FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Shenzhen Atongmu Technology Co., LTD/
  3. 2BAAR-GC05

2BAAR-GC05projector

Shenzhen Atongmu Technology Co., LTD
projector - FCC ID 2BAAR-GC05 - Shenzhen Atongmu Technology Co., LTD
Click to zoom

Application Details

Equipment Class
NII - Unlicensed National Information Infrastructure TX
Date of Grant
Sep 25, 2023
Application Purpose
Original Equipment
Date of Application
Sep 25, 2023
Equipment Note
projector
Frequency Range
5745.00000000 - 5825.00000000
Company
Shenzhen Atongmu Technology Co., LTD
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Attestation Statements

↗
↗
↗

Cover Letter(s)

↗
↗
↗

External Photos

↗
↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗
↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

+ - O K -- - User Guide MINI Projector GCO5 Due to continuous improvement,actual product maydifferent from the manual,manual is for reference only. After Sales Email [email protected] 1.1 Please read use manual carefully before you use projector.1.2 To prevent the projector from overheating and ensure its re liable operation, it is recomm ended to install the projector in a well-ventilated place. For exampl e, don't place the projector on a me ssy coffee table, sofa, bed, etc. Do not place the projector in a n arrow space with poor air circulation, such as a bookcase or closet.1.3 Do not use this projector near water or wet places. To redu ce the risk of fire and/or electric shock, do not expose this projector to rain or damp.1.4 Do not install this product near heat sources, such as radi ators, heaters, stoves or other heat-generating equipment.1.5 Use a dry cloth when cleaning.1.6 Use only the connectors/accessories specified by the manufa cturer. 1.7 If this machine is physically damaged or used carelessly, p lease do not continue to use this machine.Such as the power cord is damaged, liquid spills on the projector, the projector suffers from rain or damp, foreign objects fall into the projector or i nternal components are loose, etc. 1.8 Do not let objects or liquids enter the pr ojector. Otherwise, it may come into contact with dangerous voltage points and short-circuit components, resultin g in fire or electric shock. 1.9 Pay attention to the safety sign on the projector housing.1.10 This machine should only be repaired by relevant service p ersonnel. 1.11 Before cleaning the product, turn of f the power and unplug the power cord from the AC outlet. Wipe the host shell with a soft dry cloth dipped in neu tral detergent. If this product is not used for a long time, unplug the power plug from the AC outlet.1.12 Do not block the slits and openings for ventilation on the equipment. 1.13 Do not use it under the following conditions extreme hot, cold or humid environment; an area susceptible to a lot of dust and dirt; Near any equipment that generates a strong ma gnetic field; direct sunlight.1.14 When using this product, please keep it out of the reach o f children and pets to prevent damage caused by the temperature of the device.1.15 Do not look directly into the lens of the projector when u sing this projector. Bright light may harm your eyes. FCC Warnings:1.1 Warning-For children under 18 months, it is forbidden to us e this product. Children over 18 months should use this product in the presence of parents or ad ults to avoid accidents. 1.2 Warning-Do not look directly at the projector lens when the light bulb is on. Bright light may hurt your eyes.1.3 Warning-To reduce the risk of fire or electric shock, do no t expose this projector to rain or damp.1.4 Warning-Do not open or disassemble this projector to avoid electric shock. 1.5 Warning-Before changing the bulb, please completely cool th e unit. 1.6 Warning-When turning off the projector, make sure to finish the heat dissipation process before unplugging the power cord. The projector needs 90 second s to cool down. Warning tips: Please follow all warnings, precautions and recommen ded maintenance items in this user guide. This device complies with part 15 of the FCC Rules. Operation i s subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may caus e undesired operation. Any changes or modifications not expressly approved by the part y responsible for compliance could void the user's authority to operate the equipment.NOTE: This equipment has been tested and found to comply with t he limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential instal lation. This equipment generates, uses and can radiate radio frequency energy and, if not install ed and used in accordance with the instructions, may cause harmful interference to radio commu nications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or televisio n reception, which can be determined by turning the equipment off and on, th e user is encouraged to try to correct the interference by one or more of the following measur es: -- Reorient or relocate the receiving antenna.-- Increase the separation between the equipment and receiver.-- Connect the equipment into an outlet on a circuit different from that to which the receiver is connected.-- Consult the dealer or an experienced radio/TV technician for help. To maintain compliance with FCC’s RF Exposure guidelines, This equipment should be installed and operated with minimum 20cm distance between the radiator an d your body: Use only the supplied antenna. 2.1 As following picture,connect the power Cable.2.2 When power indicating lamp lighting, the equipment processi ng power. Press“ ”button on projector or remote control to switch o n the projector. AC100~250V After projector switched on,following UI will appear after 2-5s starting pictures flash. 7.1 Connection Introduction 7.2 OverviewPress the “power on”button, it will enter the main interface af ter the"power on"logo appeared for a few seconds.Main interface reviewPre-install application Mute OK Right Power UP Left Down Home Vol- Menu/Short FR Play/Paus Focusing Ring TF Extend then select local disk, USB flash disk driver to open (videos,p ictures,musics and all files) select the file you want to open, it will be lights around, then press OK to play, press the return key to exit. 7.3 Local PlayerConnect the USB flash disk driver to the projector and open loc al player with the remote control, 7.4 ConnectionWhen connecting a signal source to the projector,be sure to:1. Turn all equipment off before making any connections;2. U…

Text truncated - open the document above for the full version.

Attestation Statements

Shenzhen Atongmu Technology Co., LTD 2.911 (d)(5)(i) Equipment Type Attestation v1.2 Section 2.911(d)(5)(i) Certification – EquipmentType Company name: Shenzhen Atongmu Technology Co., LTD Address: Room 605,Office A Dong,Qiaohongsheng Wenhua Chuangyiyuan,Yintian Gongyequ,Yantian Shequ, Xixiang Jiedao,Baoan Qu,Shenzhen Shi,Guangdong, 518000, China Product Name: projector FCCID: 2BAAR-GC05 Model(s): GC05, GC05B, GC05 Pro, GC05A, GC06, GC03 Plus 2.911(d)(5)(i) EquipmentType We, [Shenzhen Atongmu Technology Co., LTD] (“the applicant”) certify that the equipment for which authorization is sought through certification is not:  Prohibited from receiving an equipment authorization pursuant to § 2.903; of the FCC rules.  Identified as an equipment type in the “Covered List” NOTE 1 Yours sincerely, Name: Lu Shen Date: Sept. 21, 2023 Title: Manager Company name: Shenzhen Atongmu Technology Co., LTD Signature: NOTE 1 “Covered List ”; is the List of Equipment and Services Covered By Section 2 of The Secure Networks Act, available at https://www.fcc.gov/supplychain/coveredlist References; 1) 986446 D01 Covered Equipment v01 https://apps.fcc.gov/oetcf/kdb/forms/FTSSearchResultPage.cfm?switch=P&id=325672 2) Federal Register document 2022-28263 published on 02/06/23 https://www.federalregister.gov/documents/2023/02/06/2022-28263/protecting-against-national-security-threats-to-the-com munications-supply-chain-through-the

Attestation Statements

Shenzhen Atongmu Technology Co., LTD 2.911 (d)(5)(ii) Applicant Attestation v1.3 Section 2.911(d)(5)(ii) Certification – Applicant (Covered List ) Company name: Shenzhen Atongmu Technology Co., LTD Address: Room 605,Office A Dong,Qiaohongsheng Wenhua Chuangyiyuan,Yintian Gongyequ,Yantian Shequ, Xixiang Jiedao,Baoan Qu,Shenzhen Shi,Guangdong, 518000, China Product Name: projector FCCID: 2BAAR-GC05 Model(s): GC05, GC05B, GC05 Pro, GC05A, GC06, GC03 Plus 2.911(d)(5)(ii) Applicant filing We, [Shenzhen Atongmu Technology Co., LTD] (“the applicant”) certify that, as of the date of the filing of the application, the applicant is not identified NOTE 1 on the “Covered List” NOTE 2 , established pursuant to §1.50002 of this chapter, as an entity producing covered communications equipment. Yours sincerely, Name: Lu Shen Date: Sept. 21, 2023 Title: Manager Company name: Shenzhen Atongmu Technology Co., LTD Signature: NOTE 1 Delete option not applicable to this application. NOTE 2 “Covered List ”; is the List of Equipment and Services Covered By Section 2 of The Secure Networks Act, available at https://www.fcc.gov/supplychain/coveredlist References; 1) 986446 D01 Covered Equipment v01 https://apps.fcc.gov/oetcf/kdb/forms/FTSSearchResultPage.cfm?switch=P&id=325672 2) Federal Register document 2022-28263 published on 02/06/23 https://www.federalregister.gov/documents/2023/02/06/2022-28263/protecting-against-national-security-threats-to-the-com munications-supply-chain-through-the

Cover Letter(s)

FCC Software Configuration Control Declaration Rev1.0.docx Shenzhen Atongmu Technology Co., LTD FCC Software Configuration Control Declaration Date: Sept. 21, 2023 Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Attn: OET Dept. Product: projector Model No.: GC05, GC05B, GC05 Pro, GC05A, GC06, GC03 Plus Regarding FCC Country Code Selection guidelines identified in KDB 594280 D02 v01r03. “All applications for equipment authorization for transmitters that can have radio parameters, or other technical parameters, reported to the Commission set by software must have an attestation indicating that no third party will have software, or configuration control, to program the device out of compliance of the technical rules under which it has been certified.” We declare that no third party will have software, or configuration control, to program the device out of compliance of the technical rules under which it has been certified. Date: Sept. 21, 2023 Name: Lu Shen Title: Manager Signature of applicant:

Cover Letter(s)

Shenzhen Atongmu Technology Co., LTD Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 USA Date: Sept. 21, 2023 Subject; Request for Confidentiality FCC ID: 2BAAR-GC05 To Whom It May Concern, Pursuant to the provisions of the Commission’s rules Title 47 Sections §0.457 and §0.459, we are requesting the Commission to withhold the following attachment(s) as confidential documents from public disclosure indefinitely. These documents contain detailed system and equipment descriptions and are considered as proprietary information in operation of the equipment. The public disclosure of these documents might be harmful to our company and would give competitors an unfair advantage in the market. Schematic Diagram Block Diagram Parts List Operational Description Tune-up Procedure In additional to above mentioned documents, in order to comply with the marketing regulations in Title 47 CFR §2.803 and the importation rules in Title 47 CFR §2.1204, while ensuring that business sensitive information remains confidential until the actual marketing of newly authorized devices, we request Short Term Confidentiality of the following attachment(s); External Photos Test Setup Photos Internal Photos User Manual For 45 days, pursuant to Public Notice DA 04-1705. OR For 180 days pursuantto KDB 726920 D01. It is our understanding that all measurement test reports, FCC ID label format and correspondence during the certification review process cannot be granted as confidential documents and this information will be available for public review once the grant of equipment authorization is issued. Sincerely, Signature: Name: Lu Shen Title: Manager

Cover Letter(s)

Shenzhen Atongmu Technology Co., LTD Model Difference Declaration To Whom It May Concern, We, Shenzhen Atongmu Technology Co., LTD (projector); Model Number: GC05, GC05B, GC05 Pro, GC05A, GC06, GC03 Plus Model Difference: All model’s the function, software and electric circuit are the same, only with a product model named different. Test sample model: GC05. Please contact me if you have any question. Signature: Date: Sept. 21, 2023 Name: Lu Shen Title: Manager

External Photos

Shenzhen Atongmu Technology Co., LTD Agent Authorization Company: Shenzhen Atongmu Technology Co., LTD Address: Room 605,Office A Dong,Qiaohongsheng Wenhua Chuangyiyuan,Yintian Gongyequ,Yantian Shequ, Xixiang Jiedao,Baoan Qu,Shenzhen Shi,Guangdong, 518000, China Product Name: projector Model Number(s): GC05, GC05B, GC05 Pro, GC05A, GC06, GC03 Plus Product Description: projector We authorize MiCOM Labs Inc., 575 Boulder Court, Pleasanton, California 94566, USA, to act on our behalf on all matters concerning the certification of above named equipment. We declare that MiCOM Labs Inc. is allowed to forward all information related to the approval and certification of equipment to the regulatory agencies as required and to discuss any issues concerning the approval application. Any and all acts carried out by MiCOM Labs on our behalf shall have the same effect as acts of our own. Signature: Date: Sept. 21, 2023 Name: Lu Shen Title: Manager Company: Shenzhen Atongmu Technology Co., LTD

External Photos

Annex A External Photos Test Model: GC05 Page 1 of 4 Test Model: GC05 Page 2 of 4 Test Model: GC05 Page 3 of 4 Test Model: GC05 Page 4 of 4

ID Label/Location Info

FCC ID LABEL: Ca. 30mm x 40mm label location FCC ID: 2BAAR‐GC05

Internal Photos

Annex B Internal Photo Test Model: GC05 Page 1 of 5 Test Model: GC05 Page 2 of 5 BT Antenna WIFI Antenna Test Model: GC05 Page 3 of 5 Test Model: GC05 Page 4 of 5 Test Model: GC05 Page 5 of 5

RF Exposure Info

MPE ESTIMATION FCC ID: 2BAAR-GC05 1, Limit for General Population/ Uncontrolled Exposures Frequency Power density (mW/ cm 2 ) Averaging time(minutes) 300MHz----1.5GHz F/1500 30 1.5GHz---100GHz 1.0 30 2, Estimation Result Mode Max PK Output power(dBm) Tune Up Power(dBm) Max Tune Up power(mW) Antenna Gain(dBi) Antenna Gain (linear) MPE (mW/cm²) BT 1.91 1±1(2) 1.58 -0.58 0.87 0.00027 2.4G WIFI 14.10 13.5±1(14.5)28.18 4.72 2.96 0.01661 5.2G WIFI 10.91 10±1(11) 12.59 3.72 2.36 0.00591 5.8G WIFI 10.54 10±1(11) 12.59 3.72 2.36 0.00591 Note: Note: The estimation distance is 20cm Note: PK Output power= conducted power. Conducted power see the test report HK2308223830-1E/2E/3E/4E. When the minimum test separation distance is >20 cm, a distance of 20 cm is applied to determine RF Exposure test exclusion. The test exclusion threshold is 0.01661mW/cm² which is< 1.0mW/cm², RF Exposure testing is not required. -------The End-------

Test Report

Shenzhen Xuhang Communication Technology Co., Ltd CUSTOMER CUSTOMER NO. RT6710‐ATMGC06‐V5.0 PART NAME WIFI LAN SUPPLIER NO. XH230063(L=82mm) CUSTOMER APPROVED BY APPROVAL CHIEF SUPERVISOR DESIGN CHECK APPROVAL Luo Robert SHANG Date:September 7, 2023 DIRECTORY NO. Contents Number of Page Page Code 1 Spec Cover 1 1 2 DIRECTORY1 2 3 Test Reports 1 3 4 MatchingCircuits 1 4 5 DRAWING 1 5 6 Test Data 4 6~10 7 Antenna assembly position 1 11 TEST REPORTS Frequency WIFI(2400~2500MHz;5150~5850MHz) Impedance 50 0hm Nominal V.S.W.R ≤2.0 Return Loss ‐10dB Max Radiation Omni‐directional Gain(Peak) 4.72dBi Polarization Linear,Vertical Admitted Power 1W Connector I‐PEX I Physical Properties Antenna Material FPC Cable Type O.D.0.81mm Operating Temp. ‐10‐+60°C Storage Temp. ‐10‐+70°C Cable Color Black Matching Circuits Element Value Vender E1(0402) E2(0402) 0Ω E3(0402) E4(0402) 0Ω The original matching circuit has not been modified DRAWING Test Data Antenna assembly position

Test Report

Page 1 of 63 Report No.: HK2308223830-3E FCC TEST REPORT Test report On Behalf of Shenzhen Atongmu Technology Co., LTD For projector Model No.: GC05, GC05B, GC05 Pro, GC05A, GC06, GC03 Plus FCC ID: 2BAAR-GC05 Prepared For : Shenzhen Atongmu Technology Co., LTD Room 605,Office A Dong,Qiaohongsheng Wenhua Chuangyiyuan,Yintian Gongyequ,Yantian Shequ, Xixiang Jiedao,Baoan Qu,Shenzhen Shi,Guangdong, 518000, China Prepared By : Shenzhen HUAK Testing Technology Co., Ltd. 1-2/F., Building B2, Junfeng Zhongcheng Zhizao Innovation Park, Heping, Fuhai Street, Bao’an District, Shenzhen, Guangdong, China Date of Test: Aug. 22, 2023 ~ Sept. 14, 2023 Date of Report: Sept. 14, 2023 Report Number: HK2308223830-3E Page 2 of 63 Report No.: HK2308223830-3E TEST RESULT CERTIFICATION Applicant’s name .................. : Shenzhen Atongmu Technology Co., LTD Address .................................. : Room 605,Office A Dong,Qiaohongsheng Wenhua Chuangyiyuan,Yintian Gongyequ,Yantian Shequ, Xixiang Jiedao,Baoan Qu,Shenzhen Shi,Guangdong, 518000, China Manufacture's Name ............. : Shenzhen Atongmu Technology Co., LTD Address .................................. : Room 605,Office A Dong,Qiaohongsheng Wenhua Chuangyiyuan,Yintian Gongyequ,Yantian Shequ, Xixiang Jiedao,Baoan Qu,Shenzhen Shi,Guangdong, 518000, China Product description Trade Mark: N/A Product name ............................ : projector Model and/or type reference . : GC05, GC05B, GC05 Pro, GC05A, GC06, GC03 Plus Standards .............................. : FCC Rules and Regulations Part 15 Subpart E Section 15.407 ANSI C63.10: 2013 This publication may be reproduced in whole or in part for non-commercial purposes as long as the Shenzhen HUAK Testing Technology Co., Ltd. is acknowledged as copyright owner and source of the material. Shenzhen HUAK Testing Technology Co., Ltd. takes no responsibility for and will not assume liability for damages resulting from the reader's interpretation of the reproduced material due to its placement and context. Date of Test ............................................ : Date (s) of performance of tests ............. : Aug. 22, 2023 ~ Sept. 14, 2023 Date of Issue ........................................... : Sept. 14, 2023 Test Result ............................................... : Pass Prepared by: Project Engineer Reviewed by: Project Supervisor Approved by: Technical Director Page 3 of 63 Report No.: HK2308223830-3E TABLE OF CONTENTS 1. TEST RESULT SUMMARY ........................................................................ 5 1.1. TEST PROCEDURES AND RESULTS ............................................................................................... 5 1.2. INFORMATION OF THE TEST LABORATORY ................................................................................ 5 1.3. MEASUREMENT UNCERTAINTY ..................................................................................................... 6 2. EUT DESCRIPTION ................................................................................... 7 2.1. GENERAL DESCRIPTION OF EUT ................................................................................................... 7 2.2. OPERATION FREQUENCY EACH OF CHANNEL ............................................................................ 8 2.3. OPERATION OF EUT DURING TESTING .......................................................................................... 8 2.4. DESCRIPTION OF TEST SETUP ....................................................................................................... 9 2.5. DESCRIPTION OF SUPPORT UNITS .............................................................................................. 10 3. GENERAL INFORMATION ...................................................................... 11 3.1. TEST ENVIRONMENT AND MODE ................................................................................................. 11 4. TEST RESULTS AND MEASUREMENT DATA ...................................... 14 4.1. CONDUCTED EMISSION ................................................................................................................. 14 4.2. MAXIMUM CONDUCTED OUTPUT POWER ................................................................................... 18 4.3. 6DB EMISSION BANDWIDTH .......................................................................................................... 21 4.4. 26DB BANDWIDTH AND 99% OCCUPIED BANDWIDTH .............................................................. 22 4.5. POWER SPECTRAL DENSITY ........................................................................................................ 29 4.6. BAND EDGE ..................................................................................................................................... 36 4.7. SPURIOUS EMISSION ..................................................................................................................... 49 4.8. FREQUENCY STABILITY MEASUREMENT ................................................................................... 57 4.9. ANTENNA REQUIREMENT ............................................................................................................. 60 5. PHOTOGRAPHS OF TEST SETUP ......................................................... 61 6. PHOTOS OF THE EUT ............................................................................ 63 Page 4 of 63 Report No.: HK2308223830-3E ** Modified History ** Revision Description Issued Data Remark Revision 1.0 Initial Test Report Release Sept. 14, 2023 Jason Zhou Page 5 of 63 Report No.: HK2308223830-3E 1. TEST RESULT SUMMARY 1.1. TEST PROCEDURES AND RESULTS Requirement CFR 47 Section Result Antenna requirement §15.203 PASS AC Power Line Conducted Emission §15.207 PASS Maximum Conducted Output Power §15.407(a) PASS 6dB Emission Bandwidth §15.407(e) N/A 26dB Emission Bandwidth& 99% Occupied Bandwidth §15.407(a) PASS Power Spectral Density §15.407(a) PASS Band edge §15.407(b)/15.…

Text truncated - open the document above for the full version.

Test Report

Page 1 of 71 Report No.: HK2308223830-4E FCC TEST REPORT Test report On Behalf of Shenzhen Atongmu Technology Co., LTD For projector Model No.: GC05, GC05B, GC05 Pro, GC05A, GC06, GC03 Plus FCC ID: 2BAAR-GC05 Prepared For : Shenzhen Atongmu Technology Co., LTD Room 605,Office A Dong,Qiaohongsheng Wenhua Chuangyiyuan,Yintian Gongyequ,Yantian Shequ, Xixiang Jiedao,Baoan Qu,Shenzhen Shi,Guangdong, 518000, China Prepared By : Shenzhen HUAK Testing Technology Co., Ltd. 1-2/F., Building B2, Junfeng Zhongcheng Zhizao Innovation Park, Heping, Fuhai Street, Bao’an District, Shenzhen, Guangdong, China Date of Test: Aug. 22, 2023 ~ Sept. 14, 2023 Date of Report: Sept. 14, 2023 Report Number: HK2308223830-4E Page 2 of 71 Report No.: HK2308223830-4E TEST RESULT CERTIFICATION Applicant’s name ................. : Shenzhen Atongmu Technology Co., LTD Address .................................. : Room 605,Office A Dong,Qiaohongsheng Wenhua Chuangyiyuan,Yintian Gongyequ,Yantian Shequ, Xixiang Jiedao,Baoan Qu,Shenzhen Shi,Guangdong, 518000, China Manufacture's Name ............ : Shenzhen Atongmu Technology Co., LTD Address .................................. : Room 605,Office A Dong,Qiaohongsheng Wenhua Chuangyiyuan,Yintian Gongyequ,Yantian Shequ, Xixiang Jiedao,Baoan Qu,Shenzhen Shi,Guangdong, 518000, China Product description Trade Mark: N/A Product name ............................ : projector Model and/or type reference : GC05, GC05B, GC05 Pro, GC05A, GC06, GC03 Plus Standards .............................. : FCC Rules and Regulations Part 15 Subpart E Section 15.407 ANSI C63.10: 2013 This publication may be reproduced in whole or in part for non-commercial purposes as long as the Shenzhen HUAK Testing Technology Co., Ltd. is acknowledged as copyright owner and source of the material. Shenzhen HUAK Testing Technology Co., Ltd. takes no responsibility for and will not assume liability for damages resulting from the reader's interpretation of the reproduced material due to its placement and context. Date of Test ........................................... : Date (s) of performance of tests ............. : Aug. 22, 2023 ~ Sept. 14, 2023 Date of Issue .......................................... : Sept. 14, 2023 Test Result .............................................. : Pass Testing Engineer : (Gary Qian) Technical Manager : (Eden Hu) Authorized Signatory : (Jason Zhou) Page 3 of 71 Report No.: HK2308223830-4E TABLE OF CONTENTS 1. TEST RESULT SUMMARY ........................................................................ 5 1.1. TEST PROCEDURES AND RESULTS ............................................................................................... 5 1.2. INFORMATION OF THE TEST LABORATORY ................................................................................ 5 1.3. MEASUREMENT UNCERTAINTY ..................................................................................................... 6 2. EUT DESCRIPTION ................................................................................... 7 2.1. GENERAL DESCRIPTION OF EUT ................................................................................................... 7 2.2. OPERATION FREQUENCY EACH OF CHANNEL ............................................................................ 8 2.3. OPERATION OF EUT DURING TESTING .......................................................................................... 8 2.4. DESCRIPTION OF TEST SETUP ....................................................................................................... 9 2.5. DESCRIPTION OF SUPPORT UNITS .............................................................................................. 10 3. GENERAL INFORMATION ...................................................................... 11 3.1. TEST ENVIRONMENT AND MODE ................................................................................................. 11 4. TEST RESULTS AND MEASUREMENT DATA ...................................... 14 4.1. CONDUCTED EMISSION ................................................................................................................. 14 4.2. MAXIMUM CONDUCTED OUTPUT POWER ................................................................................... 18 4.3. 6DB EMISSION BANDWIDTH .......................................................................................................... 21 4.4. 26DB BANDWIDTH AND 99% OCCUPIED BANDWIDTH .............................................................. 28 4.5. POWER SPECTRAL DENSITY ........................................................................................................ 29 4.6. BAND EDGE ..................................................................................................................................... 36 4.7. SPURIOUS EMISSION ..................................................................................................................... 49 4.8. FREQUENCY STABILITY MEASUREMENT ................................................................................... 66 4.9. ANTENNA REQUIREMENT ............................................................................................................. 68 5. PHOTOGRAPHS OF TEST SETUP ......................................................... 69 6. PHOTOS OF THE EUT ............................................................................ 71 Page 4 of 71 Report No.: HK2308223830-4E ** Modified History ** Revision Description Issued Data Remark Revision 1.0 Initial Test Report Release Sept. 14, 2023 Jason Zhou Page 5 of 71 Report No.: HK2308223830-4E 1. TEST RESULT SUMMARY 1.1. TEST PROCEDURES AND RESULTS Requirement CFR 47 Section Result Antenna requirement §15.203 PASS AC Power Line Conducted Emission §15.207 PASS Maximum Conducted Output Power §15.407(a) PASS 6dB Emission Bandwidth §15.407(e) PASS 26dB Emission Bandwidth& 99% Occupied Bandwidth §15.407(a) N/A Power Spectral Density §15.407(a) PASS Band edge §15.407(b)/15.209/…

Text truncated - open the document above for the full version.

Test Setup Photos

Model: GC05 Radiated Emission Conducted Emission

Contact Information

Applicant

Owen Hu
[email protected]15710816294Fax: 15710816294

Technical Contact

Shenzhen Atongmu Technology Co., LTD
[email protected]

China

Test Firm

Shenzhen HUAK Testing Technology Co., Ltd.Jason Zhou
[email protected]86-755-23029901

Technical Specifications

#Rule PartsFrequency RangePower Output
215E5.75 GHz - 5.83 GHz11.32 mW
Confidentiality
Long Term
Grant Notes
Output power listed is conducted power. This device contains 20 and 40 MHz signal bandwidth. The antenna used with this transmitter must be installed to provide a minimum separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi- transmitter product procedures. End-users must be provided with operating procedures for satisfying RF exposure compliance.

Other Applications from Shenzhen Atongmu Technology Co., LTD

2BAAR-AE261

Projector

Aug 10, 2026

Equipment Class

DTS - Digital Transmission System
Projector - FCC ID 2BAAR-AE211 - Shenzhen Atongmu Technology Co., LTD
2BAAR-AE211

Projector

Mar 18, 2026

Equipment Class

DTS - Digital Transmission System
2BAAR-M269A

Projector

Aug 05, 2024

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
Tablet PC - FCC ID 2BAAR-F45A - Shenzhen Atongmu Technology Co., LTD
2BAAR-F45A

Tablet PC

Feb 20, 2024

Equipment Class

DTS - Digital Transmission System
Projector - FCC ID 2BAAR-GC03 - Shenzhen Atongmu Technology Co., LTD
2BAAR-GC03

Projector

Feb 27, 2023

Equipment Class

DTS - Digital Transmission System