FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. ZTE Corporation/
  3. Q78-ZTEC76

Q78-ZTEC76CDMA 1x Digital Mobile Phone

ZTE Corporation
CDMA 1x Digital Mobile Phone - FCC ID Q78-ZTEC76 - ZTE Corporation
Click to zoom

Application Details

Equipment Class
DSS - Part 15 Spread Spectrum Transmitter
Date of Grant
Jan 07, 2010
Application Purpose
Original Equipment
Date of Application
Jan 06, 2010
Equipment Note
CDMA 1x Digital Mobile Phone
Frequency Range
2402.00000000 - 2480.00000000
Company
ZTE Corporation
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

ZTE C76 CDMA 1X Digital Mobile Phone User Manual Copyright © 2009 by ZTE Corporation All rights reserved No part of this publication may be excerpted, reproduced, translated, or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without the prior written permission of ZTE Corporation. ZTE Corporation operates a policy of continuous development. ZTE Corporation reserves the right to make changes and improvements to any of the products described in this document without prior notice. Release: V1.0 Manual number: 2009.12.22 C76 User manual 3 Contents 1. For Your Safety .......................................................................... 9 General Care ......................................................................................................... 9 Aircraft Safety ...................................................................................................... 11 Hospital Safety ..................................................................................................... 12 General Guidelines .............................................................................................. 12 Road Safety ......................................................................................................... 13 Vehicles Equipped With an Air Bag ..................................................................... 14 Third Party Equipment ......................................................................................... 14 Efficient Use ......................................................................................................... 14 Radio Frequency (RF) Energy ............................................................................. 15 Emergency Services ............................................................................................ 16 FCC Notice .......................................................................................................... 16 Using Your Phone with a Hearing Aid Device ...................................................... 17 Turn on the HAC Setting ...................................................................................... 19 Copyright Notice .................................................................................................. 19 2. Introduction .............................................................................. 20 Overview .............................................................................................................. 20 What’s Included ................................................................................................... 21 C76 Technical Specifications ............................................................................... 21 Phone at a Glance ............................................................................................... 22 Key Definitions ..................................................................................................... 23 User Interface ...................................................................................................... 25 C76 User manual 4 Indicators and Icons ............................................................................................ 26 3. Set up Your Phone ................................................................... 27 Battery ................................................................................................................. 27 Install the Battery ......................................................................................... 27 Charge the Battery ...................................................................................... 28 Remove the Battery ..................................................................................... 29 Power On/Off Your Phone ................................................................................... 30 Keyguard Mode ................................................................................................... 30 Connect to the Network ....................................................................................... 30 Activate Your Phone ............................................................................................ 31 4. Basic Operations ...................................................................... 32 Make Voice Calls ................................................................................................. 32 Use the Keypad ........................................................................................... 32 Use the Contact List .................................................................................... 32 Use the Last Number Dialed ....................................................................... 32 Use a Number from the Call History ............................................................ 33 Use Speed Dial ........................................................................................... 33 Answer Voice Calls.............................................................................................. 34 In-Call Features ................................................................................................... 34 Three-Way Call .................................................................................................... 36 Call Waiting ......................................................................................................... 37 5. Entering Text ............................................................................ 38 Key Functions ...................................................................................................... 38 C76 User manual 5 Text Input Modes ................................................................................................. 40 6. Contacts .................................................................................... 42 Contact List .....................................…

Text truncated - open the document above for the full version.

Cover Letter(s)

内部公开▲ 本文所有信息为中兴通讯股份有限公司内部信息,未经允许,不得外传 第1页,共1页 ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, Guangdong, 518057, P.R.China Date: Dec 25, 2009 To: Federal Communications Commission, Authorization & Evaluation Division, 7435 Oakland Mills Road, Columbia, MD 21046 And American Telecommunications Certification Body, Inc. 6731 Whittier Avenue Suite C110 McLean, VA 22101 To Whom It May Concern: TMC(Telecommunication Metrology Center of MII) is authorized to act on our behalf, until otherwise notified, for applications to American Telecommunications Certification Body, Inc. (ATCB). We certify that we are not subject to denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, U.S.C. 862. Further, no party, as defined in 47 CFR 1.2002 (b) to the application is subject to denial of federal benefits, that includes FCC benefits. Thank you. Sincerely yours, Royce Wang ZTE CORPORATION Tel: 0755-26770345 Fax: 0755-26770347 E-Mail: [email protected]

Cover Letter(s)

内部公开▲ 本文所有信息为中兴通讯股份有限公司内部信息,未经允许,不得外传 第1页,共1页 ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, Guangdong, 518057, P.R.China Date: Dec 25, 2009 Federal Communications Commission Office of Engineering and Technology Equipment Authorization Division 7345 Oakland Mills Road Columbia, Maryland 21046 Subject: Permanent Confidentiality request for FCC ID: Q78-ZTEC76 To Whom It May Concern, Pursuant to sections 0.457 and 0.459 of CFR 47, the applicant requests permanent confidential treatment of the following information accompanying this application: - Block Diagram - Schematics - Operational Description - BOM list/Tune-Up-Procedure The above materials contain trade secrets and proprietary information not customarily released to the public. The public disclosure of these matters might be harmful to the applicant and provide unjustified benefits to its competitors. Sincerely yours, Royce Wang ZTE CORPORATION Tel: 0755-26770345 Fax: 0755-26770347 E-Mail: [email protected]

External Photos

Q78-ZTEC76 external photo Battery Battery Charger Label of Charger

ID Label/Location Info

Q78-ZTEC76, FCC label placement label

Internal Photos

Q78-ZTEC76_ internal photos Mobile phone Disassembly Mobile phone Disassembly Mobile phone Disassembly Mobile phone Disassembly Mobile phone Disassembly Mobile phone Disassembly Mobile phone Disassembly Mobile phone Disassembly Mobile phone Disassembly Mobile phone Disassembly Mobile phone Disassembly Mobile phone Disassembly

Test Report

No. 2009TAR208 Page1 of 34 ©Copyright. All rights reserved by TMC Beijing. TEST REPORT No. 2009TAR208 for ZTE Corporation CDMA 1x Digital Mogile Phone Model Name: ZTE C76 FCC ID: Q78-ZTEC76 with Hardware Version: c2rA Software Version: ZTEC76V1.0.0B04 Issued Date: 2009-12-25 No. DAT-P-114/01-01 Note: The test results in this test report relate only to the devices specified in this report. This report shall not be reproduced except in full without the written approval of TMC Beijing. Test Laboratory: TMC Beijing, Telecommunication Metrology Center of Ministry of Industry and Information Technology No. 52, Huayuan Bei Road, Haidian District, Beijing, P. R. China 100191. Tel:+86(0)10-62303288-2105, Fax:+86(0)10-62304793 Email:[email protected]. www.emcite.com No. 2009TAR208 Page2 of 34 ©Copyright. All rights reserved by TMC Beijing. CONTENTS 1. TEST LABORATORY .............................................................................................................. 4 1.1. TESTING LOCATION ............................................................................................................. 4 1.2. TESTING ENVIRONMENT ...................................................................................................... 4 1.3. PROJECT DATA ................................................................................................................... 4 1.4. SIGNATURE ........................................................................................................................ 4 2. CLIENT INFORMATION .......................................................................................................... 5 2.1. APPLICANT INFORMATION .................................................................................................... 5 2.2. MANUFACTURER INFORMATION ............................................................................................ 5 3. EQUIPMENT UNDER TEST (EUT) AND ANCILLARY EQUIPMENT (AE) ............................ 6 3.1. ABOUT EUT ....................................................................................................................... 6 3.2. INTERNAL IDENTIFICATION OF EUT USED DURING THE TEST ................................................... 6 3.3. INTERNAL IDENTIFICATION OF AE USED DURING THE TEST ..................................................... 6 4. REFERENCE DOCUMENTS .................................................................................................. 7 4.1. DOCUMENTS SUPPLIED BY APPLICANT .................................................................................. 7 4.2. REFERENCE DOCUMENTS FOR TESTING ............................................................................... 7 5. LABORATORY ENVIRONMENT ............................................................................................ 7 6. SUMMARY OF TEST RESULTS ............................................................................................. 8 6.1. SUMMARY OF TEST RESULTS .............................................................................................. 8 6.2. STATEMENTS ...................................................................................................................... 8 7. TEST EQUIPMENTS UTILIZED .............................................................................................. 9 ANNEX A: MEASUREMENT RESULTS ...................................................................................... 10 A.1. MEASUREMENT METHOD ...................................................................................................... 10 A.2. PEAK OUTPUT POWER - CONDUCTED .................................................................................... 10 A.3. FREQUENCY BAND EDGES - CONDUCTED .............................................................................. 11 A.4. CONDUCTED EMISSION......................................................................................................... 11 A.5. RADIATED EMISSION ............................................................................................................. 12 A.6. TIME OF OCCUPANCY (DWELL TIME) ...................................................................................... 13 A.7. 20DB BANDWIDTH ................................................................................................................ 13 A.8. CARRIER FREQUENCY SEPARATION ....................................................................................... 13 A.9. NUMBER OF HOPPING CHANNELS ......................................................................................... 14 A.10. AC POWERLINE CONDUCTED EMISSION .............................................................................. 14 ANNEX B: TEST FIGURE LIST ................................................................................................... 16 FIG. 1 FREQUENCY BAND EDGES: CHANNEL 0, HOPPING OFF ................................................... 16 FIG. 2 FREQUENCY BAND EDGES: CHANNEL 0, HOPPING ON .................................................... 16 FIG. 3 FREQUENCY BAND EDGES: CHANNEL 78, HOPPING OFF ................................................. 17 FIG. 4 FREQUENCY BAND EDGES: CHANNEL 78, HOPPING ON .................................................. 17 No. 2009TAR208 Page3 of 34 ©Copyright. All rights reserved by TMC Beijing. FIG. 5 CONDUCTED SPURIOUS EMISSION: CHANNEL 0,2402MHZ ............................................... 18 FIG. 6 CONDUCTED SPURIOUS EMISSION: CHANNEL 0, 30MHZ - 1GHZ ...................................... 18 FIG. 7 CONDUCTED SPURIOUS EMISSION: CHANNEL 0,1GHZ - 26GHZ ....................................... 19 FIG. 8 CONDUCTED SPURIOUS EMISSION: CHANNEL 39, 2441MHZ ............................................ 19 FIG. 9 CONDUCTED SPURIOUS EMISSION: CHANNEL 39, 30MHZ - 1GHZ .................................... 20 FIG. 10 CONDUCTED SPURIOUS EMISSION: CHANNEL 39, 1GHZ – 26GHZ .................................... 20 FIG. 11…

Text truncated - open the document above for the full version.

Test Setup Photos

Q78-ZTEC76 FCC test setup photo 1. Radiated Spurious Emission 2. Conducted Emission(Charging) 3、part15C

Contact Information

Applicant

Cary Kong(Product Certification Manager)
[email protected]0086-755-26777740Fax: 0086-755-26770347

Technical Contact

Telecommunications Metrology Center of MIITSteven Song
[email protected]+86-62303288

100083 No 52, Huayuanbei Road, Haidian District · Beijing · China

Test Firm

TMC-Telecommunication Metrology Center of M.I.I.TChongwen Song
[email protected]0086-10-62303288Fax: 0086-10-62304793

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.40 GHz - 2.48 GHz600.00 µW
Confidentiality
Long Term
Grant Notes
Power Output listed is Conducted. The antenna used for this transmitter is co-located with a Licensed radio transceiver. End-users and installers must be provided with antenna installation instructions and transmitter operating conditions for satisfying RF exposure compliance.

Other Applications from ZTE Corporation

Home Gateway - FCC ID Q78-E1320 - ZTE Corporation
Q78-E1320

Home Gateway

Oct 06, 2022

Equipment Class

NII - Unlicensed National Information Infrastructure TX
Home Gateway - FCC ID Q78-E3330 - ZTE Corporation
Q78-E3330

Home Gateway

Sep 21, 2022

Equipment Class

JBP - Part 15 Class B Computing Device Peripheral
RichMedia Box - FCC ID Q78-ZXV10B866V2 - ZTE Corporation
Q78-ZXV10B866V2

RichMedia Box

May 23, 2021

Equipment Class

DTS - Digital Transmission System
Home Gateway - FCC ID Q78-ZXHNH298Q - ZTE Corporation
Q78-ZXHNH298Q

Home Gateway

Apr 22, 2021

Equipment Class

NII - Unlicensed National Information Infrastructure TX
Home Gateway - FCC ID Q78-ZXHNH196Q - ZTE Corporation
Q78-ZXHNH196Q

Home Gateway

Apr 19, 2021

Equipment Class

NII - Unlicensed National Information Infrastructure TX