
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
DWC-100 Ver: DWC-100/EN-1210-2.0 Operation Manual Wireless Door/Window Contact The DWC-100 is a Door/Window Contact that can be installed on doors, windows, and any other objects that open and close. The sensor transmits signals to the control panel when a magnet mounted near the sensor is moved away. External input for wired accessory is available at the N/C interface. The tamper protection ensures that sabotage attempts to move the contact will result in an alarm activation. Features Appearance TransmitterMagnet LED indicator LED Indication LED flashes once: Door/window is opened and transmitter sends signal to the control panel. A A 1 . 5 V L R 6 PCB Layout Tamper switch Zone setup Installation & Notice Open the case and remove the battery activation strip. Mount the sensor on the door frame and the magnet on the door. Make sure the magnet is on the right side of the transmitter Place the transmitter in the desired location, mount the magnet no more than 1cm away from the transmitter and secure the transmitter and magnet with double-sided tapes or screws. Avoid mounting sensors in areas with a large quantity of metal or electrical wiring, such as a furnace or utility room. Specifications -10°C~55°C 71 x 34 x 17.5mm 51 x 12 x 13.5mm DC 1.5V (AA 1.5V LR6 Battery x 1pc) ≤ 30uA ≤ 40mA Power supply Static current Alarm current Transmitting distance Radio frequency Housing material ABS plastic Operating temperature Transmitter dimensions (LxWxH) Magnet dimensions (LxWxH) Relative humidity ≤80% (non-condensing) ≤80m (in open area) FCC Statement 315.8599MHz 1. This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation. 2. Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment.
Chuango Security Technology Co., Ltd. December 25, 2012 To: SIEMIC, INC. 775 Montague Expressway Milpitas , CA 95035 USA Dear Sir/Madam, Re: Project and Product Certification Representative Authorization Letter We, ______ Chuango Security Technology Co., Ltd. ___hereby authorize SIEMIC, INC. to act as a Certification Body for certifying for the following project(s): Product Description: Door/Window Contact Model name: DWC-100 FCC ID: RJYD100 We affirm that between SIEMIC and __ Chuango Security Technology Co., Ltd. ___, any difference in understanding, including test plan, measurement methods, applicable standards and relevant procedures and processes have been resolved prior to commencement of testing activities. Sincerely, Client’s signature: Client’s name / title: Ken Li / CEO Contact information / address: 6-17, Overseas Students Pioneer Park, No. 108, Jia Economic & Technological Development Zone, Fuzhou 350015, China
SCS-F19: Confidentiality Request Letter Page 1 of 1 Rev 2.0 Chuango Security Technology Co., Ltd. December 25, 2012 To: Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD Confidentiality Request regarding application for certification of FCC ID: RJYD100 We hereby request confidential treatment of information accompanying this application as outlined below: - Block Diagram - Operational Description - Schematic The above materials contain trade secrets and proprietary information not customarily released to the public. The public disclosure of these materials may be harmful to the applicant and provide unjustified benefits to its competitors. The applicant understands that pursuant to Section 0.457 & 0.459 of the Rules, disclosure of this application and all accompanying documentation will not be made before the date of the Grant for this application. Sincerely, Client’s signature: Client’s name / title: Ken Li / CEO Contact information / address: 6-17, Overseas Students Pioneer Park, No. 108, Jia Economic & Technological Development Zone, Fuzhou 350015, China
FCC Certification label Sample FCC ID: RJYD100 This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation.
FCC Certification Label Location Sample Label location
Antenna
Page 1 of 32 FCC ID: RJYD100 ACCURATE TECHNOLOGY CO., LTD REPORT NO. ATE20122855 APPLICATION CERTIFICATION On Behalf of Chuango Security Technology Co., Ltd. Door/Window Contact Model No.: DWC-100 FCC ID: RJYD100 Prepared for : Chuango Security Technology Co., Ltd. Address : 6-17, Overseas Students Pioneer Park, No. 108, Jia Economic & Technological Development Zone, Fuzhou 350015, China Prepared by : ACCURATE TECHNOLOGY CO., LTD Address : F1, Bldg. A, Changyuan New Material Port, Keyuan Rd. Science & Industry Park, Nanshan, Shenzhen, Guangdong P.R. China Tel: (0755) 26503290 Fax: (0755) 26503396 Report Number : ATE20122855 Date of Test : December 20-29, 2012 Date of Report : December 29, 2012 Page 2 of 32 FCC ID: RJYD100 ACCURATE TECHNOLOGY CO., LTD REPORT NO. ATE20122855 TABLE OF CONTENTS Description Page Test Report Certification 1. GENERAL INFORMATION .......................................................................................................... 4 1.1. Description of Device (EUT)....................................................................................................................4 1.2. Description of Test Facility ......................................................................................................................5 1.3. Measurement Uncertainty.........................................................................................................................5 2. MEASURING DEVICE AND TEST EQUIPMENT ..................................................................... 6 3. SUMMARY OF TEST RESULTS................................................................................................... 7 4. THE FIELD STRENGTH OF RADIATION EMISSION ............................................................ 8 4.1. Block Diagram of Test Setup....................................................................................................................8 4.2. The Field Strength of Radiation Emission Measurement Limits..............................................................9 4.3. Configuration of EUT on Measurement ...................................................................................................9 4.4. Operating Condition of EUT ....................................................................................................................9 4.5. Test Procedure ........................................................................................................................................10 4.6. The Field Strength of Radiation Emission Measurement Results ..........................................................11 5. 20DB OCCUPIED BANDWIDTH ................................................................................................ 13 5.1. Block Diagram of Test Setup..................................................................................................................13 5.2. The Bandwidth of Emission Limit According To FCC Part 15 Section 15.231(c) ................................13 5.3. EUT Configuration on Measurement .....................................................................................................14 5.4. Operating Condition of EUT ..................................................................................................................14 5.5. Test Procedure ........................................................................................................................................14 5.6. Measurement Result ...............................................................................................................................15 6. RELEASE TIME MEASUREMENT............................................................................................ 16 6.1. Block Diagram of Test Setup..................................................................................................................16 6.2. Release Time Measurement According To FCC Part 15 Section 15.231(a) ..........................................16 6.3. EUT Configuration on Measurement .....................................................................................................17 6.4. Operating Condition of EUT ..................................................................................................................17 6.5. Test Procedure ........................................................................................................................................17 6.6. Measurement Result ...............................................................................................................................18 7. AVERAGE FACTOR MEASUREMENT .................................................................................... 19 7.1. Block Diagram of Test Setup..................................................................................................................19 7.2. Average factor Measurement according to ANSI 63.4: 2009.................................................................19 7.3. EUT Configuration on Measurement .....................................................................................................20 7.4. Operating Condition of EUT ..................................................................................................................20 7.5. Test Procedure ........................................................................................................................................20 7.6. Measurement Result ...............................................................................................................................21 8. ANTENNA REQUIREMENT........................................................................................................ 22 8.1. The Requirement ....................................................................................................................................22 8.2. Antenna Construction ..................................................................…
Text truncated - open the document above for the full version.
Radiated emissions test < 30MHz Radiated emissions test 30MHz- 1GHz Radiated emissions test > 1GHz
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15.231 | 315.8599 MHz - 315.8599 MHz | - |

Multi-Beam IR Sensors
Equipment Class
DXX - Part 15 Low Power Communication Device Transmitter
Security Alarm System
Equipment Class
DXX - Part 15 Low Power Communication Device Transmitter
HD WiFi Camera
Equipment Class
DTS - Digital Transmission System
Pet-Immune PIR Motion Detector
Equipment Class
DSC - Part 15 Security/Remote Control Transmitter
WiFi Alarm System
Equipment Class
CYY - Communications Receiver used w/Pt 15 Transmitter