
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
Federal Communications Commission Authorization and Evaluation Division Confidentiality Request FCC ID: EMJM2A301 Pursuant to Sections 0.457 and 0.459 of the Commissionβs Rules, the Applicant hereby requests confidential treatment of information accompanying this Application as outlined below: Schematics Block Diagram The above materials contain trade secrets and proprietary information not customarily released to the public. The public disclosure of these matters might be harmful to the Applicant and provide unjustified benefits to its competitors. The Applicant understands that pursuant to Rule 0.457, disclosure of this Application and all accompanying documentation will not be made before the date of the Grant for this application. Sincerely yours, ------------------------------------------------------------------- C.T. Huang Compliance Dept. / Director Phone: 886-2-2798-9008 ext.1710 Fax: 886-2-8797-1565 Email: [email protected]
Power of Attorney Date: 2005/11/24 To whom it may concern: We, the undersigned PRIMAX ELECTRONICS LTD. hereby authorize Advance Data Technology Corporation (ADT) of Taiwan to act on our behalf in all matters relating to all processes required in the FCC Part 15C approval and any communication needed with the national authority. Any and all acts carried out by ADT on our behalf shall have the same effects as acts of our own. If you have any questions regarding the authorization, please donβt hesitate to contact us. Thank you! Sincerely yours, ------------------------------------------------------------------- C.T. Huang Compliance Dept. / Director Phone: 886-2-2798-9008 ext.1710 Fax: 886-2-8797-1565 Email: [email protected]
Page 1 CONSTRUCTION PHOTOS OF EUT Page 2
FCC ID: EMJM2A301 FCC LABEL LOCATION The label will be permanently affixed at a conspicuous location on the device. LABEL
Page 3 Page 4 Page 5 Page 6
FCC ID: EMJM2A301 Report No.: RF941026A07 Operational Description The transmitter of the EUT (2.4GHz Mouse) is powered by 3V battery. The type of antenna is Wiggle antenna. The output power of this device is very low. Under normal use condition, the transmitter and the receiver are quite close, so high EIRP power is neither necessary nor allowed because of interference.
FCC ID: EMJM2A301 Report No.: RF941026A071Report Format Version 2.0.4 FCC TEST REPORT REPORT NO.: RF941026A07 MODEL NO.: CP267792, CP267793 RECEIVED: Oct. 26, 2005 TESTED: Oct. 31 ~ Nov. 1, 2005 ISSUED: Nov. 24, 2005 APPLICANT: PRIMAX ELECTRONICS LTD. ADDRESS: No. 669, Ruey Kuang Road, Neihu, Taipei, Taiwan. R.O.C. ISSUED BY: Advance Data Technology Corporation LAB LOCATION: No. 47, 14th Ling, Chia Pau Tsuen, Lin Kou Hsiang 244, Taipei Hsien, Taiwan, R.O.C. This test report consists of 36 pages in total. It may be duplicated completely for legal use with the approval of the applicant. It should not be reproduced except in full, without the written approval of our laboratory. The client should not use it to claim product endorsement by CNLA, A2LA or any government agencies. The test results in the report only apply to the tested sample. 0528 ILAC MRA FCC ID: EMJM2A301 Report No.: RF941026A072Report Format Version 2.0.4 Table of Contents 1.CERTIFICATION...........................................................................................4 2.SUMMARY OF TEST RESULTS...................................................................5 2.1MEASUREMENT UNCERTAINTY................................................................5 3.GENERAL INFORMATION............................................................................6 3.1GENERAL DESCRIPTION OF EUT..............................................................6 3.2DESCRIPTION OF TEST MODES................................................................7 3.2.1CONFIGURATION OF SYSTEM UNDER TEST...........................................8 3.2.2TEST MODE APPLICABILITY AND TESTED CHANNEL DETAIL:...............9 3.3GENERAL DESCRIPTION OF APPLIED STANDARDS.............................10 3.4DESCRIPTION OF SUPPORT UNITS........................................................10 4.TEST TYPES AND RESULTS.....................................................................11 4.1CONDUCTED EMISSION MEASUREMENT..............................................11 4.2RADIATED EMISSION MEASUREMENT...................................................11 4.2.1LIMITS OF RADIATED EMISSION MEASUREMENT.................................11 4.2.2TEST INSTRUMENTS................................................................................12 4.2.3TEST PROCEDURES.................................................................................13 4.2.4DEVIATION FROM TEST STANDARD.......................................................13 4.2.5TEST SETUP..............................................................................................14 4.2.6EUT OPERATING CONDITIONS................................................................14 4.2.7TEST RESULTS..........................................................................................15 4.36dB BANDWIDTH MEASUREMENT..........................................................19 4.3.1LIMITS OF 6dB BANDWIDTH MEASUREMENT........................................19 4.3.2TEST INSTRUMENTS................................................................................19 4.3.3TEST PROCEDURE...................................................................................19 4.3.4DEVIATION FROM TEST STANDARD.......................................................19 4.3.5TEST SETUP..............................................................................................19 4.3.6EUT OPERATING CONDITIONS................................................................19 4.3.7TEST RESULTS..........................................................................................20 4.4MAXIMUM PEAK OUTPUT POWER..........................................................22 4.4.1LIMITS OF MAXIMUM PEAK OUTPUT POWER MEASUREMENT...........22 4.4.2INSTRUMENTS..........................................................................................22 4.4.3TEST PROCEDURES.................................................................................23 4.4.4DEVIATION FROM TEST STANDARD.......................................................23 4.4.5TEST SETUP..............................................................................................23 4.4.6EUT OPERATING CONDITIONS................................................................23 4.4.7TEST RESULTS..........................................................................................24 4.5POWER SPECTRAL DENSITY MEASUREMENT......................................26 4.5.1LIMITS OF POWER SPECTRAL DENSITY MEASUREMENT...................26 4.5.2TEST INSTRUMENTS................................................................................26 4.5.3TEST PROCEDURE...................................................................................26 4.5.4DEVIATION FROM TEST STANDARD.......................................................26 4.5.5TEST SETUP..............................................................................................26 4.5.6EUT OPERATING CONDITION..................................................................26 FCC ID: EMJM2A301 Report No.: RF941026A073Report Format Version 2.0.4 4.5.7TEST RESULTS..........................................................................................27 4.6BAND EDGES MEASUREMENT................................................................29 4.6.1LIMITS OF BAND EDGES MEASUREMENT..............................................29 4.6.2TEST INSTRUMENTS................................................................................29 4.6.3TEST PROCEDURE...................................................................................29 4.6.4DEVIATION FROM TEST STANDARD.......................................................29 4.6.5EUT OPERATING CONDITION..................................................................29 4.6.6TEST RESULTS..........................................................................................30 4.7ANTENNA REQUIREMENT........................................................................33 4β¦
Text truncated - open the document above for the full version.
FCC ID: EMJM2A301 Report No.: RF941026A0734Report Format Version 2.0.4 5. PHOTOGRAPHS OF THE TEST CONFIGURATION RADIATED EMISSION TEST
No.19, Hwa Ya 2nd Rd., Kwei Shan Hsiang Β· Taoyuan Hsien Β· Taiwan
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 1.00 mW |
Wireless Headset
Equipment Class
DTS - Digital Transmission Systemwegear MW1 Creator Mouse
Equipment Class
DTS - Digital Transmission Systemwegear MW1 2.4G Dongle
Equipment Class
DXX - Part 15 Low Power Communication Device Transmitter
Dongle
Equipment Class
DXX - Part 15 Low Power Communication Device Transmitter
Level Bridge
Equipment Class
DTS - Digital Transmission System