FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. ZTE Corporation/
  3. Q78-ZXCBTS192T

Q78-ZXCBTS192TCDMA Micro Base Transceiver Station

ZTE Corporation
CDMA Micro Base Transceiver Station - FCC ID Q78-ZXCBTS192T - ZTE Corporation
Click to zoom

Application Details

Equipment Class
PCB - PCS Licensed Transmitter
Date of Grant
May 24, 2005
Application Purpose
Original Equipment
Date of Application
May 24, 2005
Equipment Note
CDMA Micro Base Transceiver Station
Frequency Range
1971.25000000 - 1988.75000000
Company
ZTE Corporation
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗

External Photos

↗

ID Label/Location Info

↗
↗

Internal Photos

↗

RF Exposure Info

Test Report

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

ZXCBTS (V5.4) CDMA Micro Base Transceiver Station & RF Remote Station Installation Manual ZTE CORPORATION ZXCBTS (V5.4) CDMA Micro Base Transceiver Station/RF Remote Station Installation Manual Manual Version 20050422-R1.1 Product Version V5.4 Copyright © 2004 ZTE Corporation All rights reserved. No part of this documentation may be excerpted, reproduced, translated, annotated or duplicated, in any form or by any means without the prior written permission of ZTE Corporation. * * * * ZTE CORPORATION ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, P.R.China Website: http://www.zte.com.cn Postcode: 518057 Customer Support Center: (+86755) 26771900 800-9830-9830 Fax: (+86755) 26770801 Email: [email protected] * * * * S.N.: sjzl20030272 FAX+86-755-26770160 Suggestions and Feedback To improve the quality of ZTE product documentation and offer better services to our customers, we hope you can give us your suggestions and comments on our documentation and fax this form to +86-755-26770160; or mail to “Marketing center 3 rd floor ZTE Plaza, Keji Road South, Hi-Tech Industrial Park, Nanshan District, Shenzhen, P. R. China”. Our postcode is 518057. Document name ZXCBTS (V5.4) CDMA Micro Base Transceiver Station/RF Remote Stations Installation Manual Product version V5.4 Document version 20050422-R1.1 Equipment installation time Your information Name Company Postcode Company address Telephone E-mail Presentation: How is information presented? (Introductions, procedures, illustrations, others) F Good F Fair F Average F Poor F Bad Accessibility: Can you find the information you want? (Table of contents, Index, headings, numbering, others) F Good F Fair F Average F Poor F Bad Your evaluation of this documentation Intelligibility: Can you understand it when you find it? (Language, vocabulary, readability, others) F Good F Fair F Average F Poor F Bad Presentation: Accessibility: Your suggestions for improvement of this documentation Intelligibility: Your other suggestions on ZTE product documentation Preface About This Manual This manual presents the hardware installation procedures of ZXCBTS micro base transceiver stations (BTSs)/remote stations. It is one of ZTE manual series for CDMA cellular mobile communications system. It aims to providing guidance to the engineering personnel who install ZTE CDMA micro-BTS/remote stations, as well as offering reference for the equipment maintenance personnel. Correct hardware installation is the basis for reliable and normal running of the base transceiver stations, thus enjoying importance in engineering construction. To facilitate the installation, this manual is written following the sequence of actual hardware installation. First, it briefs the structure of the ZXCBTS products, which is helpful for the installation personnel to get familiar with the equipment. Next, it describes the equipment installation procedures in detail. Finally, it presents how to check the equipment after the installation. How to Use This Manual 1. Overview Introduces the basic structure, basic installation procedures and points for attention during installation of the micro-BTS/remote stations. 2. Preparations Introduces the preparations for the installation, including listing needed tools and checking the installation environment. 3. Open-box Inspection Introduces the procedures and cautions for opening boxes and inspecting the equipment. 4. Installation of Cabinet Details the fixation and installation of the cabinet of the equipment. 5. Installation of Power Supply System Details the installation of the power supply system of the equipment. 6. Installation of Grounding System Details the installation of the grounding system of the equipment. 7. Connection of Cables Details the check of internal cable connections between various modules, as well as type selection and connection of external cables. 8. Installation of Primary Antenna Feeder System Details the installation of the antenna feeder system of the equipment, including the procedures of assembling feeder cable connectors, installing antenna, laying feeder cables, installing feeder cable window and grounding equipment. 9. Installation of GPS antenna feeder system Details the installation of GPS antenna feeder system for the equipment, including the procedures of assembling feeder cable connectors and installing antenna. 10. Installation of Internal Modules Details the installation of internal modules. 11. Hardware Installation Check Presents how to check the hardware installation. 12. Power-on and Power-off Presents the procedures of powering on/off the equipment. 13. Appendix Presents the equipment performance specifications, meaning of various indicators and connection of cables. Conventions 1. Notational Convention Angular brackets “< >” identify names of keys and buttons, and the information typed by an operator from a terminal. Square brackets “[ ]” indicate a man-machine interface, menu item, data list or field name. The symbol “→” separates a multi-level menu, for example, [File→New→Folder] indicates the [Folder] menu item under the [New] submenu of the menu [File]. 2. Keyboard Operation Convention Format Description <Key> Indicate a key or button name, for example, <Enter>, <Tab>, <Backspace>, and <a>. <Key1+Key2> Press Key 1 and Key 2 at the same time. <key1, Key2> Press Key1 first. Then release Key 1 and press Key 2. 3. Mouse Operation Convention Format Description Click Refers to clicking the primary mouse button (usually the left mouse button) once Double-click Refers to quickly clicking the primary mouse button (usually the left mouse button) twice Right-click Refers to clicking the secondary mouse button (usually the right mouse button) once. Drag Refers to pressing and holding a mouse button and move the mouse 4. Danger, Warning, Caution and Note Statements Note, Caution, Wa r n i n g , Danger statements are used throughout this manual to emphasize important and critical informat…

Text truncated - open the document above for the full version.

Cover Letter(s)

中兴通讯股份有限公司 Z T EC O R P O R A T I O N 地址(Add):深圳市高新技术产业园科技南路中兴通讯 A 座 电话(Tel): +86-755-26770000 传真:+86-755-2677999 邮编( Postcode ): 518057 网址: http : // www.zte.com.cn 电子邮件:E-mail: [email protected] FCC Confidential Authorization Date: 2005-04-30 FEDERAL COMMUNICATIONS COMMISSIONS Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Confidentiality Request regarding application for certification of FCC ID: (Q78-ZXCBTS192T) . Pursuant to Sections 0.457 and 0.459 of the Commission’s Rules, we hereby request confidential treatment of information accompanying this application as outlined below: (Antenna Information, BOM, Technical Specification, Schematics, Block Diagram, Circuit Description, Turn up procedure) The above materials contain trade secrets and proprietary information not customarily released to the public. The public disclosure of these materials may be harmful to the applicant and provide unjustified benefits to its competitors. The applicant understands that pursuant to Section 0.457 of the Rules, disclosure of this application and all accompanying documentation will not be made before the date of the Grant for this application. Sincerely Yours, Signature: Typed or Printed Name: Royce Wang Title: Product Certification Director Company Name: ZTE Corporation

External Photos

External Photos Model number: ZXCBTS M192T EUT-Front View EUT-Back View EUT-Left Side View EUT-Right Side View EUT-Bottom View Model number: ZXCBTS R192T EUT-Front View EUT-Back View EUT-Left Side View EUT-Right Side View EUT-Bottom View

ID Label/Location Info

ID Label/Location Label Location Information Specifications: Text is Black or white in color and is left justified. Labels are printed in indelible ink on permanent adhesive backing or silk-screened onto the EUT or shall be affixed at a conspicuous location on the EUT. Label Location

ID Label/Location Info

ID Label Label Industry Canada Industrie Canada IC: 5200A-192T FCC ID: Q78-ZXCBTS192T Industry Canada Industrie Canada IC: 5200A-192T FCC ID: Q78-ZXCBTS192T

Internal Photos

Page 1 of 27 Internal Photos Page 2 of 27 EUT-Open View: ZXCBTS M192T ZXCBTS R192T Page 3 of 27 EUT- Inside View ZXCBTS M192T Page 4 of 27 ZXCBTS R192T EUT-MPA Amplifier View ZXCBTS M192T, ZXCBTS R192T Page 5 of 27 EUT-MPA Amplifier Inside View ZXCBTS M192T, ZXCBTS R192T EUT-Micro Base Duplexer View ZXCBTS M192T, ZXCBTS R192T Page 6 of 27 EUT-Micro Base Duplexer Top View ZXCBTS M192T, ZXCBTS R192T EUT-CDMA Filter (MDIV) Top View ZXCBTS M192T, ZXCBTS R192T Page 7 of 27 EUT-CDMA Filter (MDIV) Bottom View ZXCBTS M192T, ZXCBTS R192T EUT-CDMA Filter (MDIV) Label View ZXCBTS M192T, ZXCBTS R192T Page 8 of 27 EUT-BDM PCB Top View ZXCBTS M192T EUT- BDM PCB Bottom View ZXCBTS M192T Page 9 of 27 EUT-MTPB1 PCB Top View ZXCBTS M192T EUT-MTPB1 PCB Bottom View ZXCBTS M192T Page 10 of 27 EUT-MTPB3 PCB Top View ZXCBTS M192T EUT-MTPB3 PCB Bottom View ZXCBTS M192T Page 11 of 27 E U T- O I M P C B To p Vi e w ZXCBTS M192T EUT-OIM PCB Bottom View ZXCBTS M192T Page 12 of 27 EUT-RFM PCB Top View ZXCBTS R192T EUT-RFM PCB Bottom View ZXCBTS R192T Page 13 of 27 EUT-RFCM PCB Top View ZXCBTS M192T, ZXCBTS R192T EUT-RFCM PCB Bottom View ZXCBTS M192T, ZXCBTS R192T Page 14 of 27 EUT-RX PCB Top View ZXCBTS M192T, ZXCBTS R192T EUT-RX PCB Bottom View ZXCBTS M192T, ZXCBTS R192T Page 15 of 27 EUT-FS PCB Top View ZXCBTS M192T, ZXCBTS R192T EUT- FS PCB Bottom View ZXCBTS M192T, ZXCBTS R192T Page 16 of 27 EUT-TX PCB Top View ZXCBTS M192T, ZXCBTS R192T EUT-TX PCB Bottom View ZXCBTS M192T, ZXCBTS R192T Page 17 of 27 EUT-IQ PCB Top View (1) ZXCBTS M192T, ZXCBTS R192T EUT-IQ PCB Bottom View (1) ZXCBTS M192T, ZXCBTS R192T Page 18 of 27 EUT-IQ PCB Top View (2) ZXCBTS M192T, ZXCBTS R192T EUT-IQ PCB Bottom View (2) ZXCBTS M192T, ZXCBTS R192T Page 19 of 27 EUT-MLNA View ZXCBTS M192T, ZXCBTS R192T E U T- M L N A To p Vi e w ZXCBTS M192T, ZXCBTS R192T Page 20 of 27 EUT-MGPSTM Unit Top View ZXCBTS M192T EUT -MGPSTM PCB Top View ZXCBTS M192T Page 21 of 27 EUT -MGPSTM PCB Bottom View ZXCBTS M192T EUT- MGPSTM (GPSMC) Top View ZXCBTS M192T Page 22 of 27 E U T- M G P S T M ( C a r d ) To p Vi e w ZXCBTS M192T EUT- MGPSTM (Card) Bottom View ZXCBTS M192T Page 23 of 27 EUT-Power Unit View ZXCBTS M192T, ZXCBTS R192T EUT-Power PCB Top View ZXCBTS M192T, ZXCBTS R192T Page 24 of 27 EUT-Power PCB Bottom View ZXCBTS M192T, ZXCBTS R192T EUT-Power (DC-DC BRFS) PCB Top View ZXCBTS M192T, ZXCBTS R192T Page 25 of 27 EUT-Power (DC-DC BRFS) PCB Bottom View ZXCBTS M192T, ZXCBTS R192T EUT-EMI Filter Unit View ZXCBTS M192T, ZXCBTS R192T Page 26 of 27 EUT-Surge Protector Unit View ZXCBTS M192T, ZXCBTS R192T EUT-Coaxial Surge Protector Unit View ZXCBTS M192T Page 27 of 27

Test Report

Note: The test report is specially limited to the above company and this particular sample only. It may not be duplicated without prior written consent of Bay Area Compliance Lab Corp. (ShenZhen). This report must not be used by the client to claim product certification, approval, or endorsement by NVLAP, NIST or any agency of the US Government. FCC PART 24 TYPE APPROVAL EMI MEASUREMENT AND TEST REPORT For ZTE Corporation ZTE Plaza, Hi-tech Park, Nanshan District, Shenzhen, Guangdong, China FCC ID: Q78-ZXCBTS192T April 29, 2005 This Report Concerns: Original Report Equipment Type: CDMA Micro Base Transceiver Station Test Engineer: Sam Lin Report No.: RSZ05032302 Test Date: March 28-April 1, 2005 Reviewed By: Chris Zeng Prepared By: Bay Area Compliance Lab Corp. (ShenZhen) 6/F, the 3rd Phase of WanLi Industrial Building, ShiHua Road, FuTian Free Trade Zone, ShenZhen, Guangdong 518038, P.R.China Tel: +86-755-33320018 Fax: +86-755-33320008 ZTE Corporation FCC ID: Q78-ZXCBTS192T Report # S05050210a Page 2 of 51 FCC PART 24 TYPE APPROVAL Report TABLE OF CONTENTS GENERAL INFORMATION.......................................................................................................................................4 PRODUCT DESCRIPTION FOR EQUIPMENT UNDER TEST (EUT) ....................................................................................4 OBJECTIVE...................................................................................................................................................................5 RELATED SUBMITTAL(S)/GRANT(S).............................................................................................................................5 TEST METHODOLOGY..................................................................................................................................................5 TEST FACILITY.............................................................................................................................................................5 EXTERNAL I/O CABLE.................................................................................................................................................5 SYSTEM TEST CONFIGURATION ..........................................................................................................................6 DESCRIPTION OF TEST CONFIGURATION......................................................................................................................6 EQUIPMENT MODIFICATIONS.......................................................................................................................................6 CONFIGURATION OF TEST SETUP.................................................................................................................................7 BLOCK DIAGRAM OF TEST SETUP................................................................................................................................7 SUMMARY OF TEST RESULTS ...............................................................................................................................8 §15.107 (a)- CONDUCTED EMISSION......................................................................................................................9 MEASUREMENT UNCERTAINTY....................................................................................................................................9 EUT SETUP..................................................................................................................................................................9 TEST RECEIVER SETUP...............................................................................................................................................10 TEST EQUIPMENT LIST AND DETAILS.........................................................................................................................10 TEST PROCEDURE......................................................................................................................................................10 TEST DATA................................................................................................................................................................10 §2.1046, §24.232- CONDUCTED OUTPUT POWER..............................................................................................19 STANDARD APPLICABLE............................................................................................................................................19 TEST EQUIPMENT LIST AND DETAILS.........................................................................................................................19 TEST PROCEDURE......................................................................................................................................................19 §2.1047- MODULATION CHARACTERISTIC ......................................................................................................22 STANDARD APPLICABLE............................................................................................................................................22 TEST EQUIPMENT LIST AND DETAILS.........................................................................................................................22 TEST PROCEDURE......................................................................................................................................................22 TEST DATA................................................................................................................................................................22 §15.109(a)- RADIATED EMISSION .........................................................................................................................25 MEASUREMENT UNCERTAINTY..................................................................................................................................25 EUT …

Text truncated - open the document above for the full version.

Contact Information

Applicant

Cary Kong(Product Certification Manager)
[email protected]0086-755-26777740Fax: 0086-755-26770347

Test Firm

Bay Area Compliance Laboratory Corp. (Shenzhen)John Chan
[email protected]08675533320018Fax: 08675533320008

Technical Specifications

#Rule PartsFrequency RangePower OutputEmissionTolerance
124E1.97 GHz - 1.99 GHz20 W1M25G1D1.5000000000 ppm
Confidentiality
Long Term
Grant Notes
The power listed is conductive. The antenna(s) used for this transmitter must be fixed-mounted on outdoor permanent structures. RF exposure compliance is adressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of 1.1307(b)(3)

Other Applications from ZTE Corporation

Home Gateway - FCC ID Q78-E1320 - ZTE Corporation
Q78-E1320

Home Gateway

Oct 06, 2022

Equipment Class

NII - Unlicensed National Information Infrastructure TX
Home Gateway - FCC ID Q78-E3330 - ZTE Corporation
Q78-E3330

Home Gateway

Sep 21, 2022

Equipment Class

JBP - Part 15 Class B Computing Device Peripheral
RichMedia Box - FCC ID Q78-ZXV10B866V2 - ZTE Corporation
Q78-ZXV10B866V2

RichMedia Box

May 23, 2021

Equipment Class

DTS - Digital Transmission System
Home Gateway - FCC ID Q78-ZXHNH298Q - ZTE Corporation
Q78-ZXHNH298Q

Home Gateway

Apr 22, 2021

Equipment Class

NII - Unlicensed National Information Infrastructure TX
Home Gateway - FCC ID Q78-ZXHNH196Q - ZTE Corporation
Q78-ZXHNH196Q

Home Gateway

Apr 19, 2021

Equipment Class

NII - Unlicensed National Information Infrastructure TX