05, kStation-06. All the model are the same circuit and RF module,except the appearance colour, this report only test mode name: kStation-01 FCC ID : 2ABRB-KSTATION Frequency range : 802.11b/g/n(20MHz): 2412-2462MHZ 802.11n(40MHz): 2422-2452MHZ Number of Channel : 802.11b/g/n(20MHz): 11CH 802.11n(40MHz): 7CH Type of antenna : Internal monopole Antenna Applicant : Kopi Incorporation Limited Unit 716, Vanta Ind.Ctr.,21-33 Tai Lin Pai Roda, Kwai Chung, N.T.,Hong Kong Regulation : FCC Rules and Regulations Part 15 Subpart C Section 15.247 Prepared by : WST Certification & Testing (HK) Limited Address : 12/F., San Toi Building,137-139 Connaught Road Central, Hong Kong, China Report No.: : WST20141224007 Test Date : Dec. 24-28, 2014 Date of Report : Dec. 28, 2014 W ST Certification & Testing (HK) Limited Page 1 of 73 Report No.: WST20141224007 TABLE OF CONTENT Description Page Test Report Declaration 1. TEST PROCEDURES AND RESULTS ............................................................................... 4 2. GENERAL INFORMATION ................................................................................................ 5 1.1. General Information ............................................................................................................................ 5 1.2. Test Facility ........................................................................................................................................ 6 3. TEST INSTRUMENT USED ................................................................................................. 7 4. OPERATION OF EUT DURING TESTING ........................................................................... 8 5. 6DB BANDWIDTH MEASUREMENT ................................................................................ 10 5.1. Block Diagram of Test Setup ...................................................................................................... 10 5.2. Limits .......................................................................................................................................... 10 5.3. Test Procedure ............................................................................................................................. 10 5.4. Test Result ................................................................................................................................... 10 6. MAXIMUM PEAK OUTPUT POWER ................................................................................. 18 6.1. Block Diagram of Test Setup ...................................................................................................... 18 6.2. Limits .......................................................................................................................................... 18 6.3. Test Procedure ............................................................................................................................. 18 6.4. Test Result ................................................................................................................................... 18 7. POWER SPECTRAL DENSITY MEASUREMENT ............................................................ 25 7.1. Block Diagram of Test Setup ...................................................................................................... 25 7.2. Limits .......................................................................................................................................... 25 7.3. Test Procedure ............................................................................................................................. 25 7.4. Test Result ................................................................................................................................... 25 8. BAND EDGE COMPLIANCE TEST..................................................................................... 33 8.1. Block Diagram of Test Setup ...................................................................................................... 33 8.2. Limits .......................................................................................................................................... 33 8.3. Test Procedure ............................................................................................................................. 33 8.4. Test Result ................................................................................................................................. 34 9. RADIATED SPURIOUS EMISSION TEST .......................................................................... 47 9.1. Block Diagram of Test Setup ...................................................................................................... 47 9.2. Limits .......................................................................................................................................... 48 9.3. Restricted bands of operation ...................................................................................................... 48 9.4. Test Procedure ............................................................................................................................. 49 9.5. Test Result ................................................................................................................................... 50 10. CONDUCTED SPURIOUS EMISSION COMPLIANCE TEST ........................................... 62 10.1. Block Diagram of Test Setup ...................................................................................................... 62 10.2. Limits .......................................................................................................................................... 62 10.3. Test Procedure ......................................................…
Text truncated - open the document above for the full version.
1. PHOTOGRAPH OF TEST Radiated Emission AC power line conducted emission
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 2 | 15C | 2.41 GHz - 2.46 GHz | 8.90 mW |
kBeacon
Equipment Class
DTS - Digital Transmission System
Kopi 96W Bluetooth LE Indicator Board
Equipment Class
DTS - Digital Transmission System