FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Alpha Arsenal LLC/
  3. DCO-EXPRESS-E3

DCO-EXPRESS-E3GSM Motion Detector Express-E3 GSM unit

Alpha Arsenal LLC
GSM Motion Detector Express-E3 GSM unit - FCC ID DCO-EXPRESS-E3 - Alpha Arsenal LLC
Click to zoom

Application Details

Equipment Class
DSR - Part 15 Remote Control/Security Device Transceiver
Date of Grant
Jan 07, 2013
Application Purpose
Original Equipment
Date of Application
Jan 07, 2013
Equipment Note
GSM Motion Detector Express-E3 GSM unit
Frequency Range
433.50000000 - 433.50000000
Company
Alpha Arsenal LLC
Country
United States

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Cover Letter(s)

ALPHA ARSENAL LLC. 910 Foulk Road, Suite 201, Wilmington, New Castle County, DE 19803 tel.: +1718-825-6292 emai: [email protected] March 21, 2012 Compliance Certification Services Certification Division 561F Monterey Road Morgan Hill, CA 95037 To whom it may concern: We, the undersigned, hereby authorize Advanced Compliance Laboratory, Inc., to act on our behalf in all manners relating to application for equipment authorization, including signing of all documents relating to these matters. Any and all acts carried out by Advanced Compliance Laboratory, Inc. on our behalf shall have the same effect as acts of our own. We, the undersigned, hereby certify that we are not subject to a denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 853(a). In authorizing Advanced Compliance Laboratory, Inc. as our agent, we still recognize that we are responsible to: • comply with the relevant provisions of the certification program; • make all necessary arrangements for the conduct of the evaluation, including provision for examining documentation and access to all areas, records (including internal audit reports) and personnel for the purposes of evaluation (e.g. testing, inspection, assessment, surveillance, reassessment) and resolution of complaints; • make claims regarding certification only in respect of the scope for which certification has been granted; • do not use our product certification in such a manner as to bring the Certification Division into disrepute and not make any statement regarding our product certification which the Certification Division may consider misleading or unauthorized; • upon suspension or cancellation of certification, discontinue use of all advertising matter that contains any reference thereto and return any certification documents as required by the Certification Division; • use certification only to indicate the products are certified as being in conformity with specified standards; • endeavor to ensure that no certificate or report nor any part thereof is used in a misleading manner; • ensure that any reference to our product certification in communication media such as documents, brochures or advertising, complies with the requirements of the Certification Division; • keep a record of all complaints made known to the us relating to the product's compliance with requirements of the relevant standard and to make these records available to the Certification Division when requested; • take appropriate action with respect to such complaints and any deficiencies found in products or services that affect compliance with the requirements for certification; • document the actions taken. This authorization is valid until further written notice from the applicant. Sincerely Yours, Signature: Printed Name: Sergey Medvedev Title: General Manager Company: Alpha Arsenal LLC

Cover Letter(s)

December 11, 2012 Subject: FCC Confidentiality Request for FCC ID: DCO-EXPRESS-E3 T o Whom It May Concern: Please accept this letter as an official request to have all Schematics, Bill of Materials, Block D iagrams and Methods of Operation of the DCO-EXPRESS-E3, Express-E3 GSM application treated as confidential. This request is made pursuant to 47 CFR Section 0.457(d) of the Commission's Rules, and Section 552(b)(4) of the Freedom of Information Act. The information contained within represents many hours of engineering and design that should remain confidential as to protect our company's intellectual property and investments. Sincerely, Signature: Printed Name: Sergey Medvedev Title: General Manager Company: Alpha Arsenal LLC ALPHA ARSENAL LLC. 910 Foulk Road, Suite 201, Wilmington, New Castle County, DE 19803 tel.: +1718-825-6292 emai: [email protected]

External Photos

21 Figure 7.1 Front View 22 Figure 7.2 Rear View

ID Label/Location Info

8 2. PRODUCT LABELING Figure 2.1 FCC ID Label Figure 2.2 Location of Label on the Side of EUT Figure 2.2 FCC ID Label Location FCC ID: DCO-EXPRESS-E3 Contains FCC ID: UDV-0912142009007 This device complies with part 15 of the FCC Rules. Operating is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. Figure 2.1 FCC ID Label (FCC Statement will be shown in user manual. Font for FCC ID label: 10~12) FCC Label

Internal Photos

23 Figure 7.3 Cover opened_ Inside View 24 Figure 7.4 Main Board Component Side 25 Figure 7.5 Main Board Foil Side 26 Figure 7.6 GSM Module Board Component Side 27 Figure 7.7 GSM Module Board Foil Side

Test Report

1 ELECTROMAGNETIC EMISSION COMPLIANCE REPORT of Express-E3 GSM Unit MODEL: EXPRESS-E3 FCC ID: DCO-EXPRESS-E3 December 12, 2012 This report concerns (check one): Original grant x Class II change Equipment type: Low Power Intentional Radiator Deferred grant requested per 47 CF 0.457(d)(1)(ii)? yes no x If yes, defer until: (date) Company agrees to notify the Commission by (date) of the intended date of announcement of the product so that the grant can be issued on that date. Transition Rules Request per 15.37? yes no x If no, assumed Part 15, Subpart B for unintentional radiators - the new 47 CFR [10-1-90 Edition] provision. Report prepared for: ALPHA ARSENAL LLC Report prepared by: Advanced Compliance Lab Report number: 0048-121211-01 The test result in this report IS supported and covered by the NVLAP accreditation 6 Randolph Way Hillsborough, NJ 08844 Tel: (908) 927 9288 Fax: (908) 927 0728 Advanced Compliance Laboratory 2 Table of Contents Report Cover Page ..................................................................................................... 1 Table of Contents ....................................................................................................... 2 Figures ........................................................................................................................ 3 1. GENERAL INFORMATION ........................................................................................ 4 1.1 Verification of Compliance .............................................................................................. 4 1.2 Equipment Modifications ................................................................................................. 5 1.3 Product Information ......................................................................................................... 6 DCO-EXPRESS-E3 ............................................................................................................... 6 1.4 Test Methodology ............................................................................................................ 6 1.5 Test Facility ..................................................................................................................... 6 1.6 Test Equipment ................................................................................................................ 6 1.7 Statement for the Document Use ...................................................................................... 7 2. PRODUCT LABELING .................................................................................................. 8 3. SYSTEM TEST CONFIGURATION ....................................................................... 9 3.1 Justification...................................................................................................................... 9 3.2 Special Accessories .......................................................................................................... 9 3.3 Configuration of Tested System........................................................................................ 9 4. SYSTEM SCHEMATICS ............................................................................................... 12 5. CONDUCTED EMISSION DATA ............................................................................ 13 5.1 Test Methods and Conditions ........................................................................................... 13 5.2 Test Data ......................................................................................................................... 13 6. RADIATED EMISSION DATA.................................................................................. 16 6.1 Field Strength Calculation ............................................................................................... 16 6.2 Test Methods and Conditions ........................................................................................... 16 6.3 Test Data ......................................................................................................................... 16 6.4 Occupied Bandwidth ........................................................................................................ 18 7. PHOTOS OF TESTED EUT.......................................................................................... 20 3 Figures Figure 2.1 FCC ID Label ........................................................................................... 8 Figure 2.2 Location of Label on Back of the EUT .................................................... 8 Figure 3.1 Radiated Test Setup, Position 1 ............................................................... 10 Figure 3.4 Conducted Test Setup, Front................................................................... 11 Figure 3.5 Conducted Test Setup, Rear .................................................................... 11 Figure 4.1 EUT Schematics ....................................................................................... 12 Figure 5.1 Line Conducted ........................................................................................ 14 Figure 5.2 Neutral Conducted .................................................................................. 15 Figure 6.1 Bandwidth Plot ........................................................................................ 18 Figure 6.2 Pulse Train Timing .................................................................................. 19 Figure 7.1 Front View ................................................................................................ 21 Figure 7.2 Rear View ................................................................................................. 22 Figure 7.3 Cover Opened_ Inside View ................................................................... 23 Figure 7.4 Main Board Component Side .................................................................. 24 Figure 7.5 Main Board Foil Side .....…

Text truncated - open the document above for the full version.

Test Setup Photos

10 Figure 3.1 Radiated Test Setup

Contact Information

Applicant

Sergey Medvedev(General Manager)
[email protected]7188256292Fax: 7188825692

Technical Contact

Advanced Compliance LaboratoryWei Li
[email protected](908)927-9288

6 Randolph Way · Hillsborough, New Jersey · United States

Non-Technical Contact

Advanced Compliance LaboratoryWei Li
[email protected](908)927-9288

Test Firm

Advanced Compliance LaboratoryWei Li
[email protected]908-927-9288Fax: 908-927-0728

Technical Specifications

#Rule PartsFrequency RangePower Output
115.231433.5 MHz - 433.5 MHz-
Confidentiality
Long Term

Other Applications from Alpha Arsenal LLC

Remote Controller BN-3S-33V (BN-3S-33RC) - FCC ID DCO-BN-3S-33 - Alpha Arsenal LLC
DCO-BN-3S-33

Remote Controller BN-3S-33V (BN-3S-33RC)

Oct 06, 2014

Equipment Class

DSC - Part 15 Security/Remote Control Transmitter
Express GSM2 GSM Unit EXPRESSGSM2 - FCC ID DCO-EXPRESSGSM2 - Alpha Arsenal LLC
DCO-EXPRESSGSM2

Express GSM2 GSM Unit EXPRESSGSM2

Aug 27, 2012

Equipment Class

DSR - Part 15 Remote Control/Security Device Transceiver
Express GSM2 Remote Control BN3-433A - FCC ID DCO-BN3-433A - Alpha Arsenal LLC
DCO-BN3-433A

Express GSM2 Remote Control BN3-433A

Aug 27, 2012

Equipment Class

DSR - Part 15 Remote Control/Security Device Transceiver
EXPRESSGSM2 SIREN SN1-A - FCC ID DCO-SN1-A - Alpha Arsenal LLC
DCO-SN1-A

EXPRESSGSM2 SIREN SN1-A

Aug 13, 2012

Equipment Class

DSR - Part 15 Remote Control/Security Device Transceiver
Express GSM 433 Tx/Rx Base Unit ExpressGSM1 - FCC ID DCO-EXPRESSGSM1 - Alpha Arsenal LLC
DCO-EXPRESSGSM1

Express GSM 433 Tx/Rx Base Unit ExpressGSM1

May 19, 2012

Equipment Class

DSR - Part 15 Remote Control/Security Device Transceiver