FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. ZTE Corporation/
  3. Q78-A292

Q78-A292GSM Dual-band GPRS Digital Mobile Phone

ZTE Corporation

Application Details

Equipment Class
PCE - PCS Licensed Transmitter held to ear
Date of Grant
Jun 06, 2009
Application Purpose
Original Equipment
Date of Application
Jun 04, 2009
Equipment Note
GSM Dual-band GPRS Digital Mobile Phone
Frequency Range
1850.20000000 - 1909.80000000
Company
ZTE Corporation
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗
↗

External Photos

ID Label/Location Info

↗

Internal Photos

RF Exposure Info

↗

Test Report

↗

Test Setup Photos

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

ZTE A292 GSM Dual-band GPRS Digital Mobile Phone User Manual FCC COMPLIANCE STATEMENT This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: - Reorient or relocate the receiving antenna. - Increase the separation between the equipment and receiver. - Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. Consult the dealer or an experienced radio/TV technician for help. Warning Changes or modifications made to this equipment not expressly approved by ZTE for compliance could void the user's authority to operate the equipment. Health and safety information The phone with internal antenna has been tested for compliance with FCC RF Exposure (SAR) limits and is complied with FCC RF exposure compliance requirements. Exposure to radio frequency energy Radio wave exposure and Specific Absorption Rate (SAR) information The handset is designed to comply with safely, requirements for exposure to radio waves. This requirement is based on scientific guidelines that include safety margins designed to assure the safety of all persons, regardless of age and health. The radio wave exposure guidelines employ a unit of measurement known as the Specific Absorption Rate, or SAR. Tests for SAR are conducted using a standardized method with the phone transmitting at its highest certified power level in all used frequency bands. While there may be differences between the SAR levels of various ZTE phone models, they are all designed to meet the relevant guidelines for exposure to radio waves. The SAR limit recommended is 1.6W/kg averaged over one(1) gram of tissue. The highest SAR value for this device when tested at the ear was 0.981 W/kg, and when tested at the body it was 1.35 W/kg SAR compliance for bodyworn operations is restricted to belt-clips, holsters, or similar accessories that have no metallic component in the assembly and which provide at least 1.5 cm separation between the device, including its antenna, and the users body. 5 Legal Information Copyright © 2009 ZTE CORPORATION All Rights Reserved Your mobile phone is made by ZTE CORPORATION. No part of this manual may be reproduced or transmitted in any form or by any means without prior written consent of ZTE CORPORATION. Trademarks ZTE and the ZTE logos are trademarks of ZTE CORPORATION. Notice The information in this manual is subject to change without notice. Every effort has been made in the preparation of this manual to ensure accuracy of the contents, but all statements, information, and recommendations in this manual do not constitute a warranty of any kind, expressed or implied. Please read the safety precautions carefully to ensure the correct and safe use of your mobile phone. For detailed information, refer to the section “Safety Precautions”. ZTE CORPORATION Address: ZTE Plaza, Keji Road South, Hi-tech Industrial Park, Nanshan District, Shenzhen, P. R. China 6 Postal Code: 518057 Website: http://www.zte.com.cn Release: V1.0.0 Manual number MM DD, 2009 7 LEGAL INFORMATION ................................................................... 5 SECURITY ............................................................................................. 10 SAFETY PRECAUTIONS ................................................................... 10 OPERATIONAL PRECAUTIONS ............................................................ 10 PRECAUTIONS WHILE DRIVING .......................................................... 11 PRECAUTIONS FOR MEDICAL DEVICES AND FACILITIES ................... 11 MOBILE PHONE .................................................................................. 12 PRECAUTIONS FOR POTENTIALLY EXPLOSIVE ATMOSPHERES ........ 13 PRECAUTIONS FOR ELECTRONIC DEVICES ....................................... 13 SAFETY AND GENERAL USE IN VEHICLES ......................................... 13 AIRCRAFT SAFETY ............................................................................. 14 BATTERY USE ..................................................................................... 14 LIMITATION OF LIABILITY ................................................................ 15 KEY FUNCTIONS ................................................................................. 16 8 INTERFACE ICONS ............................................................................ 18 BATTERY ............................................................................................... 18 INSTALLING THE BATTERY .................................................................. 18 REMOVING THE BATTERY ................................................................... 18 HOW TO INSERT THE SIM CARD ................................................... 19 WHAT IS A SIM CARD? ....................................................................... 19 HOW TO CHARGE THE BATTERY .................................................. 19 POWERING ON/ OFF YOUR PHONE .............................................. 20 WRITING TEXT .................................................................................... 20 HOW TO ADD PEOPLE TO YOUR CONTACTS ....................…

Text truncated - open the document above for the full version.

Cover Letter(s)

内部公开 内部公开内部公开 内部公开▲ 本文中的所有信息归中兴通讯股份有限公司所有,未经允许,不得外传 第 1 / 1 页 ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park,Nanshan District,Shenzhen, Guangdong, 518057, P.R.China Date: May 14,2009 To: Federal Communications Commission, Authorization & Evaluation Division, 7435 Oakland Mills Road, Columbia, MD 21046 And American Telecommunications Certification Body, Inc. 6731 Whittier Avenue Suite C110 McLean, VA 22101 To Whom It May Concern: TMC(Telecommunication Metrology Center of MII) is authorized to act on our behalf, until otherwise notified, for applications to American Telecommunications Certification Body, Inc. (ATCB). We certify that we are not subject to denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, U.S.C. 862. Further, no party, as defined in 47 CFR 1.2002 (b) to the application is subject to denial of federal benefits, that includes FCC benefits. Thank you. Regards, Royce Wang ZTE CORPORATION Tel :0755-26770345 Fax:0755-26770347 E-Mail:[email protected]

Cover Letter(s)

内部公开 内部公开内部公开 内部公开▲ 本文中的所有信息归中兴通讯股份有限公司所有,未经允许,不得外传 第 1 / 1 页 ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park,Nanshan District,Shenzhen, Guangdong, 518057, P.R.China Date: May 14,2009 Federal Communications Commission Office of Engineering and Technology Equipment Authorization Division 7345 Oakland Mills Road Columbia, Maryland 21046 Subject: Permanent Confidentiality request for FCC ID: Q78 Q78Q78 Q78- -- -A292 A292A292 A292 To Whom It May Concern, Pursuant to sections 0.457 and 0.459 of CFR 47, the applicant requests permanent confidential treatment of the following information accompanying this application: - Block Diagram - Schematics - Operational Description - BOM list/Tune-Up-Procedure The above materials contain trade secrets and proprietary information not customarily released to the public. The public disclosure of these matters might be harmful to the applicant and provide unjustified benefits to its competitors. Yours Sincerely, Royce Wang ZTE CORPORATION Tel :0755-26770345 Fax:0755-26770347 E-Mail :[email protected]

ID Label/Location Info

Q78-A292, FCC label placement label

RF Exposure Info

TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 86of 123 Figure 62 Z-Scan at power reference point (Body, Towards Ground, GSM 1900 GPRS(4UP), Channel 810) TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 87of 123 ANNEX D: PROBE CALIBRATION CERTIFICATE TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 88of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 89of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 90of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 91of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 92of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 93of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 94of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 95of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 96of 123 ANNEX E: D835V2 DIPOLE CALIBRATION CERTIFICATE TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 97of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 98of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 99of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 100of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 101of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 102of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 103of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 104of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 105of 123 ANNEX F: D1900V2 DIPOLE CALIBRATION CERTIFICATE TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 106of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 107of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 108of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 109of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 110of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 111of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 112of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 113of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 114of 123 ANNEX G: DAE4 CALIBRATION CERTIFICATE TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 115of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 116of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 117of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 118of 123 TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 119of 123 ANNEX H: THE EUT APPEARANCES AND TEST CONFIGURATION Picture 6: Constituents of EUT TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 120of 123 Picture 7: Left Hand Touch Cheek Position Picture 8: Left Hand Tilt 15 Degree Position TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 121of 123 Picture 9: Right Hand Touch Cheek Position Picture 10: Right Hand Tilt 15 Degree Position TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 122of 123 Picture 11: Body, The EUT display towards ground, the distance from handset to the bottom of the Phantom is 15mm) Picture 12: Body, The EUT display towards phantom, the distance from handset to the bottom of the Phantom is 15mm) TA Technology (Shanghai) Co., Ltd. Test Report No. RZA2009-0609FCC Page 123of 123 Picture 13: Body with earphone, The EUT display towards ground, the distance from handset to the bottom of the Phantom is 15mm)

Test Report

No.2009TAR068 Page1 of 60 ©Copyright. All rights reserved by TMC Beijing. TEST REPORT No. 2009TAR068 for ZTE Corporation GSM Dual-band GPRS Digital Mobile Phone Model Name: ZTE A292 with Hardware Version: g7tA Software Version: SE-PE-TM8-P103B13V1.0.0 Issued Date: Jun 3th, 2009 Note: The test results in this test report relate only to the devices specified in this report. This report shall not be reproduced except in full without the written approval of TMC Beijing. Test Laboratory: DAR accreditation (DIN EN ISO/IEC 17025): No. DAT-P-114/01-01 FCC 2.948 Listed: No.733176 IC O.A.T.S listed: No.6629A-1 TMC Beijing, Telecommunication Metrology Center of Ministry of Industry and Information Technology No. 52, Huayuan Bei Road, Haidian District, Beijing, P. R. China 100083. Tel:+86(0)10-62303288-2105, Fax:+86(0)10-62304793 Email:[email protected]. www.emcite.com No.2009TAR068 Page2 of 60 ©Copyright. All rights reserved by TMC Beijing. CONTENTS 1. TEST LABORATORY .............................................................................................................. 3 1.1. TESTING LOCATION .......................................................................................................... 3 1.2. TESTING ENVIRONMENT .................................................................................................. 3 1.3. PROJECT DATA .................................................................................................................. 3 1.4. SIGNATURE ........................................................................................................................ 3 2. CLIENT INFORMATION .......................................................................................................... 4 2.1. APPLICANT INFORMATION............................................................................................... 4 2.2. MANUFACTURER INFORMATION ..................................................................................... 4 3. EQUIPMENT UNDER TEST (EUT) AND ANCILLARY EQUIPMENT (AE) ............................ 5 3.1. ABOUT EUT ........................................................................................................................ 5 3.2. INTERNAL IDENTIFICATION OF EUT USED DURING THE TEST ................................... 5 3.3. INTERNAL IDENTIFICATION OF AE USED DURING THE TEST ...................................... 5 3.4. GENERAL DESCRIPTION .................................................................................................. 6 4. REFERENCE DOCUMENTS .................................................................................................. 6 4.1. REFERENCE DOCUMENTS FOR TESTING ...................................................................... 6 5. LABORATORY ENVIRONMENT ............................................................................................ 7 6. SUMMARY OF TEST RESULTS ............................................................................................. 8 7. TEST EQUIPMENTS UTILIZED .............................................................................................. 8 ANNEX A: MEASUREMENT RESULTS ........................................................................................ 9 A.1 OUTPUT POWER (§22.913(A)/§24.232(B)) ................................................................ 9 A.2 EMISSION LIMT (§2.1051/§24.238) .............................................................................. 13 A.3 CONDUCTED EMISSION (§15.107§15.207) .................................................................... 25 A.4 FREQUENCY STABILITY (§2.1055/§24.235) ................................................................ 28 A.5 OCCUPIED BANDWIDTH (§2.1049(H)(I)) ..................................................................... 30 A.6 EMISSION BANDWIDTH (§22.917(B)/§24.238(B)) ...................................................... 38 A.7 BAND EDGE COMPLIANCE (§22.917(B)/§24.238(B)) ...................................................... 46 A.8 CONDUCTED SPURIOUS EMISSION (§2.1057/§22.917/§24.238) .............................. 50 No.2009TAR068 Page3 of 60 ©Copyright. All rights reserved by TMC Beijing. 1. Test Laboratory 1.1. Testing Location Company Name: TMC Beijing, Telecommunication Metrology Center of MIIT Address: No 52, Huayuan beilu, Haidian District, Beijing,P.R.China Postal Code: 100083 Telephone: 00861062303288 Fax: 00861062304793 1.2. Testing Environment Normal Temperature: 15-35°C Relative Humidity: 20-75% 1.3. Project data Testing Start Date: May 18th,2009 Testing End Date: May 31th,2009 1.4. Signature Zi Xiaogang (Prepared this test report) Sun Xiangqian (Reviewed this test report) Lu Bingsong Deputy Director of the laboratory (Approved this test report) No.2009TAR068 Page4 of 60 ©Copyright. All rights reserved by TMC Beijing. 2. Client Information 2.1. Applicant Information Company Name: ZTE Corporation Address /Post: #68 Zijin Hua Road, Nanjing, Jiangsu Province,China City: Nanjing Postal Code: 210012 Country: China Telephone: +86-25-52870986 Fax: +86-25-52871828 2.2. Manufacturer Information Company Name: ZTE Corporation Address /Post: #68 Zijin Hua Road, Nanjing, Jiangsu Province,China City: Nanjing Postal Code: 210012 Country: China Telephone: +86-25-52870986 Fax: +86-25-52871828 No.2009TAR068 Page5 of 60 ©Copyright. All rights reserved by TMC Beijing. 3. Equipment Under Test (EUT) and Ancillary Equipment (AE) 3.1. About EUT Description GSM Dual-band GPRS Digital Mobile Phone Model Name ZTE A292 FCC ID Q78-A292 Frequency GSM 850MHz; PCS 1900MHz Antenna Internal Power supply Battery or Charger (AC Adaptor) Output power 29.01 dBm maximum ERP measured for GSM850 Extreme vol. Limits 3.5VDC to 4.2VDC (nominal: 3.7VDC) Extreme temp. Tolerance -30°C to +50°C Note: Photographs of EUT are shown in ANNEX A of this test report. Components list, please refer to documents of the manufacturer; it is also included in the original test record of Telecommunication Metr…

Text truncated - open the document above for the full version.

Contact Information

Applicant

Cary Kong(Product Certification Manager)
[email protected]0086-755-26777740Fax: 0086-755-26770347

Technical Contact

Telecommunications Metrology Center of MIITSteven Song
[email protected]+86-62303288

100083 No 52, Huayuanbei Road, Haidian District · Beijing · China

Test Firm

TMC-Telecommunication Metrology Center of M.I.I.TChongwen Song
[email protected]0086-10-62303288Fax: 0086-10-62304793

Technical Specifications

#Rule PartsFrequency RangePower OutputEmissionTolerance
224E1.85 GHz - 1.91 GHz570.00 mW300KGXW0.1 ppm
Confidentiality
Long Term
Grant Notes
This device contains functions that are not operational in U.S. Territories. This filing is only applicable for Licensed operations. Power Output is ERP for Part 22 and EIRP for Part 24. SAR compliance for body-worn operating conditions is limited to the specific configuration tested for this filing. Body-worn operations are restricted to belt-clips, holsters or similar accessories that have no metallic component in the assembly and must provide at least 15mm separation between the device and the user�s body. End users must be informed of the body worn requirements for satisfying RF Exposure compliance. The highest reported SAR values are: Part 22: Head: 0.98W/kg; Body-worn: 1.35W/kg; Part 24: Head: 0.74W/kg; Body-worn: 0.97W/kg

Other Applications from ZTE Corporation

Home Gateway - FCC ID Q78-E1320 - ZTE Corporation
Q78-E1320

Home Gateway

Oct 06, 2022

Equipment Class

NII - Unlicensed National Information Infrastructure TX
Home Gateway - FCC ID Q78-E3330 - ZTE Corporation
Q78-E3330

Home Gateway

Sep 21, 2022

Equipment Class

JBP - Part 15 Class B Computing Device Peripheral
RichMedia Box - FCC ID Q78-ZXV10B866V2 - ZTE Corporation
Q78-ZXV10B866V2

RichMedia Box

May 23, 2021

Equipment Class

DTS - Digital Transmission System
Home Gateway - FCC ID Q78-ZXHNH298Q - ZTE Corporation
Q78-ZXHNH298Q

Home Gateway

Apr 22, 2021

Equipment Class

NII - Unlicensed National Information Infrastructure TX
Home Gateway - FCC ID Q78-ZXHNH196Q - ZTE Corporation
Q78-ZXHNH196Q

Home Gateway

Apr 19, 2021

Equipment Class

NII - Unlicensed National Information Infrastructure TX