
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
BreezeCELL - In-building Cellular Solution for Commercial Buildings Installation, Operation & Maintenance and Testing Procedures In-building Cellular Solution for Commercial Buildings Contents BreezeCELL ii © Copyright 2011 Alvarion Ltd. All rights reserved. The material contained herein is proprietary, privileged, and confidential and owned by Alvarion or its third party licensors. No disclosure thereof shall be made to third parties without the express written permission of Alvarion Ltd. Alvarion Ltd. reserves the right to alter the equipment specifications and descriptions in this publication without prior notice. No part of this publication shall be deemed to be part of any contract or warranty unless specifically incorporated by reference into such contract or warranty. Alvarion®, BreezeCOM®, WALKair®, WALKnet®, BreezeNET®, BreezeACCESS®, BreezeMAX®, BreezeLITE®, 4Motion®, and/or other products and/or services referenced herein are either registered trademarks, trademarks or service marks of Alvarion Ltd. All other names are or may be the trademarks of their respective owners. “WiMAX Forum” is a registered trademark of the WiMAX Forum. “WiMAX,” the WiMAX Forum logo, “WiMAX Forum Certified,” and the WiMAX Forum Certified logo are trademarks of the WiMAX Forum. Limitation of Liability: (a) Alvarion shall not be liable to the purchaser or to any third party, for any loss of profits, loss of use, interruption of business or for any indirect, special, incidental, punitive or consequential damages of any kind, whether arising under breach of contract, tort (including negligence), strict liability or otherwise and whether based on this agreement or otherwise, even if advised of the possibility of such damages. (b) To the extent permitted by applicable law, in no event shall the liability for damages hereunder of Alvarion or its employees or agents exceed the purchase price paid for the product by purchaser, nor shall the aggregate liability for damages to all parties regarding any product exceed the purchase price paid for that product by that party (except in the case of a breach of a party’s confidentiality obligations). In-building Cellular Solution for Commercial Buildings Contents BreezeCELL iii Contents 1 Introduction ...................................................................................................... 1 2 The Concept ...................................................................................................... 1 3 BreezeCELL Architecture .................................................................................. 2 3.1 Typical Network .................................................................................................................... 2 3.2 Existing Cable TV Network .................................................................................................. 2 3.2.1 Frequency Limitations ....................................................................................................... 3 3.2.2 BreezeCELL Solution ......................................................................................................... 3 4 BreezeCELL Network Elements ........................................................................ 4 4.1 BreezeCELL Head End Equipment ....................................................................................... 4 4.1.1 UDC – Up Down Converter .............................................................................................. 4 4.1.2 CCD – Coax Cable Distribution ........................................................................................ 5 4.1.3 Monitoring & Control ....................................................................................................... 5 4.2 Optical Network Equipment ................................................................................................ 5 4.2.1 OCD – Optical Cable Distribution ..................................................................................... 5 4.2.2 OCN – Optical Cable Node ............................................................................................... 5 4.3 Coaxial Network Equipment ................................................................................................ 5 4.3.1 Bypass Filter - Diplexer ...................................................................................................... 6 4.3.2 Bi-directional Amplifier ..................................................................................................... 6 4.4 Remote Unit .......................................................................................................................... 6 In-building Cellular Solution for Commercial Buildings Contents BreezeCELL iv 5 Frequency Allocations ...................................................................................... 7 6 MIMO Support .................................................................................................. 7 7 Monitoring & Control ....................................................................................... 7 7.1 Monitoring Elements ............................................................................................................ 8 8 Installation Requirements and Procedures ..................................................... 8 8.1 CATV System (if applicable) ................................................................................................. 8 8.2 Headend (Equipment Room) ............................................................................................... 8 8.3 Coax Plant (if applicable) ..................................................................................................... 9 8.4 Rooms (in case of CATV plant) ............................................................................................ 9 9 Headend Equipment Installation ..................................................................... 9 9.1 Connector Information ...............…
Text truncated - open the document above for the full version.
Alvarion Ltd. 21A HaBarzel Street Tel-Aviv 69710, Israel Tel.: 972-3-645-6262 Fax: 972-3-645-6222 www.alvarion.com October 30 2011 Subject: DAS Remote Unit LKT-DASRU-US To whom it may concern We agree that our DAS overall system is a "Booster" system. We accept and understand the requirement of FCC part 22.383 With Best Regards Moti Ezra C&Q Manager
August 07, 2011 American Telecommunications Certification Body, Inc. 6731 Whittier Avenue Suite C110 McLean, VA 22101 To Whom It May Concern: QualiTech (ECI Telecom) Laboratory is authorized to act on our behalf, until otherwise notified, for applications to American Telecommunications Certification Body, Inc. (ATCB). We certify that we are not subject to denial of federal benefits that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, U.S.C. 862. Further, no party, as defined in 47 CFR 1.2002 (b) to the application is subject to denial of federal benefits, that includes FCC benefits. Thank you. Regards, Moti Ezra Certification & Qualification Department Group Manager Alvarion Ltd Signature 21 Yegia Kapayim st., POB 3665, Kiryat Arie, Petah Tikva, Israel 49130 Tel: +972-3-9250800, Fax: +972-3-9222243 21 Yegia Kapayim st., POB 3665, Kiryat Arie, Petah Tikva, Israel 49130 Tel: +972-3-9250800, Fax: +972-3-9222243
21a HaBarzel St. Tel Aviv, 69710 Israel Main Line / Fax: 972 3 645 6262 / 6222 www.alvarion.com August 07, 2011 Attn.: Reviewing Engineer Federal Communications Commission 7435 Oakland Mills Road, Columbia, MD 21046 RE: CONFIDENTIALITY REQUEST FOR < Remote Unit, FCC ID: LKT-DASRU-US> To Whom It May Concern: This letter serves as an official request for confidentiality under the FCC Rule Section 0.457 and 0.459. We have requested that the <Schematic Diagrams, Functional Description, Tune-Up procedure, technical specifications, Block diagram, BOM (Bill Of Material)> required to be submitted with this application be withheld from public review. These materials contain trade secrets and proprietary information and are not customarily released to the public. The public disclosure of this information might be harmful to the company and provide unjustified benefits to our competitors. Thank you very much. Moti Ezra Certification & Qualification Department Group Manager Alvarion Ltd Signature 21a HaBarzel St. Tel Aviv, 69710 Israel Main Line / Fax: 972 3 645 6262 / 6222 www.alvarion.com
Exhibit 9 - External Photographs Photograph No.1 Remote Unit 2308 Top view Photograph No.2 Remote Unit 2308 Bottom view Internal photographs FCC ID: LKT-DASRU-US Page 2 of 2 EMC Lab Photograph No.3 Remote Unit 2308 Right side view Photograph No.4 Remote Unit 2308 left side view
Exhibit 8 - Internal photographs Photograph No.1 Remote Unit 2308 internal view Internal photographs FCC ID: LKT-DASRU-US Page 2 of 3 EMC Lab Photograph No.2 Print side view With shielding case removed Internal photographs FCC ID: LKT-DASRU-US Page 3 of 3 EMC Lab Photograph No.3 Component side view With shielding case removed
Maximum Permissible Exposure (MPE) Calculation Reference document: 47 CFR §15.247(i) & §1.1310 Test Requirements: According to §1.1310, the criteria listed in tab. 1 shall be used to evaluate the environmental impact of human exposure to RF radiation as specified in §1.1307(b). For equipment authorization purposes the term co-location refers to simultaneously transmitting (co-transmitting) antennas located within 20cm of each other within a product. Limit 1mW/cm 2 Calculation Result*: Power Density = 0.860mW/cm2 at a sphere of 20cm. Comply Prediction for part 22 (max antenna gain for mobile operations) Maximum conducted peak power:15 dBm Highest admissible antenna gain for 850 MHz mobile operation (@20cm) where no routine evaluation is required according § 2.1091(c) for P=1.5W ERP G=10log1500mW[ERP]-15dBm +2.14 dB=18.900 dBi Prediction for part 24 (max antenna gain for mobile operations) Maximum conducted peak power:15 dBm Highest admissible antenna gain for 1900 MHz mobile operation (@20cm) where no routine evaluation is required according § 2.1091(c) and § 24.232 for P= 2W EIRP G=10log2000mW[EIRP]-15dBm =18.010 dBi In order to meet OET Bulletin 65 requirements the highest admissible antennas gain for 850 MHz & 1900 MHz bands are 17 dBi as calculate below: * Equation given in OET Bulletin 65 is used to estimate the MPE distance. S=power density, in mW/cm2 P=power input to the antenna, in mW G=numeric gain of the antenna, R= distance to the center of the antenna, in cm MPE levels at 20cm are calculated as follows: 850 Band, Worst-Case Frequency MHz MPE Distance [cm] Max. Output Power [mW] Max Antenna Gain [dBi] Power density [mW/cm2] Limit [mW/cm2] GSM850, Worst-Case 869 20 31.62 17 0.3154 0.5793 1900 Band , Worst-Case Frequency Band MHz MPE Distance [cm] Output Power [mW] Max. Antenna Gain [dBi] Power density [mW/cm2] Limit [mW/cm2] 1930 20 31.62 17 0.3154 1 Total MPEs for bands are transmitting simultaneously: 0.3154 /0.579 + 0.3154/1= 0.860 mW/cm2 < 1 mW/cm2
Electromagnetic Compatibility Test Report Test Report No: AVR 070811 Issued on: August 07, 2011 Product Name Remote Unit 2308 Tested According to FCC 47 CFR, Part 22 Tests Performed for Alvarion Ltd. 21A Habarzel street,P.O.Box 13139 Ramat Hachayal 61131 Tel Aviv, Israel Tel: 972-3- 9250800 QualiTech EMC Laboratory, ECI Telecom 30 Hasivim Street, Petah-Tikva, 49517, Israel Tel: +972-3-926 8443 Fax: +972-3-928 7490 Electrical Testing Cert # 1633.01 Test Report: AVR 070811 Date: 07.08.2011 Alvarion Ltd. Page 2 of 81 Remote Unit 2308 EMC Lab The information contained herein is the property of QualiTech, EMC Lab and is supplied without liability for errors or omissions. The copyright for this document vests in QualiTech, EMC Lab. All rights reserved. This Test Report may not be reproduced, by any method, without the written permission of the QualiTech, EMC Lab. If and when such permission is granted, the report must be reproduced only in the full format. Test Personnel Tests Performed By: ------------------------------------- Michael Shtier Sergey Kapustin Report Prepared By: ------------------------------------- Bina Talkar Report Reviewed By: ------------------------------------- Rami Nataf EMC Lab. Manager QualiTech EMC Laboratory Test Report: AVR 070811 Date: 07.08.2011 Alvarion Ltd. Page 3 of 81 Remote Unit 2308 EMC Lab Test Report details: Issued on: 07.08.2011 Assessment information: This report contains an assessment of the EUT against Electromagnetic Compatibility based upon tests carried out on the samples submitted. The results contained in this report relate only to the items tested. Manufactured products will not necessarily give identical results due to production and measurement tolerances. QualiTech, EMC Lab does not assume responsibility for any conclusion and generalization drawn from the test results with regards to other specimens or samples of type of the equipment represented by test item. The EUT was set up and exercised using the configuration, modes of operation and arrangements defined in this report only. Modifications: Modifications made to the EUT None. Modifications made to the Test Standard None. Test Report: AVR 070811 Date: 07.08.2011 Alvarion Ltd. Page 4 of 81 Remote Unit 2308 EMC Lab Summary of Compliance Status Test Spec. Clause Test Case Remarks §22.913(a)(2) & §2.1046 RF Power Output, Conducted Pass §22.355 & §2.1055 Frequency Stability Pass §22.917(b) & §2.1049 Occupied Bandwidth Pass §22.917(a) & §2.1053 Out of Band Emissions - radiated Pass §22.917(b) & §2.1051 Out of Band Emissions and Inter-modulation – Conducted Pass §22.917(b) Block Edge Emissions and Inter-modulation - conducted Pass Test Report: AVR 070811 Date: 07.08.2011 Alvarion Ltd. Page 5 of 81 Remote Unit 2308 EMC Lab Table of Contents 1. GENERAL DESCRIPTION ........................................................................................................................................................ 6 2. METHOD OF MEASUREMENTS ............................................................................................................................................. 7 2.1. Conducted RF Power Output Measurements: ........................................................................................ 7 2.2. Radiated Out of Band Emissions Measurements: .................................................................................. 8 2.3. Conducted Spurious Emissions at antenna terminal Measurements: ..................................................... 9 2.4. Occupied BW Measurements: .............................................................................................................. 10 2.5. Frequency stability measurements: ....................................................................................................... 10 3. TEST FACILITY & UNCERTAINTY OF MEASUREMENT .............................................................................................. 11 3.1. Accreditation/ Registration reference: .................................................................................................. 11 3.2. Test Facility description ....................................................................................................................... 11 4. FCC 47 CFR, PART 22: REPORT OF MEASUREMENTS AND EXAMINATIONS ........................................................ 12 4.1. RF Power Output, Conducted Measurements ...................................................................................... 12 4.2. Frequency stability................................................................................................................................ 13 4.3. Occupied Bandwidth ............................................................................................................................ 14 4.4. Out of Band Emissions, Radiated Measurements................................................................................. 29 4.5. Out of Band Emissions and Inter-modulation– Conducted Measurements .......................................... 30 4.6. Block Edge Emissions and Inter-Modulation, Conducted Measurements ........................................... 50 5. APPENDIX .................................................................................................................................................................................. 60 Test Report: AVR 070811 Date: 07.08.2011 Alvarion Ltd. Page 6 of 81 Remote Unit 2308 EMC Lab 1. General Description Description of the EUT system/test Item: Product name: Remote Unit 2308 Model: 2308 EUT Description: The Remote Unit 2308 resides in the customer's location (home, hotel-room, etc.). The purpose of the Remote Unit 2308 is taking the RF signals that propagated via the cables, convert it to the native wireless frequency and transmit it to the air inside the customer's location. The Remote Unit 2308 connects to the cable outlet and receives power from the electrical grid. The Remote Unit 2…
Text truncated - open the document above for the full version.
Electromagnetic Compatibility Test Report Test Report No: AVR 080811 Issued on: August 08, 2011 Product Name: Remote Unit 2308 Tested According to FCC 47 CFR, Part 24 Tests Performed for Alvarion Ltd. 21A Habarzel street,P.O.Box 13139 Ramat Hachayal 61131 Tel Aviv, Israel Tel: 972-3- 9250800 QualiTech EMC Laboratory, ECI Telecom 30 Hasivim Street, Petah-Tikva, 49517, Israel Tel: +972-3-926 8443 Fax: +972-3-928 7490 Electrical Testing Cert # 1633.01 Test Report: AVR 080811 Date: 08.08.2011 Alvarion Ltd. Page 2 of 81 Remote Unit 2308 EMC Lab The information contained herein is the property of QualiTech, EMC Lab and is supplied without liability for errors or omissions. The copyright for this document vests in QualiTech, EMC Lab. All rights reserved. This Test Report may not be reproduced, by any method, without the written permission of the QualiTech, EMC Lab. If and when such permission is granted, the report must be reproduced only in the full format. Test Personnel Tests Performed By: ------------------------------------- Michael Shtier Sergey Kapustin Report Prepared By: ------------------------------------- Bina Talkar Report Reviewed By: ------------------------------------- Rami Nataf EMC Lab. Manager QualiTech EMC Laboratory Test Report: AVR 080811 Date: 08.08.2011 Alvarion Ltd. Page 3 of 81 Remote Unit 2308 EMC Lab Test Report details: Issued on: 08.08.2011 Assessment information: This report contains an assessment of the EUT against Electromagnetic Compatibility based upon tests carried out on the samples submitted. The results contained in this report relate only to the items tested. Manufactured products will not necessarily give identical results due to production and measurement tolerances. QualiTech, EMC Lab does not assume responsibility for any conclusion and generalization drawn from the test results with regards to other specimens or samples of type of the equipment represented by test item. The EUT was set up and exercised using the configuration, modes of operation and arrangements defined in this report only. Modifications: Modifications made to the EUT None. Modifications made to the Test Standard None. Test Report: AVR 080811 Date: 08.08.2011 Alvarion Ltd. Page 4 of 81 Remote Unit 2308 EMC Lab Summary of Compliance Status Test Spec. Clause Test Case Remarks §24.232 (c) & §2.1046 RF Power Output, Conducted Pass §24.235 & §2.1055 Frequency Stability Pass §24.238 & §2.1049 Occupied Bandwidth Pass §24.238 & §2.1053 Out of Band Emissions - radiated Pass §24.238 & §2.1051 Out of Band Emissions and Inter-modulation – Conducted Pass §24.238 Block Edge Emissions and Inter-modulation - conducted Pass Test Report: AVR 080811 Date: 08.08.2011 Alvarion Ltd. Page 5 of 81 Remote Unit 2308 EMC Lab Table of Contents 1. GENERAL DESCRIPTION ........................................................................................................................................................ 6 2. METHOD OF MEASUREMENTS ............................................................................................................................................. 7 2.1. Conducted RF Power Output Measurements: ........................................................................................ 7 2.2. Radiated Out of Band Emissions Measurements: .................................................................................. 8 2.3. Conducted Spurious Emissions at antenna terminal Measurements: ..................................................... 9 2.4. Occupied BW Measurements: .............................................................................................................. 10 2.5. Frequency stability measurements: ....................................................................................................... 10 3. TEST FACILITY & UNCERTAINTY OF MEASUREMENT .............................................................................................. 11 3.1. Accreditation/ Registration reference: .................................................................................................. 11 3.2. Test Facility description ....................................................................................................................... 11 4. FCC 47 CFR, PART 24 REPORT OF MEASUREMENTS AND EXAMINATIONS ......................................................... 12 4.1. RF Power Output, Conducted Measurements ...................................................................................... 12 4.2. Frequency stability................................................................................................................................ 13 4.3. Occupied Bandwidth ............................................................................................................................ 14 4.4. Out of Band Emissions, Radiated Measurements................................................................................. 29 4.5. Out of Band Emissions and Inter-modulation– Conducted Measurements .......................................... 30 4.6. Block Edge Emissions and Inter-Modulation, Conducted Measurements ........................................... 50 5. APPENDIX .................................................................................................................................................................................. 60 Test Report: AVR 080811 Date: 08.08.2011 Alvarion Ltd. Page 6 of 81 Remote Unit 2308 EMC Lab 1. General Description Description of the EUT system/test Item: Product name: Remote Unit 2308 Model: 2308 EUT Description: The Remote Unit 2308 resides in the customer's location (home, hotel-room, etc.). The purpose of the Remote Unit 2308 is taking the RF signals that propagated via the cables, convert it to the native wireless frequency and transmit it to the air inside the customer's location. The Remote Unit 2308 connects to the cable outlet and receives power from the electrical grid. The Remote Unit 2308 contains …
Text truncated - open the document above for the full version.
Test Setup Photographs Radiated Measurements Photograph 1 Photograph 2 Photograph 3 Conducted measurements Photograph 4 Frequency Stability measurement Photograph 5 Frequency Stability measurement Photograph 6 Appendix C: Auxiliary Equipment
| # | Rule Parts | Frequency Range | Power Output | Emission | Tolerance |
|---|---|---|---|---|---|
| 6 | 24E | 1.93 GHz - 1.99 GHz | 31.60 mW | F9W | Amp |

Outdoor Access Point
Equipment Class
NII - Unlicensed National Information Infrastructure TX
11ac+abgnAP
Equipment Class
DTS - Digital Transmission System
Base station transceiver
Equipment Class
TNB - Licensed Non-Broadcast Station Transmitter
BreezeULTRA
Equipment Class
DTS - Digital Transmission System
BreezeMAX Extreme CPE System
Equipment Class
DTS - Digital Transmission System