
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
SETUP HARDWARE A: Slide removal tool onto Nokē ONE so the edge of tool and left edge of Nokē ONE connect Removal Tool Remove Battery Holder Nokē ONE B: While tightly holding removal tool in place, use opposite hand to firmly push in battery holder to release it C: Insert battery into battery holder. Be sure positive end is on the right Battery Holder *Use only battery supplied with Nokē One. Do not attempt to use other batteries as they will not have the necessary voltage, current, and capacity required for optimal performance D: With battery in holder, insert the battery holder back into the device. Press firmly on top and bottom to engage both hooks TESTING HARDWARE *Be sure Nokē ONE is functioning correctly before installing on door A: Before being added to the site and receiving electronic keys, you can unlock Nokē ONE by touching the plastic window on the front of the device three times. The light will turn blue when touch is accepted INSTALLATION Unlock and Lock Nokē ONE B: After touching three times, the light will turn green to indicate that the Nokē ONE device is now ready for unlocking C: Slide the hasp left to the open position and right to lock. The light will turn red to confirm device is locked Unlocked PositionLocked Position *Remove the existing Hasp from the door before installing Nokē ONE Device ADDING Nokē ONE TO SITE SUPPORT A: Confirm the four existing holes line up with bolts on Nokē ONE. *Drill new holes if needed B: If door does not have a middle hole for cam lock, an additional hole will need to be drilled to accommodate the plastic back window for the motion sensor C: Remove backing from adhesive mounting tape on back side of Nokē ONE D: Push Nokē ONE firmly onto door E: Open door and go inside unit and then pull door back down. You are now inside unit and can see the back of the device F: While looking at four bolts, pull firmly on each of them to extend them through door G: Place mounting plate over holes. Be sure to orient the plate so center hole is closer to the bottom H: Add the four nuts to ends of bolts and tighten A: Use the Nokē Smart-Entry App to scan QR code on the device and add device to the Smart-Entry system B: Using web portal, be sure electronic keys are sent to Nokē ONE via gateways C: Use the app to unlock the device after it has been synced to the system. The QR sticker can now we removed UNLOCK If you need support, please call 1(833) 257-0240 *See back side of guide for instructions on how to use the included alignment template USING THE ALIGNMENT TEMPLATE Nokē Inc. here with declares that this unit complies with the fundamental requirements and relevant regulations set forth by Guideline 1999/5/EU. The declaration of conformity can be found at noke.com/ce or requested by e-mail: [email protected] ©2020-21 Nokē Nokē ONE FCC ID: 2AFRJ-1A FCC Compliance Statement QUICK START GUIDE A: Fold both flaps back along dotted line B: Align the right edge of template to the edge of the door panel. For vertical alignment, insert folded flaps into groove in the door corrugation Right Edge of Door Panel Template Flap C: Use a marker to mark positioning for holes and then drill holes Fold down Template Front Template Back
SCS-F18:ProjectandProductCertificationRepresentativeAuthorizationLetterPage1of2Rev6.0 775MontagueExpressway Milpitas,CA95035 Tel:408-526-1188 Fax:408-526-1088 Email: [email protected] ProjectandProduct Certification Representative AuthorizationLetter ReasonforAmendment(current/obsolete) RevisionHistory ApprovedDate FromTo InitialRelease(obsolete)1.01.0Nov-14-2006 Revisedwording(obsolete)1.02.0Sept–25-2007 Updatedcompanytemplate(obsolete)2.03.0Jan-31-2012 Updatedletterinformation(obsolete)3.04.0May-23-2014 AddedFCCIDfield(obsolete)4.05.0Sep-16-2014 Updatedcompanyname&logo(current)5.06.0Jun-27-2018 SCS-F18:ProjectandProductCertificationRepresentativeAuthorizationLetterPage2of2Rev6.0 NokeInc (2020-07-05) To:BVCPS,INC. 775MontagueExpressway, Milpitas,CA95035 USA DearSir/Madam, Re:ProductCertificationRepresentativeAuthorizationLetter We,_____ NokeInc ___herebyauthorizeBVCPS,Inc.toactasaCertification Bodyforcertifyingforthefollowingproject(s): Product:NokeOne M/N:1A FCCID:2AFRJ-1A Sincerely, DavidGengler CEO NokeInc 2000AshtonBlvd,Ste375Lehi,UT84043,USA
SCS-F19:ConfidentialityRequestLetterPage 1 of 2 Rev6.0 775MontagueExpressway Milpitas,CA95035 Tel:408-526-1188 Fax:408-526-1088 Email: [email protected] m Confidentiality RequestLetter ReasonforAmendment(current/obsolete) RevisionHistory ApprovedDate FromTo InitialRelease(obsolete)1.01.0Nov-14-2006 AddingCFR2.459(obsolete)1.02.0August–11-2008 Updatedcompanytemplate&Addedtext box(obsolete) 2.03.0Jan-31-2012 AddedICconfidentialityletterform (obsolete) 3.04.0March-26-2015 CorrectionstoSTCform.Addedreference toKDB(obsolete) 4.05.0Nov-19-2015 Updatedcompanylogo(current)5.06.0Jun-26-2019 SCS-F19:ConfidentialityRequestLetterPage 2 of 2 Rev6.0 NokeInc (2020-07-05) To: FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,MD Subject:PermanentConfidentialityRequestforFCCID:2AFRJ-1A Pursuanttosections0.457and0.459ofCFR47,werespectfullyrequestpermanent confidentialtreatmentofthefollowingExhibitsaccompanyingthisapplicationas: -BlockDiagram -Schematics -OperationalDescription Theabovematerialscontaintradesecretsandproprietaryinformationnotcustomarily releasedtothepublic.Thepublicdisclosureofthesematerialsmaybeharmfultothe applicantandprovideunjustifiedbenefitstoitscompetitors. Theapplicantunderstandsthatdisclosureofthisapplicationandallaccompanying documentationwillnotbemadebeforethedateoftheGrantforthisapplication. Sincerely, DavidGengler CEO NokeInc 2000AshtonBlvd,Ste375Lehi,UT84043,USA
Label: NOKEONE Model:1A FCCID:2AFRJ-1A Input:Battery3.6VMadeinchina ThisdevicecomplieswithPart15oftheFCCRules. Operationissubjecttothefollowingtwoconditions: (1)Thisdevicemaynotcauseharmfulinterference. (2)Thisdevicemustacceptanyinterferencereceived, includinginterferencethatmaycauseundesiredoperation. LabelLocation:
BT ANT 2.4G ANT
RFEXPOSUREEVALUATION EUTSpecification EUTNokeOne ModelNumber1A FCCID2AFRJ-1A Antennagain(Max)3dBiforBTand2.4G OperationFrequency2402-2480MHzforBTand2.4G InputRatingBattery3.6V Modulation2GFSKforBTand2.4G Max.outputpower0.09dBm(0.0010W)forBT TestRequirement: AccordingtoFCC1.1310:Thecriterialistedinthefollowingtableshallbeusedto evaluatetheenvironmentimpactofhumanexposuretoradiofrequency(RF) Radiationasspecifiedin§1.1307(b) LimitsforMaximumPermissibleExposure(MPE) Frequency Range(MHz) ElectricField Strength(V/m) Magnetic Field Strength(A/m) Power Density(mW/cm 2 ) Average Time (A)LimitsforOccupational/ControlExposures 300-1500----F/3006 1500-100000----56 (B)LimitsforGeneralPopulation/UncontrolExposures 300-1500----F/15006 1500-100000----130 11.1Friistransmissionformula:Pd=(Pout*G)\(4*pi*R 2 ) Where Pd=PowerdensityinmW/cm 2 Pout=outputpowertoantennainmW G=Numericgainoftheantennarelativetoisotropicantenna Pi=3.1416 R=distancebetweenobservationpointandcenteroftheradiatorincm PdthelimitofMPE,1mW/cm 2 .Ifweknowthemaximumgainofthendtotal powerinputtotheantenna,throughthecalculation,wewillknowthedistance wheretheMPElimitisreached. 11.2MeasurementResult Antennagain:3dBi BLE: Mode Channe lFreq. (MHz) Measu red power (dBm) Tune- up power (dBm) Max tune-up power (dBm) Antenn a Gain Numeri c Evaluation result (mW/cm2) Power density Limits (mW/c m2) GFSK24020.090±111.9950.00051 GFSK2440-0.530±111.995 0.0005 1 GFSK2480-0.020±111.9950.00051 Signature: AlanHe Date:2020-07-05
ReportNo.:EA2004425F010011of49 DongGuanAnciElectronicTechnologyCo.,Ltd 1-2Floor,BuildingA,No.11,Headquarters2Road,SongshanLakeHi-techIndustrialDevelopmentZone, DongguanCity,GuangdongPr.,China. Phone:86-769-85075888;Fax:86-769-85075898E-mail:[email protected] ELECTROMAGNETICEMISSIONSCOMPLIANCEREPORT FCCPART15SUBPARTCREQUIREMENT OF NokeOne ModelNo.:1A Trademark: FCCID:2AFRJ-1A ReportNo.:EA2004425F01001 IssueDate:May26,2020 Preparedfor NokeInc 2000AshtonBlvd,Ste375Lehi,UT84043,USA Preparedby DongGuanAnciElectronicTechnologyCo.,Ltd. 1-2Floor,BuildingA,No.11,Headquarters2Road,Songshan,LakeHi-tech IndustrialDevelopmentZone,DongguanCity,evelopmentZone, DongguanCity,GuangdongPr.,China. Thisreportshallnotbereproduced,exceptinfull,withoutthewrittenapprovalof DongGuanAnciElectronicTechnologyCo.,Ltd. ReportNo.:EA2004425F01001 2 of 49 TRFNo.:FCC15.247/ARev.1.0 VERIFICATIONOFCOMPLIANCE Applicant: NokeInc 2000AshtonBlvd,Ste375Lehi,UT84043,USA Manufacturer: NokeInc 2000AshtonBlvd,Ste375Lehi,UT84043,USA ProductDescription:NokeOne TradeMark: ModelNumber:1A Weherebycertifythat: TheaboveequipmentwastestedbyDongGuanAnciElectronicTechnologyCo., Ltd.Thetestdata,dataevaluation,testprocedures,andequipmentconfigurations showninthisreportweremadeinaccordancewiththeproceduresgiveninANSI C63.10-2013andtheenergyemittedbythesampleEUTtestedasdescribedinthis reportisincompliancewithconductedandradiatedemissionlimitsofFCCRulesPart 15.247(2019). DateofTest:May19,2020toMay27,2020 Preparedby: TomasYang/Supervisor Reviewer&Approved: AlanHe/Manage ReportNo.:EA2004425F01001 3 of 49 TRFNo.:FCC15.247/ARev.1.0 ModifiedInformation VersionSummaryRevisionDateReportNo. Ver.1.0OriginalReport/EA2004425F01001 ReportNo.:EA2004425F01001 4 of 49 TRFNo.:FCC15.247/ARev.1.0 TableofContents 1.GENERALINFORMATION.............................................................................................................6 1.1PRODUCTDESCRIPTION..............................................................................................................................6 1.2TESTMETHODOLOGY .................................................................................................................................. 6 2.TESTFACILITY................................................................................................................................7 3.DESCRIPTIONOFTESTMODES.................................................................................................8 4.SUMMARYOFTESTRESULTS.................................................................................................10 6DBBANDWIDTHMEASUREMENT..............................................................................................10 5.TESTSYSTEMUNCERTAINTY..................................................................................................11 6.CONDUCTEDEMISSIONSTEST................................................................................................12 6.1MEASUREMENTPROCEDURE: .................................................................................................................... 12 6.2TESTSET-UP(BLOCKDIAGRAMOFCONFIGURATION)...........................................................................12 6.3MEASUREMENTEQUIPMENTUSED: ........................................................................................................... 12 6.4CONDUCTEDEMISSIONLIMIT .................................................................................................................... 12 6.5MEASUREMENTRESULT:...........................................................................................................................13 7.RADIATEDEMISSIONTEST........................................................................................................14 7.1MEASUREMENTPROCEDURE ..................................................................................................................... 14 7.2TESTSET-UP(BLOCKDIAGRAMOFCONFIGURATION) ........................................................................... 16 7.3MEASUREMENTEQUIPMENTUSED:...........................................................................................................17 7.4RADIATEDEMISSIONLIMIT ......................................................................................................................... 18 7.5MEASUREMENTRESULT .......................................................................................................................... 19 7.6RADIATEDMEASUREMENTPHOTOS:.........................................................................................................25 8.6DBBANDWIDTHMEASUREMENT..........................................................................................26 8.1MEASUREMENTPROCEDURE ..................................................................................................................... 26 8.2TESTSET-UP(BLOCKDIAGRAMOFCONFIGURATION) ........................................................................... 26 8.3MEASUREMENTEQUIPMENTUSED:..........................................................................................................26 8.4LIMIT ........................................................................................................................................................... 26 8.5MEASUREMENTRESULTS: .......................................................................................................................... 26 9.MAXIMUMPEAKOUTPUTPOWERTEST...............................................................................29 9.1MEASUREMENTPROCEDURE.....................................................................................................................29 9.2TESTSET-UP(BLOCKDIAGRAMOFCONFIGURATION) ........................................................................... 29 9.3MEASUREMENTEQUIPMENTUSED: .......................................................................................................... 29 9.4PEAKPOWEROUTPUTLIMIT..…
Text truncated - open the document above for the full version.
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 1.00 mW |

NokeScreen
Equipment Class
DTS - Digital Transmission System
Noke Gatewa
Equipment Class
DSS - Part 15 Spread Spectrum Transmitter
Noke Key Fob
Equipment Class
DTS - Digital Transmission System