FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Shenzhen Mossloo Industrial Co.,Ltd/
  3. 2AN8FMSL-M6020Q

2AN8FMSL-M6020QBamboo Fast Wirelsss Charging Dock Station

Shenzhen Mossloo Industrial Co.,Ltd
Bamboo Fast Wirelsss Charging Dock Station - FCC ID 2AN8FMSL-M6020Q - Shenzhen Mossloo Industrial Co.,Ltd
Click to zoom

Application Details

Equipment Class
DCD - Part 15 Low Power Transmitter Below 1705 kHz
Date of Grant
Jan 28, 2021
Application Purpose
Original Equipment
Date of Application
Jan 28, 2021
Equipment Note
Bamboo Fast Wirelsss Charging Dock Station
Frequency Range
0.11200000 - 0.22000000
Company
Shenzhen Mossloo Industrial Co.,Ltd
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

Test Report

↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

Bamboo Fast Wireless Charging Dock Station Instruction Manual MSL-M6020Q 1 x Wirelsss Charging Dock Station 1 x UL Listed AC adapter 1 x Instruction Manual AC Adapter input: 12V/2A USBA Output 1/2/3: Total 5V/2.4A (Max) Wireless Output: 5W/7.5W/10W Wireless Charging Mobile phones and other electronic devices: Connect the provided UL Listed AC adapter cable to the DC input port(3) of the charging station, then connect the AC adapter to a power source. LED indicator will glow GREEN when the device is in wireless charging standby. Place the wireless charging supported mobile device on the wireless charging surface(1), LED will glow RED when device is charging. Once fully charged remove the device. 1. • • • Note: When wireless charging, if the LED a wireless charging device or there is an object between the device and charging surface interfering with the charging. process. ** Charging mobile phones and other electronic devices: Connect the charging cable to your mobile phone/device using the appropriate connector. Connect the USB part of the cable into the USB-A Output(2). USB-A 1: 5V/1A; USB-A 2: 5V/1A ; USB-A 3: 5V/2.4A. Remove the cable from your mobile device when it is fully charged. 2. • • • Smart Watch Charging Cable Stand: Take the USB end of the watch charging cable(NOT INCLUDED) and run it through the front of the watch charging stand(4). Plug the watch charging cable into the 3. • • 1. 2. 3. 4. 5. 6. 7. 8. 9. • • • Wireless Charging Output Surface USB-A Outputs DC Input Port Watch Charging Stand Pad/Phone Holder Earbuds Charging Case Stand Accessories Holder LED Indicator AC Adapter What’s included: Functions: Instructions: This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: This device may not cause harmful interference, and This device must accept any interference received, including interference that may cause undesired operation. Warning: approved by the party responsible for compliance could void the user’s authority to operate the equipment. (1) (2) * FCC Statement: MADE IN CHINA WARNING-When using this product, basic precautions should always be followed: Read all the instructions before use. Never store or use this product in temperatures below 32°F(0°C) or above 115°F(45°C). Do not overcharge your phone. The unit may become hot under excessive use. Remove your phone once it is fully charged. Never charge your phone for more than 7 hours at a time. To reduce the risk of injury, close supervision is required when the product is used near children. Do not expose the device to moisture. Do not use the device in excess of its output rating. Overload outputs above the Do not use the device if damaged or Do not disassemble the device. For professional. incorrect reassembly may or temperatures above 104°F may cause explosion. use only identical replacement parts to ensure product safety. Attachments on the back of your phone can impede the effectiveness of the wireless charger, and lead to overheating. Please remove any attachments from the phone before charging on this device, attachments can interfer with wireless charging and lead to over heating. USB-A 1 Output(2) of the station. Take the charging end of the cable and place it in the designated cut out on the stand, if placed correctly charging surface stand. Place your watch on the stand to begin charging, remove once fully charged. True Wireless Earbuds Charging Stand: Plug the USB end of the charging cable (NOT INCLUDED) to the USB-A 1 Output(2) and pull the other side of the cable through the hole of the earbud charging case stand(6). Connect your earbuds charging case with the tip to begin charging, remove once fully charged. • 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. • • 4. • • • SAFETY PRECAUTIONS: 8 9 This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This equipment should be installed and operated with minimum distance 20cm between the radiator & your body.

Cover Letter(s)

ShenZhen Mossloo Industrial Co.,Ltd 2021.01.27 Eurofins MET Labs 914 West Patapsco Avenue Baltimore, MD 21230 RE: CONFIDENTIALITY REQUEST FOR Product Name: Bamboo Fast Wirelsss Charging Dock Station Trademark: N/A Model Number(s): MSL-M6020Q, 7143-22NT FCC ID: 2AN8FMSL-M6020Q To Whom It May Concern: This letter serves as an official request for confidentiality under sections 0.457 and 0.459 of CFR 47. We have requested that the - Block Diagram - Schematics - Operational Description required to be submitted with this application be permanently withheld from public review. The above materials contain trade secrets and proprietary information not customarily released to the public. The public disclosure of these materials may be harmful to the applicant and provide unjustified benefits to its competitors. Please contact me if there is any information you may need. Sincerely, Client’s signature: Client’s name / title : Orders Cheng /Manager Contact information / address: Road One No.4, Science Industrial Park, Shangxue Village, Bantian Street, Longgang District, Shenzhen, China

Cover Letter(s)

ShenZhen Mossloo Industrial Co.,Ltd 2021.01.27 Eurofins MET Labs 914 West Patapsco Avenue Baltimore, MD 21230 RE: LETTER OF AGENT AUTHORIZATION To Whom It May Concern: We, the undersigned, hereby authorize Shenzhen BCTC Testing Co., Ltd to act on our behalf in all matters relating to application for equipment authorization, including the signing of all documents relating to these matters. We also hereby certify that no party to the application authorized hereunder is subject to the denial of benefits, including FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C.853(a). This agreement expires one year from the current date. Sincerely, Client’s signature: Client’s name / title : Orders Cheng /Manager Contact information / address: Road One No.4, Science Industrial Park, Shangxue Village, Bantian Street, Longgang District, Shenzhen, China

External Photos

External Photos

ID Label/Location Info

Size:30*15mm FCC ID: 2AN8FMSL-M6020Q This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions:(1)This device may not cause harmful interfer ence, and (2) this device must accept any interference received, including interference that may cause undesired operation. Label Location

Internal Photos

Internal Photos Antenna

Test Report

No.:BCTC/RF-EMC-005 Page 1 of 14 Edition:A.3 TEST REPORT Shenzhen BCTC Testing Co., Ltd. Report No.: BCTC2012285787E-1E Applicant: ShenZhen Mossloo Industrial Co.,Ltd Product Name: Bamboo Fast Wirelsss Charging Dock Station Model/Type Ref.: MSL-M6020Q Tested Date: 2020-12-15 to 2021-01-25 Issued Date: 2021-01-26 Report No.: BCTC2012285787E-1E No.:BCTC/RF-EMC-005 Page 2 of 14 Edition:A.3 FCC ID: 2AN8FMSL-M6020Q The test report is effective only with both signature and specialized stamp.This result(s) shown in this report refer only to the sample(s) tested. Without written approval of Shenzhen BCTC Testing Co., Ltd, this report can’t be reproduced except in full.The tested sample(s) and the sample information are provided by the client. Product Name: Bamboo Fast Wirelsss Charging Dock Station Trademark: N/A Model/Type Ref.: MSL-M6020Q 7143-22NT Prepared For: ShenZhen Mossloo Industrial Co.,Ltd Address: Road One No.4, Science Industrial Park, Shangxue Village, Bantian Street, Longgang District, Shenzhen, China Manufacturer: ShenZhen Mossloo Industrial Co.,Ltd Address: Road One No.4, Science Industrial Park, Shangxue Village, Bantian Street, Longgang District, Shenzhen, China Prepared By: Shenzhen BCTC Testing Co., Ltd. Address: 1-2/F., Building B, Pengzhou Industrial Park, No.158, Fuyuan 1st Road, Tangwei, Fuhai Subdistrict, Bao'an District, Shenzhen, Guangdong, China Sample Received Date: 2020-12-15 Sample tested Date: 2020-12-15 to 2021-01-25 Issue Date: 2021-01-26 Report No.: BCTC2012285787E-1E Test Standards FCC CFR 47 part1, 1.1307(b), 1.1310 Test Results PASS Tested by: Approved by: Eric Yang/Project Handler Zero Zhou/Reviewer Report No.: BCTC2012285787E-1E No.:BCTC/RF-EMC-005 Page 3 of 14 Edition:A.3 TABLE OF CONTENT Test Report Declaration Page 1. VERSION ............................................................ 4 2. PRODUCT INFORMATION ............................................. 5 2.1 Product Information ..................................................... 5 2.2 Support Equipment ..................................................... 5 2.3 Test Mode ............................................................. 5 3. TEST FACILITY AND TEST INSTRUMENT USED ......................... 6 3.1 Test Facility ............................................................ 6 3.2 Test Instrument Used ................................................... 6 4. METHOD OF MEASUREMENT ......................................... 7 4.1 Applicable Standard..................................................... 7 4.2 Block Diagram Of Test Setup ............................................. 7 4.3 Limit .................................................................. 8 4.4 Test procedure ......................................................... 8 4.5 Equipment Approval Considerations....................................... 9 4.6 E and H field Strength .................................................. 10 5. PHOTOGRAPHS OF TEST SET-UP .................................... 11 (Note: N/A means not applicable) Report No.: BCTC2012285787E-1E No.:BCTC/RF-EMC-005 Page 4 of 14 Edition:A.3 1. VERSION Report No. Issue Date Description Approved BCTC2012285787E-1E 2021-01-26 Original Valid Report No.: BCTC2012285787E-1E No.:BCTC/RF-EMC-005 Page 5 of 14 Edition:A.3 2. PRODUCT INFORMATION 2.1 Product Information Model/Type Ref.: MSL-M6020Q 7143-22NT Model differences: All the model are the same circuit and RF module, except model names. Product Description: Bamboo Fast Wirelsss Charging Dock Station Operation Frequency: 120kHz-220kHz Antenna installation: loop coil antenna Ratings: Input: DC 12V/2A USB output 1/2/3: 5V/2.4A(Max) Wireless Output: 5W/7.5W/10W Adapter: Model No.: LX120200 Input: AC 100-240V 50/60Hz Output: DC 12V 2A 2.2 Support Equipment Device Type Brand Model Series No. Data Cable Remark Mobile phone iphone iphone8P N/A N/A Auxiliary Notes: 1. All the equipment/cables were placed in the worst-case configuration to maximize the emission during the test. 2. Grounding was established in accordance with the manufacturer’s requirements and conditions for the intended use. 2.3 Test Mode Test Modes keeping TX+Charging mode Report No.: BCTC2012285787E-1E No.:BCTC/RF-EMC-005 Page 6 of 14 Edition:A.3 3. TEST FACILITY AND TEST INSTRUMENT USED 3.1 Test Facility All measurement facilities used to collect the measurement data are located at Shenzhen BCTC Testing Co., Ltd. Address:1-2/F., Building B, Pengzhou Industrial Park, No.158, Fuyuan 1st Road, Tangwei, Fuhai Subdistrict, Bao'an District, Shenzhen, Guangdong, China. The site and apparatus are constructed in conformance with the requirements of ANSI C63.4 and CISPR 16-1-1 other equivalent standards. FCC Test Firm Registration Number: 712850 IC Registered No.: 23583 3.2 Test Instrument Used Equipment Manufacturer Model No. Serial No. Last Cal. Next Cal. Exposure Level Tester Narda ELT-400 N-0231 Jul. 15, 2020 Jul. 14, 2021 Magnetic field probe 100cm2 Narda B-Field Probe 100cm2 M0675 Jul. 15, 2020 Jul. 14, 2021 843 Chamber ETS 843 84301 Aug. 27, 2020 Aug. 26, 2023 Report No.: BCTC2012285787E-1E No.:BCTC/RF-EMC-005 Page 7 of 14 Edition:A.3 4. METHOD OF MEASUREMENT 4.1 Applicable Standard According to §1.1307(b)(1), systems operating under the provisions of this section shall be operated in a manner that ensures that the public is not exposed to radio frequency energy level in excess of the Commission’s guidelines. According to §1.1310 and §2.1093 RF exposure is calculated. According KDB680106 D01v03: RF Exposure Wireless Charging Apps v02. 4.2 Block Diagram Of Test Setup Note: Measurements should be made from all sides and the top of the primary/client pair, with the 15 cm measured from the center of the probe(s) to the edge of the device Report No.: BCTC2012285787E-1E No.:BCTC/RF-EMC-005 Page 8 of 14 Edition:A.3 4.3 Limit 4.4 Test procedure a) The RF exposure test was performed on 360 degree turn table in anechoic chamber. b) The measurement probe was placed at test di…

Text truncated - open the document above for the full version.

Test Report

No.:BCTC/RF-EMC-005 Page 1 of 25 Edition:A.3 TEST REPORT Shenzhen BCTC Testing Co., Ltd. Report No.: BCTC2012285787E-2E Applicant: ShenZhen Mossloo Industrial Co.,Ltd Product Name: Bamboo Fast Wirelsss Charging Dock Station Model/Type Ref.: MSL-M6020Q Tested Date: 2020-12-15 to 2021-01-25 Issued Date: 2021-01-26 Report No.: BCTC2012285787E-2E No.:BCTC/RF-EMC-005 Page 2 of 25 Edition:A.3 FCC ID: 2AN8FMSL-M6020Q The test report is effective only with both signature and specialized stamp.This result(s) shown in this report refer only to the sample(s) tested. Without written approval of Shenzhen BCTC Testing Co., Ltd, this report can’t be reproduced except in full.The tested sample(s) and the sample information are provided by the client. Product Name: Bamboo Fast Wirelsss Charging Dock Station Trademark: N/A Model/Type Ref.: MSL-M6020Q 7143-22NT Prepared For: ShenZhen Mossloo Industrial Co.,Ltd Address: Road One No.4, Science Industrial Park, Shangxue Village, Bantian Street, Longgang District, Shenzhen, China Manufacturer: ShenZhen Mossloo Industrial Co.,Ltd Address: Road One No.4, Science Industrial Park, Shangxue Village, Bantian Street, Longgang District, Shenzhen, China Prepared By: Shenzhen BCTC Testing Co., Ltd. Address: 1-2/F., Building B, Pengzhou Industrial Park, No.158, Fuyuan 1st Road, Tangwei, Fuhai Subdistrict, Bao'an District, Shenzhen, Guangdong, China Sample Received Date: 2020-12-15 Sample tested Date: 2020-12-15 to 2021-01-25 Issue Date: 2021-01-26 Report No.: BCTC2012285787E-2E Test Standards FCC Part15.209 ANSI C63.10-2013 Test Results PASS Tested by: Approved by: Eric Yang/Project Handler Zero Zhou/Reviewer Report No.: BCTC2012285787E-2E No.:BCTC/RF-EMC-005 Page 3 of 25 Edition:A.3 TABLE OF CONTENT Test Report Declaration Page 1. VERSION ............................................................ 4 2. TEST SUMMARY ..................................................... 5 3. MEASUREMENT UNCERTAINTY ....................................... 6 4. PRODUCT INFORMATION AND TEST SETUP............................ 7 4.1 Product Information ..................................................... 7 4.2 Test Setup Configuration ................................................ 7 4.3 Support Equipment ..................................................... 7 4.5 Test Mode ............................................................. 8 5. TEST FACILITY AND TEST INSTRUMENT USED ......................... 9 5.1 Test Facility ............................................................ 9 5.2 Test Instrument Used ................................................... 9 6. CONDUCTED EMISSIONS ............................................ 11 6.1 Block Diagram Of Test Setup ............................................ 11 6.2 Limit ................................................................. 11 6.3 Test procedure ........................................................ 11 6.4 EUT operating Conditions ............................................... 11 6.5 Test Result ........................................................... 12 7. RADIATED EMISSIONS .............................................. 14 7.1 Block Diagram Of Test Setup ............................................ 14 7.2 Limit ................................................................. 15 7.3 Test procedure ........................................................ 15 7.4 Test Result ........................................................... 17 8. BANDWIDTH TEST .................................................. 20 9. ANTENNA REQUIREMENTS .......................................... 21 10. EUT PHOTOGRAPHS ................................................ 22 11. EUT TEST SETUP PHOTOGRAPHS .................................... 23 (Note: N/A means not applicable) Report No.: BCTC2012285787E-2E No.:BCTC/RF-EMC-005 Page 4 of 25 Edition:A.3 1. VERSION Report No. Issue Date Description Approved BCTC2012285787E-2E 2021-01-26 Original Valid Report No.: BCTC2012285787E-2E No.:BCTC/RF-EMC-005 Page 5 of 25 Edition:A.3 2. TEST SUMMARY The Product has been tested according to the following specifications: No. Test Parameter Clause No Results 1 Conducted Emission 15.207 PASS 2 Radiated Emission 15.209 PASS 3 20dB Bandwidth 15.215 PASS 4 Antenna Requirement 15.203 PASS Report No.: BCTC2012285787E-2E No.:BCTC/RF-EMC-005 Page 6 of 25 Edition:A.3 3. MEASUREMENT UNCERTAINTY Where relevant, the following measurement uncertainty levels have been estimated for tests performed on the Product as specified in CISPR 16-4-2. This uncertainty represents an expanded uncertainty expressed at approximately the 95% confidence level using a coverage factor of k=2. No. Item Uncertainty 1 3m camber Radiated spurious emission(9kHz-30MHz) U=3.7dB 2 3m camber Radiated spurious emission(30MHz-1GHz) U=4.3dB 3 3m chamber Radiated spurious emission(1GHz-18GHz) U=4.5dB 4 Conducted Emission (150kHz-30MHz) U=3.2dB 5 humidity uncertainty U=5.3% 6 Temperature uncertainty U=0.59°C 7 Bandwidth 0.9% Report No.: BCTC2012285787E-2E No.:BCTC/RF-EMC-005 Page 7 of 25 Edition:A.3 4. PRODUCT INFORMATION AND TEST SETUP 4.1 Product Information Model/Type Ref.: MSL-M6020Q 7143-22NT Model differences: All the model are the same circuit and RF module, except model names. Product Description: Bamboo Fast Wirelsss Charging Dock Station Operation Frequency: 120kHz-220kHz Antenna installation: loop coil antenna Ratings: Input: DC 12V/2A USB output 1/2/3: 5V/2.4A(Max) Wireless Output: 5W/7.5W/10W Adapter: Model No.: LX120200 Input: AC 100-240V 50/60Hz Output: DC 12V 2A 4.2 Test Setup Configuration See test photographs attached in EUT TEST SETUP PHOTOGRAPHS for the actual connections between Product and support equipment. Conducted Emission/Radiated Spurious Emission: 4.3 Support Equipment No. Device Type Brand Model Series No. Data Cable Remark E-1 MSL-M6020 Q N/A MSL-M602 0Q N/A N/A EUT E-2 Dummy load N/A DL01 N/A N/A Auxiliary E-3 Adapter N/A LX120200 N/A N/A Auxiliary E-2 Dummy Load E-1 EUT C1 E-3 Ada…

Text truncated - open the document above for the full version.

Test Setup Photos

Conducted emissions Radiated Measurement Photos

Contact Information

Applicant

Orders Cheng
[email protected]0755-89501773Fax: 0755-89500085

Technical Contact

Shenzhen BCTC Testing Co., Ltd.Alan Mei
[email protected]86-755-36882589

1-2/F., Bldg B, Pengzhou Industrial Park, · Baoan District, Shenzhen, Guangdong · China

Test Firm

Shenzhen BCTC Testing Co., Ltd.Sally He
[email protected]15999690624

Technical Specifications

#Rule PartsFrequency RangePower Output
115C0.112 MHz - 0.22 MHz-
Confidentiality
Long Term
Grant Notes
The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter device.

Other Applications from Shenzhen Mossloo Industrial Co.,Ltd

TWS Earbuds - FCC ID 2AN8F573-M3012 - Shenzhen Mossloo Industrial Co.,Ltd
2AN8F573-M3012

TWS Earbuds

Sep 26, 2022

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
Wireless charging Bluetooth speaker with RGB - FCC ID 2AN8F966-M6064Q - Shenzhen Mossloo Industrial Co.,Ltd
2AN8F966-M6064Q

Wireless charging Bluetooth speaker with RGB

Jul 13, 2022

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
Bluetooth speaker with RGB - FCC ID 2AN8FMSL-M9012 - Shenzhen Mossloo Industrial Co.,Ltd
2AN8FMSL-M9012

Bluetooth speaker with RGB

Jun 19, 2022

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
Fast Wireless Charger - FCC ID 2AN8FM1029-A - Shenzhen Mossloo Industrial Co.,Ltd
2AN8FM1029-A

Fast Wireless Charger

Apr 13, 2022

Equipment Class

DCD - Part 15 Low Power Transmitter Below 1705 kHz
Fast Wireless Charger - FCC ID 2AN8F-M1025Q - Shenzhen Mossloo Industrial Co.,Ltd
2AN8F-M1025Q

Fast Wireless Charger

Apr 13, 2022

Equipment Class

DCD - Part 15 Low Power Transmitter Below 1705 kHz