FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. SHENZHEN NEO ELECTRONICS CO.,LTD/
  3. Z52NAS-ZW05B

Z52NAS-ZW05BWired Gateway

SHENZHEN NEO ELECTRONICS CO.,LTD
Wired Gateway - FCC ID Z52NAS-ZW05B - SHENZHEN NEO ELECTRONICS CO.,LTD
Click to zoom

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Jul 21, 2024
Application Purpose
Original Equipment
Date of Application
Jul 21, 2024
Equipment Note
Wired Gateway
Frequency Range
2405.00000000 - 2480.00000000
Company
SHENZHEN NEO ELECTRONICS CO.,LTD
Country
China

Documents & Files

Select a file to view

Users Manual

↗

Attestation Statements

↗
↗

Cover Letter(s)

↗
↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗
↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

NAS-ZW05B0 Zigbee Wired Gateway User Manual Product configuration Power port Reset button Indicator Network port NAS-ZW05B0 This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to part 15 of the FCC rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: -Reorient or relocate the receiving antenna. -Increase the separation between the equipment and receiver. -Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. -Consult the dealer or an experienced radio/TV technician for help. To assure continued compliance, any changes or modifications not expressly approved by the party. Responsible for compliance could void the user’s authority to operate this equipment. (Example- use only shielded interface cables when connecting to computer or peripheral devices). This equipment complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) This device must accept any interference received, including interference that may cause undesired operation. FCC Radiation Exposure Statement: The equipment complies with FCC Radiation exposure limits set forth for uncontrolled environment. This equipment should be installed and operated with minimum distance 20cm between the radiator and your body. NAS-ZW05B0 Basic Parameters Devic e name:Zigbee Wired Gateway Product model:NAS-ZW05W6 USB power:5V/1A Working temperature:0-55 Working humidity:10%-90%RU Storage temperature: 0-55 Storage humidity:10%-90%RU Network protocol:Zigbee IEEE 802.15.4 Frequency band:2.4~2.485GHz Maximum output power: 8dBm Network topology:support star, tree, mesh network Firmware upgrade:OTA Support WAN:1 10 / 100M Ethernet ports (RJ45 Interface) LED status Device statusLED display status Configuration modeIndicator often bright ResetHold press the reset button for more than 6s N ote: 1.Please reset the device before you add it; 2.N o quantity limits to add the device. 3.The phone and gateway have to connect network with same router before adding t he dev ice; Product Function 3.1 Zigbee Gateway Support Zigbee 3.0 protocol to add Zigbee subsystem; 3.2 Network settings 1. Power on the zigbee wired gateway; NAS-ZW05B0 2. Confirm configuration indicator on; 3. Ensure your phone connect with home 2.4GHz frequency band router, meanwhile the phone and gateway are in same LAN; 4. Enter APP home page, click the button "+" in the top right corner of the page; 5. Clicks "Other" on the left side of the page to select the zigbee gateway according to the icon; 6. Access the network as per prompt; 7. Added successfully, devices can be found in the “My Home” list. Restore the factory settings: Hold Press the button (key time> 6 seconds), the distribution network indicator light becomes often bright; 3.3 Firmware upgrade Support for remote automatic upgrade and App selection upgrade; 3.4 Control panel Universal public version gateway panel; Download the APP 1.Android system:Download “Smart Life”App on Google play for free. 2.IOS system: Download “Smart Life”App on Apple store for free. 3.Launch the "Smart life" app. Register and login To register,enter your mobile phone number or email address,create a password ,then login to the app. Login if you have an account already. NAS-ZW05B0 Add Device 1. Add Tuya Gateway; pls follow user manual(distinguish between wired and wireless); 2. Add device;Please reset the zigbee device before you add it; NAS-ZW05B0 Main function, working state and record setting 1. APP main interface setting Added device Added device’s quantity Search for devices NAS-ZW05B0 Other function 1.Shared Device 2.Device offline; if the device disconnected power, you will see your device is offline on app. 3.Rename NAS-ZW05B0 4.Wipe data ; Remove device by APP, then add device again. the history will be deleted.

Attestation Statements

SHENZHEN NEO ELECTRONICS CO., LTD East6/F Building 2, Laobing industry, Baoan District ,Shenzhen, China Federal Communications Commission Authorization and Evaluation Division Equipment Authorization Branch 7435 Oakland Mills Road Columbia, MD 21046 2024-7-15 To whom it may concern: We, SHENZHEN NEO ELECTRONICS CO., LTD, hereby certify that the equipment for which authorization is sought (FCC ID: Z52NAS-ZW05B) is not “covered” equipment prohibited from receiving an equipment authorization pursuant to § 2.903 of the FCC rules. We also certify that, as of the date of the filing of the application, we are not identified on the Covered List (https://www.fcc.gov/supplychain/coveredlist) as an entity producing “covered” equipment. By signing this form, we confirm the above and that we are aware of the application requirements listed under § 2.911(b) and (d)(5) and (6). The information provided in this letter is based on the referenced rule parts of Title 47 of the CFR as well as KDB 986446 D01. Sincerely, {新申请人签名} Signature Binnv Wu Manager SHENZHEN NEO ELECTRONICS CO., LTD 62_[model] CoveredEqu_2.911(d)(5)(i) and (ii) - U, V03

Attestation Statements

SHENZHEN NEO ELECTRO N ICS CO., LTD E a s t 6 / F B u i l d i n g 2 , L a o b i n g i n d u s t r y , B a o a n D i s t r i c t , S h e n z h e n , C h i n a Federal Communrcatrons Comrnrssion Authonzatron and Evaluation Drvrsion Equrpn1ent Authonzatron Branch 7435 Oakland Mrlls Road Colurnbra. MD 21046 2024-7-6 US.Aqent Deslqnahon SHENZHEN NEO ELECTRONICS CO., LTD acknowledges their consent for the following conlact localed in the United States to act as their agent for service of process for the equipment for which aulhonzation is sought (FCC ID Z52NAS-VN05B) Name and company of U S. agent Physical U.S address of agent· FRN of U S agent Email address of U S agent NEO Technology INC 4220 Florin R0#102 Sacramento, CA 95823 United States 0033634841 [email protected] NEO Technology INC acknowledges their obligation to accept service of process on behalf of SHENZHEN NEO ELECTRONICS CO., l TD. SHENZHEN NEO ELECTRONICS CO., LTD with the FRN (0021225842) accepts its obligation to maintain an agent for service of process in the United States for no less than one year after either the grantee has permanently terminated all marketing and 1mportat1on of the applicable equipment within the U.S, or the conclusion of any Comm1ss1on-related administrative or Judicial proceeding involving the equipment. whicheve「IS later. By signing this form, we confirm the above and that we are aware of the application requirements listed under § 2 911 ( d )(7) . The info「mation provided in this letter is based on the referenced rule parts of nue 47 of the CFR as well as KOS 986446 001 An expiration date for this letter does not exist . In case the U.S. agent changes, the grantee is obligated to notify the FCC within 30 days via the granting TCB. >OJ\ · n,(LXp)二6~,u,av sn IPPCEl_8寸 Sincerely, {新申请人签名} 归 V 血 Signature Binnv Wu Manager SHENZHEN NEO ELECTRONICS CO., LTD {代理商签名} 單 哼! Signature Joise Wong CEO NEO Technology INC

Cover Letter(s)

SHENZHEN NEO ELECTRONICS CO., LTD Add: East6/F Building 2, Laobing industry, Baoan District ,Shenzhen, China Date: 2024-7-15 FCC ID: Z52NAS-ZW05B Dear Sir/Madam, We, SHENZHEN NEO ELECTRONICS CO., LTD Hereby declares the following statement for Federal Communications Commission, PCB board, circuit, structure and internal of these model(s) are the same, Only model number is different for these model: Product name: Wired Gateway Model no.: NAS-ZW05B, NAS-ZW03B Sincerely, {新申请人签名} Name/Title: Binnv Wu/Manager Company: SHENZHEN NEO ELECTRONICS CO., LTD Address: East6/F Building 2, Laobing industry, Baoan District ,Shenzhen, China Phone: (86)755-29642263 Fax: (86)755-29667746 E-Mail: [email protected]

Cover Letter(s)

CONFIDENTIALITY REQUEST for Certification Service in USA Federal Communication Commission Equipment Authorization Division, Application Processing Branch 7435 Oakland Mills Road Columbia, MD 21046 Date:<2024-7-15> Pursuant to Paragraphs §0.457 and 0.459 of the Commission’s Rules (47 C.F.R.) and Section §552(b)(4) of the Freedom of Information Act, we requests confidentiality for the following products: FCC ID Model name Z52NAS-ZW05B NAS-ZW05B For the product stated above, we request that the following information be held confidential; Exhibits Long-Term Confidentiality Short-Term Confidentiality Short-Term Confidentiality Days External Photos Internal Photos Block Diagram Schematics Test Setup Photos User’s Manual Parts List Tune Up Operational Descriptions The long-term confidentiality exhibits contain our trade secrets and proprietary information that could be of benefit to our competitors. The short-term confidentiality on the basis of ensuring that business sensitive information remains confidential until the actual marketing of our new device. If you have any questions, please feel free to contact me at the address shown below. Sincerely, {新申请人签名} Name/Title: Binnv Wu/Manager Company: SHENZHEN NEO ELECTRONICS CO., LTD Address: East6/F Building 2, Laobing industry, Baoan District ,Shenzhen, China Phone: (86)755-29642263 Fax: (86)755-29667746 E-Mail: [email protected]

Cover Letter(s)

SHENZHEN NEO ELECTRONICS CO., LTD East6/F Building 2, Laobing industry, Baoan District ,Shenzhen, China Federal Communications Commission Authorization and Evaluation Division Equipment Authorization Branch 7435 Oakland Mills Road Columbia, MD 21046 2024-7-15 To whom it may concern: We, the undersigned, hereby authorize Eurofins Product Service GmbH to act on our behalf in all matters relating to applications for equipment authorization FCC ID: Z52NAS-ZW05B including the signing of all documents related to these matters. Any and all acts carried out by Eurofins Product Service GmbH on our behalf shall have the same effect as acts of our own. By signing this application form, we agree to Eurofins’ current valid General Terms and Conditions (AGB),Testing and Certification Regulations (PZO) which can be viewed on following website www.eurofins.de/ee or retrieved on request. We also hereby certify that no party to this application is subject to a denial of benefits, including FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 862. Sincerely, {新申请人签名} Name/Title: Binnv Wu/Manager Company: SHENZHEN NEO ELECTRONICS CO., LTD Address: East6/F Building 2, Laobing industry, Baoan District ,Shenzhen, China Phone: (86)755-29642263 Fax: (86)755-29667746 E-Mail: [email protected]

External Photos

FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Appendix III EUT External Photographs Photo 1 Appearance of EUT Photo 2 Appearance of EUT FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Photo 3 Appearance of EUT Photo 4 Appearance of EUT FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Photo 5 Appearance of EUT

ID Label/Location Info

FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Appendix I Label Appendix II Label Location FCC ID: Z52NAS-ZW05B Model: NAS-ZW05B

Internal Photos

FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Appendix IV EUT Internal Photographs Photo 6 Internal of EUT Photo 7 Internal of EUT ZigBee Antenna FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Photo 8 Appearance of PCB Photo 9 Appearance of PCB

RF Exposure Info

Shenzhen Toby Technology Co., Ltd. Report No.: TBR-C-202406-0134-1 Page: 1 of 3 TB-RF-074-1.0 1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China Tel: +86 75526509301 Fax: +86 75526509195 Maximum Permissible Exposure Evaluation FCC ID: Z52NAS-ZW05B 1. Client Information Applicant : SHENZHEN NEO ELECTRONICS CO., LTD Address : East6/F Building 2, Laobing industry, Baoan District ,Shenzhen, China Manufacturer : SHENZHEN NEO ELECTRONICS CO., LTD Address : East6/F Building 2, Laobing industry, Baoan District ,Shenzhen, China 2. General Description of EUT EUT Name : Wired Gateway Models No. : NAS-ZW05B, NAS-ZW03B Model Different : All these models are identical in the same PCB, layout and electrical circuit, The only difference is model name, brand name and product name. Brand Name : NEO Sample ID : HC-C-202406-0134-01-02 Product Description : Operation Frequency: ZigBee: 2405MHz~2480MHz Power Rating : USB Input:5V1A Software Version : N/A Hardware Version : NAS-ZW05B0 V2 20211104 Remark : The antenna gain provided by the manufacturer, the verified for the RF conduction test provided by TOBY test lab. Report No.: TBR-C-202406-0134-1 Page: 2 of 3 TB-RF-074-1.0 Method of Measurement for FCC 1. Max. Antenna Gain: Mode Antenna Type Antenna Gain(dBi) ZigBee PIFA 1.08 2. EUT Operation Condition: Software provided by client enabled the EUT to transmit and receive data at lowest, middle and highest channel individually. 3. Exposure Evaluation: Equation from page 18 of OET Bulletin 65, Edition 97-01 S=(PG)/4πR 2 Where S: power density P: power input to the antenna G: power gain of the antenna in the direction of interest relative to an isotropic radiator. R: distance to the center of radiation of the antenna Simultaneous transmission MPE Considerations According to KDB447498: All transmitters and antennas in the host must be either evaluated for MPE compliance, by measurement or computational modeling, or qualify for the standalone MPE test exclusion in section 7.1. Simultaneous transmission MPE test exclusion applies when the sum of the MPE ratios for all simultaneous transmitting antennas incorporated in a host device, based on the calculated/estimated, numerically modeled or measured field strengths or power density, is ≤ 1.0. This means that: ∑ of MPE ratios ≤ 1.0 Report No.: TBR-C-202406-0134-1 Page: 3 of 3 TB-RF-074-1.0 4. Test Result: Worst MPE Result Test Mode Frequency (MHz) Conducted Power(max) (dBm) Turn- up Power (dB) Max tune up power (dBm) [P] Max. ANT Gain (dBi) [G] Distance (cm) [R] Power Density (mW/ cm 2 ) [S] ZigBee 2405 8.033 8±1 9 1.08 20 0.00203 2440 7.872 8±1 9 1.08 20 0.00203 2480 8.202 8±1 9 1.08 20 0.00203 Note: The antenna gain used max. antenna gain 5. Conclusion: As specified in Table 1B of 47 CFR 1.1310- Limits for Maximum Permissible Exposure (MPE), Limits for General Population/ Uncontrolled Exposure Frequency Range (MHz) Power density (mW/ cm 2 ) 300-1,500 F/1500 1,500-100,000 1.0 For: 2402~2480MHz MPE limit S: 1mW/ cm 2 The MPE is calculated as 0.00203mW / cm 2 < limit 1mW / cm 2 . So, RF exposure limit warning or SAR test are not required. The EUT will only be used with a separation of 20cm or greater between the antenna and nearby persons and can therefore be considered a mobile transmitter per 47 CFR2.1091 (b). The RF Exposure Information page from the manual is included here for reference. -----END OF REPORT-----

Test Report

Shenzhen Kangyuan new communication technology Co., LTD Antenna test report Shenzhen Kangyuan new communication technology Co., LTD 邮箱:[email protected] 电话:0755-2941-1200 传真:0755-2941-1200 Customer NEO Project Name FCC Customer NO. N/A specification 2.4GHz Antenna Supplier NO. NAS-ZW05B Frequency 2400-2500Mhz Material of Plastic PIFA Antenna Polarization Linear Impedance 50 Ohm REV. Ver.1 20240601 Date 2024.06.01 客户确认CUSTOMER APPROVED BY 批准Approved by 审核Checked by 制表Prepared by 供方确认SUPPLIER APPROVED BY 批准Approved by 审核Checked by 制表Prepared by Anker zhou Copper.Liu 王保钦 Shenzhen Kangyuan new communication technology Co., LTD 1、Antenna placement 2、Test Equipment & Condition 3、Antenna passive parameter Gain & Efficiency 4、3D Pattern 5、VSWR 6、 Mechanical instruction Shenzhen Kangyuan new communication technology Co., LTD Antenna placement Shenzhen Kangyuan new communication technology Co., LTD Test Equipment & Condition Network Analyzers : KEYSIGHT P5002A Communications Test Set: R&S CMW500 Shenzhen Kangyuan new communication technology Co., LTD 2.4G--Gain & Efficiency Frequency Efficiency Gain(dbi) 2400 -6.91.08 2410 -7.4 1.02 2420 -7.80.7 2430 -7.80.6 2440 -80.39 2450 -8.20.21 2460 -8.4-0.1 2470 -8.6-0.3 2480 -8.7-0.9 2490 -9-1.6 2500 -7.91.08 Shenzhen Kangyuan new communication technology Co., LTD 3D Pattern Shenzhen Kangyuan new communication technology Co., LTD VSWR Shenzhen Kangyuan new communication technology Co., LTD Mechanical instruction .....END OF REPORT...

Test Report

Shenzhen Toby Technology Co., Ltd. Http://www.tobylab.cn Add:1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China. Report No.: TBR-C-202406-0134-2 Page: 1 of 27 FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 RF Test Data for ZigBee (Conducted Measurements) General Description of EUT Product Name: Wired Gateway Test Model: NAS-ZW05B Sample ID: HC-C-202406-0134-01-02 Environmental Conditions Temperature: 24.6°C Relative Humidity: 52.3% Test Voltage: DC 5V Test Engineer: Jolin Lee Note: For a more detailed features description, please refer to the report TBR-C-202406-0134-2 The report only show the worst case data. Shenzhen Toby Technology Co., Ltd. Http://www.tobylab.cn Add:1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China. Report No.: TBR-C-202406-0134-2 Page: 2 of 27 FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Contents 1. Duty Cycle ........................................................................................................................................................................................... 3 2. Maximum Conducted Output Power ................................................................................................................................................. 6 3. -6dB Bandwidth .................................................................................................................................................................................. 9 4. Occupied Channel Bandwidth ......................................................................................................................................................... 12 5. Maximum Power Spectral Density Level ......................................................................................................................................... 15 6. Band Edge ........................................................................................................................................................................................ 18 7. Conducted RF Spurious Emission .................................................................................................................................................. 21 8. Restrict Band .................................................................................................................................................................................... 25 Shenzhen Toby Technology Co., Ltd. Http://www.tobylab.cn Add:1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China. Report No.: TBR-C-202406-0134-2 Page: 3 of 27 FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 1. Duty Cycle Condition Mode Frequency (MHz) Antenna Duty Cycle (%) Correction Factor (dB) 1/T (kHz) NVNT ZigBee 2405 Ant1 32.55 4.87 1.2 NVNT ZigBee 2440 Ant1 32.55 4.87 1.2 NVNT ZigBee 2480 Ant1 53.55 2.71 1.2 Shenzhen Toby Technology Co., Ltd. Http://www.tobylab.cn Add:1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China. Report No.: TBR-C-202406-0134-2 Page: 4 of 27 FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Test Graphs Duty Cycle NVNT ZigBee 2405MHz Ant1 Duty Cycle NVNT ZigBee 2440MHz Ant1 Shenzhen Toby Technology Co., Ltd. Http://www.tobylab.cn Add:1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China. Report No.: TBR-C-202406-0134-2 Page: 5 of 27 FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Duty Cycle NVNT ZigBee 2480MHz Ant1 Shenzhen Toby Technology Co., Ltd. Http://www.tobylab.cn Add:1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China. Report No.: TBR-C-202406-0134-2 Page: 6 of 27 FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 2. Maximum Conducted Output Power Condition Mode Frequency (MHz) Antenna Conducted Power (dBm) Duty Factor (dB) Total Power (dBm) Limit (dBm) Verdict NVNT ZigBee 2405 Ant1 8.033 0 8.033 30 Pass NVNT ZigBee 2440 Ant1 7.872 0 7.872 30 Pass NVNT ZigBee 2480 Ant1 8.202 0 8.202 30 Pass Shenzhen Toby Technology Co., Ltd. Http://www.tobylab.cn Add:1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China. Report No.: TBR-C-202406-0134-2 Page: 7 of 27 FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Test Graphs Power NVNT ZigBee 2405MHz Ant1 Power NVNT ZigBee 2440MHz Ant1 Shenzhen Toby Technology Co., Ltd. Http://www.tobylab.cn Add:1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China. Report No.: TBR-C-202406-0134-2 Page: 8 of 27 FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Power NVNT ZigBee 2480MHz Ant1 Shenzhen Toby Technology Co., Ltd. Http://www.tobylab.cn Add:1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China. Report No.: TBR-C-202406-0134-2 Page: 9 of 27 FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 3. -6dB Bandwidth Condition Mode Frequency (MHz) Antenna -6 dB Bandwidth (MHz) Limit -6 dB Bandwidth (MHz) Verdict NVNT ZigBee 2405 Ant1 1.53 0.5 Pass NVNT ZigBee 2440 Ant1 1.61 0.5 Pass NVNT ZigBee 2480 Ant1 1.58 0.5 Pass Shenzhen Toby Technology Co., Ltd. Http://www.tobylab.cn Add:1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China. Report No.: TBR-C-202406-0134-2 Page: 10 of 27 FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Test Graphs -6dB Bandwidth NVNT ZigBee 2405MHz Ant1 -6dB Bandwidth NVNT ZigBee 2440MHz Ant1 Shenzhen Toby Technology Co., Ltd. Http://www.tobylab.cn Add:1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China. Report No.: TBR-C-202406-0134-2 Page: 11 of 27 FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 -6dB Bandwidth NVNT ZigBee 2480MHz Ant1 Shenzhen Toby Technology Co., Ltd. Http://www.tobylab.cn Add:1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China. Report No.: TBR-C-202…

Text truncated - open the document above for the full version.

Test Report

Shenzhen Toby Technology Co., Ltd. Report No.: TBR-C-202406-0134-2 Page: 1 of 32 TB-RF-074-1.0 1/F.,Building 6, Rundongsheng Industrial Zone, Longzhu, Xixiang, Bao'an District, Shenzhen, Guangdong, China Tel: +86 75526509301 Fax: +86 75526509195 Radio Test Report FCC ID: Z52NAS-ZW05B Report No. : TBR-C-202406-0134-2 Applicant : SHENZHEN NEO ELECTRONICS CO., LTD Equipment Under Test (EUT) EUT Name : Wired Gateway Model No. : NAS-ZW05B Series Model No. : NAS-ZW03B Brand Name : NEO Sample ID : HC-C-202406-0134-01-01&HC-C-202406-0134-01-02 Receipt Date : 2024-06-25 Test Date : 2024-06-25 to 2024-07-04 Issue Date : 2024-07-04 Standards : FCC Part 15 Subpart C 15.247 Test Method : ANSI C63.10: 2013 KDB 558074 D01 15.247 Meas Guidance v05r02 Conclusions : PASS In the configuration tested, the EUT complied with the standards specified above. Test By : Jolin Lee Reviewed By : Henry Huang Approved By : Ivan Su This report details the results of the testing carried out on one sample. The results contained in this test report do not relate to other samples of the same product. The manufacturer should ensure that all products in series production are in conformity with the product sample detailed in the report. Report No.: TBR-C-202406-0134-2 Page: 2 of 32 TB-RF-074-1.0 Contents CONTENTS ............................................................................................................................................ 2 1. GENERAL INFORMATION ABOUT EUT ............................................................................. 5 1.1 Client Information ................................................................................................................ 5 1.2 General Description of EUT (Equipment Under Test) ................................................... 5 1.3 Block Diagram Showing the Configuration of System Tested ...................................... 6 1.4 Description of Support Units .............................................................................................. 7 1.5 Description of Test Mode ................................................................................................... 7 1.6 Description of Test Software Setting ................................................................................ 8 1.7 Measurement Uncertainty .................................................................................................. 8 1.8 Test Facility........................................................................................................................... 9 2. TEST SUMMARY..................................................................................................................... 10 3. TEST SOFTWARE .................................................................................................................. 10 4. TEST EQUIPMENT AND TEST SITE .................................................................................. 11 5. CONDUCTED EMISSION ...................................................................................................... 13 5.1 Test Standard and Limit ................................................................................................... 13 5.2 Test Setup........................................................................................................................... 13 5.3 Test Procedure .................................................................................................................. 13 5.4 Deviation From Test Standard......................................................................................... 14 5.5 EUT Operating Mode ........................................................................................................ 14 5.6 Test Data............................................................................................................................. 14 6. RADIATED AND CONDUCTED UNWANTED EMISSIONS ............................................ 15 6.1 Test Standard and Limit ................................................................................................... 15 6.2 Test Setup........................................................................................................................... 16 6.3 Test Procedure .................................................................................................................. 17 6.4 Deviation From Test Standard......................................................................................... 18 6.5 EUT Operating Mode ........................................................................................................ 18 6.6 Test Data............................................................................................................................. 18 7. RESTRICTED BANDS AND BAND EDGE REQUIREMENT .......................................... 19 7.1 Test Standard and Limit ................................................................................................... 19 7.2 Test Setup........................................................................................................................... 19 7.3 Test Procedure .................................................................................................................. 20 7.4 Deviation From Test Standard......................................................................................... 20 7.5 EUT Operating Mode ........................................................................................................ 20 7.6 Test Data............................................................................................................................. 20 8. BANDWIDTH TEST................................................................................................................. 21 8.1 Test Standard and Limit ................................................................................................... 21 8.2 Test Setup.........................................…

Text truncated - open the document above for the full version.

Test Setup Photos

FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Appendix V EUT Test Photographs Photo of Setup for Conducted Emission(AC POWER) Photo of Setup for Radiated Emission (30MHz~1GHz) FCC ID: Z52NAS-ZW05B TB-RF-074-1.0 Photo of Setup for Radiated Emission (Above 1 GHz) -----END OF REPORT-----

Contact Information

Applicant

Wu Binnv(Manager)
[email protected]755-29642263Fax: 755-29667746

Test Firm

Shenzhen Toby Technology Co., Ltd.Ray Lai
[email protected]---

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.40 GHz - 2.48 GHz6.60 mW
Confidentiality
Long Term
Grant Notes
Output Power listed is peak conducted. RF exposure compliance is addressed for 1.1310 and 2.1091 MPE limits. The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 20 cm from all persons. End Users must be provided with transmitter operation conditions for satisfying RF exposure compliance.

Other Applications from SHENZHEN NEO ELECTRONICS CO.,LTD

Water Valve - FCC ID Z52NAS-WV03B2 - SHENZHEN NEO ELECTRONICS CO.,LTD
Z52NAS-WV03B2

Water Valve

Sep 26, 2023

Equipment Class

DTS - Digital Transmission System
Water Valve - FCC ID Z52NAS-WV02W9 - SHENZHEN NEO ELECTRONICS CO.,LTD
Z52NAS-WV02W9

Water Valve

Dec 01, 2022

Equipment Class

DTS - Digital Transmission System
Smart plug - FCC ID Z52NAS-WR12Z1U - SHENZHEN NEO ELECTRONICS CO.,LTD
Z52NAS-WR12Z1U

Smart plug

Aug 11, 2021

Equipment Class

DXX - Part 15 Low Power Communication Device Transmitter
Motion sensor - FCC ID Z52NAS-PD07Z1U - SHENZHEN NEO ELECTRONICS CO.,LTD
Z52NAS-PD07Z1U

Motion sensor

Aug 10, 2021

Equipment Class

DXX - Part 15 Low Power Communication Device Transmitter
Door Sensor - FCC ID Z52NAS-DS07Z1U - SHENZHEN NEO ELECTRONICS CO.,LTD
Z52NAS-DS07Z1U

Door Sensor

May 31, 2020

Equipment Class

DXX - Part 15 Low Power Communication Device Transmitter