
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
内部公开▲ 本文所有信息为中兴通讯股份有限公司内部信息,未经允许,不得外传 第1页,共1页 ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, Guangdong, 518057, P.R.China Date: Jun 10, 2011 To: Federal Communications Commission, Authorization & Evaluation Division, 7435 Oakland Mills Road, Columbia, MD 21046 And American Telecommunications Certification Body, Inc. 6731 Whittier Avenue Suite C110 McLean, VA 22101 To Whom It May Concern: TMC(Telecommunication Metrology Center of MII) is authorized to act on our behalf, until otherwise notified, for applications to American Telecommunications Certification Body, Inc. (ATCB). We certify that we are not subject to denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, U.S.C. 862. Further, no party, as defined in 47 CFR 1.2002 (b) to the application is subject to denial of federal benefits, that includes FCC benefits. Thank you. Sincerely yours, Royce Wang ZTE CORPORATION Tel: 0755-26770345 Fax: 0755-26770347 E-Mail: [email protected]
内部公开▲ 本文所有信息为中兴通讯股份有限公司内部信息,未经允许,不得外传 第1页,共1页 ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, Guangdong, 518057, P.R.China Date: Jun 10, 2011 Federal Communications Commission Office of Engineering and Technology Equipment Authorization Division 7345 Oakland Mills Road Columbia, Maryland 21046 Subject: Permanent Confidentiality request for FCC ID: Q78-ZTEGS319 To Whom It May Concern, Pursuant to sections 0.457 and 0.459 of CFR 47, the applicant requests permanent confidential treatment of the following information accompanying this application: - Block Diagram - Schematics - Operational Description - BOM list/Tune-Up-Procedure The above materials contain trade secrets and proprietary information not customarily released to the public. The public disclosure of these matters might be harmful to the applicant and provide unjustified benefits to its competitors. Sincerely yours, Royce Wang ZTE CORPORATION Tel: 0755-26770345 Fax: 0755-26770347 E-Mail: [email protected]
S319 external photo Battery Battery Charger Label of Charger
S319, label placement
S319 internal photos Mobile phone Disassembly Mobile phone Disassembly Mobile phone Disassembly Mobile phone Disassembly Mobile phone Disassembly
No.2011TAR255 Page 1 of 14 ©Copyright. All rights reserved by TMC Beijing. TEST REPORT No. 2011TAR255 for ZTE Corporation GSM Dual-Band Digital Mobile Phone Model Name: ZTE-G S319 FCC ID: Q78--ZTEGS319 with Hardware Version: gbwA Software Version: P108A34FM(U)B01-En-01\\ngbwA Issued Date: 2011-06-16 Note: The test results in this test report relate only to the devices specified in this report. This report shall not be reproduced except in full without the written approval of TMC Beijing. Test Laboratory: DAR accreditation (DIN EN ISO/IEC 17025): No. DGA-PL-114/01-02 FCC 2.948 Listed: No.733176 IC O.A.T.S listed: No.6629A-1 TMC Beijing, Telecommunication Metrology Center of Ministry of Industry and Information Technology No. 52, Huayuan Bei Road, Haidian District, Beijing, P. R. China 100191 Tel:+86(0)10-62304633-2678 , Fax:+86(0)10-62304633-2504 Email:[email protected]. www.emcite.com No.2011TAR255 Page 2 of 14 ©Copyright. All rights reserved by TMC Beijing. CONTENTS 1. TEST LABORATORY ............................................................................................................... 3 1.1. TESTING LOCATION ........................................................................................................... 3 1.2. TESTING ENVIRONMENT ................................................................................................... 3 1.3. PROJECT DATA ................................................................................................................... 3 1.4. SIGNATURE .......................................................................................................................... 3 2. CLIENT INFORMATION ........................................................................................................... 4 2.1. APPLICANT INFORMATION ................................................................................................ 4 2.2. MANUFACTURER INFORMATION ...................................................................................... 4 3. EQUIPMENT UNDER TEST (EUT) AND ANCILLARY EQUIPMENT (AE) ............................ 5 3.1. ABOUT EUT .......................................................................................................................... 5 3.2. INTERNAL IDENTIFICATION OF EUT USED DURING THE TEST ................................... 5 3.3. INTERNAL IDENTIFICATION OF AE USED DURING THE TEST ...................................... 5 4. REFERENCE DOCUMENTS .................................................................................................... 6 4.1. REFERENCE DOCUMENTS FOR TESTING....................................................................... 6 5. LABORATORY ENVIRONMENT .............................................................................................. 7 6. SUMMARY OF TEST RESULTS .............................................................................................. 8 7. TEST EQUIPMENTS UTILIZED ............................................................................................... 9 ANNEX A: MEASUREMENT RESULTS ....................................................................................... 10 No.2011TAR255 Page 3 of 14 ©Copyright. All rights reserved by TMC Beijing. 1. Test Laboratory 1.1. Testing Location Company Name: TMC Beijing, Telecommunication Metrology Center of MIIT Address: No 52, Huayuan beilu, Haidian District, Beijing, P. R. China Postal Code: 100191 Telephone: 00861062304633 Fax: 00861062304633 1.2. Testing Environment Normal Temperature: 15-35°C Relative Humidity: 20-75% 1.3. Project data Testing Start Date: May 24, 2011 Testing End Date: May 25, 2011 1.4. Signature Qu Pengfei (Prepared this test report) Sun Xiangqian (Reviewed this test report) Lu Bingsong Deputy Director of the laboratory (Approved this test report) No.2011TAR255 Page 4 of 14 ©Copyright. All rights reserved by TMC Beijing. 2. Client Information 2.1. Applicant Information Company Name: ZTE Corporation Address /Post: #68 Zijin Hua Road, Nanjing, Jiangsu Province, P. R. China City: Nan Jing Postal Code: 210012 Country: China Telephone: +86-25-52878232 Fax: +86-25-68897541 2.2. Manufacturer Information Company Name: ZTE Corporation Address /Post: #68 Zijin Hua Road, Nanjing, Jiangsu Province, P. R. China City: Nan Jing Postal Code: 210012 Country: China Telephone: +86-25-52878232 Fax: +86-25-68897541 No.2011TAR255 Page 5 of 14 ©Copyright. All rights reserved by TMC Beijing. 3. Equipment Under Test (EUT) and Ancillary Equipment (AE) 3.1. About EUT Description GSM Dual-Band Digital Mobile Phone Model Name ZTE-G S319 FCC ID Q78--ZTEGS319 Extreme vol. Limits 3.5VDC to 4.2VDC (nominal: 3.7VDC) Note: Components list, please refer to documents of the manufacturer; it is also included in the original test record of Telecommunication Metrology Center of MIIT of People’s Republic of China. 3.2. Internal Identification of EUT used during the test EUT ID* SN or IMEI HW Version SW Version EUT1 358530030001329 gbwA P108A34FM(U)B01-En-01\\ngbwA *EUT ID: is used to identify the test sample in the lab internally. 3.3. Internal Identification of AE used during the test AE ID* Description SN AE1 Battery 10190907281438531 AE2 Travel Adapter / AE1 Model Li3704T42P3h383857 Manufacturer ZTE Capacitance 400mAh Nominal Voltage 3.7V AE2 Model STC-A22O50I200U8-C Manufacturer RUIDE Length of cable 119.5cm *AE ID: is used to identify the test sample in the lab internally. No.2011TAR255 Page 6 of 14 ©Copyright. All rights reserved by TMC Beijing. 4. Reference Documents 4.1. Reference Documents for testing The following documents listed in this section are referred for testing. Reference Title Version FCC Part 15, Subpart B Radio frequency devices July 10, 2008 Edition ANSI C63.4 Methods of Measurement of Radio-Noise Emissions from Low-Voltage Electrical and Electronic Equipment in the Range of 9 kHz to 40 GHz 2003 No.2011TAR255 Page 7 of 14 ©Copyright. All rights reserved by TMC Beijing. 5. LABORATORY ENVIRON…
Text truncated - open the document above for the full version.
S319 FCC test setup photo 1. Radiated Spurious Emission 2. Conducted Emission(Charging) 3. Radiated Emission(Charging)
No. 52 Huayuan Bei Road, Haidian District · Beijing · China
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15B | - | - |

Home Gateway
Equipment Class
NII - Unlicensed National Information Infrastructure TX
Home Gateway
Equipment Class
JBP - Part 15 Class B Computing Device Peripheral
RichMedia Box
Equipment Class
DTS - Digital Transmission System
Home Gateway
Equipment Class
NII - Unlicensed National Information Infrastructure TX
Home Gateway
Equipment Class
NII - Unlicensed National Information Infrastructure TX