Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
ShenzhenBaseusTechnologyCo.,Ltd. 2ndFloor,BuildingB,BaseusIntelligencePark,No.2008,XuegangRd,GangtouCommunity,BantianStreet,Longgang District,Shenzhen,China AttestationStatements NotCoveredEntityApplicant&NotCoveredEquipment To:FederalCommunicationsCommissionDate:Dec.17,2025 7435OaklandMillsRoad, Columbia,MD21046,USA Ref:InformationRequiredbySection2.911(d)(5)(i)&(ii) FCCID:2A482-E00290 FRN:0032035966 ShenzhenBaseusTechnologyCo.,Ltd.(“theapplicant”)certifiesthat,asofthedateofthefilingofthe application,theapplicantisnotidentifiedontheCoveredList,establishedpursuantto§1.50002of referencechapter,asanentityproducing“covered”communicationequipment.Theequipmentfor whichauthorizationissoughtisnot“covered”telecommunicationsequipmentandvideosurveillance equipmentproducedbyentitiesidentifiedontheCommission’sCoveredListthatprohibitedfrom receivinganequipmentauthorizationpursuanttosection§2.903oftheFCCrules. Sincerelyyours, ApplicantSignature PrintedName:TiffanyLuo Title:CertifiedEngineer Address:2ndFloor,BuildingB,BaseusIntelligencePark,No.2008,XuegangRd,GangtouCommunity, BantianStreet,LonggangDistrict,Shenzhen,China Tel.:+86-13480668369 Email:[email protected]
Shenzhen Baseus Technology Co., Ltd. 2nd Floor, Building B, Baseus Intelligence Park, No.2008, Xuegang Rd, Gangtou Community, Bantian Street, Longgang District, Shenzhen, China 1 | P a g e Attestation Statements To: Federal Communications Commission Date: Dec. 17, 2025 7435 Oakland Mills Road, Columbia, MD 21046, USA Subject: Attestation of Compliance with FCC Covered List Software Requirements FCC ID: 2A482-E00290 Product Name: Power Bank This letter serves as an attestation that the equipment identified above ☐ is / ☒ is not (select one) "covered" software as defined under the Federal Communications Commission (FCC) Covered List requirements, as outlined in FCC 22-84 and KDB 986446. Specifically, the undersigned certifies that the equipment for which authorization is sought: 1. Does not contain cybersecurity or anti-virus software produced or provided by Kaspersky Lab, Inc. or any of its successors, assignees, parents, subsidiaries, affiliates, or any entity that has rebranded or relabeled software produced by the aforementioned entities. 2. Does not have the capability to store, run, or deliver any software identified on the FCC Covered List, including but not limited to cybersecurity and anti-virus software. To support this attestation, the appendix evaluation documentation has been prepared and is included in the certification filing. This attestation is based on a thorough evaluation of the device's design, functionality, and software environment. The undersigned affirms that the information provided is accurate and complete to the best of their knowledge. Sincerely yours, Applicant Signature Printed Name: Tiffany Luo Title: Manager Address: 2nd Floor, Building B, Baseus Intelligence Park, No.2008, Xuegang Rd, Gangtou Community, Bantian Street, Longgang District, Shenzhen, China Tel.: +86-13480668369 Email: [email protected] Shenzhen Baseus Technology Co., Ltd. 2nd Floor, Building B, Baseus Intelligence Park, No.2008, Xuegang Rd, Gangtou Community, Bantian Street, Longgang District, Shenzhen, China 2 | P a g e Evaluation regarding to the Covered List Software: Compliance Methodology Evaluation Process Results Device is Inherent compliance ☒ The Chipset(s) used is limited to run the Cybersecurity or anti-virus software. Compliance ☐ The Memory used is limited to run the Cybersecurity or anti-virus software. Compliance ☐ There is storage capacity limitation for store or install the Cybersecurity or anti-virus software. Compliance ☐ Operating system used is limited to run, install or deliver the Cybersecurity or anti-virus software. Compliance Device is not Inherent compliance ☐ Evaluation Based on Software Bill of Materials (SBoM) See attached “SBoM“ Note:The SBoM content is limited to the scope of covered list software (e.g. antivirus and cybersecurity software). ☐ Evaluation Based on Scan for Software on the device ☐ Evaluation Based on Filesystem scan ☐ Evaluation Based on Running software check
ShenzhenBaseusTechnologyCo.,Ltd. 2ndFloor,BuildingB,BaseusIntelligencePark,No.2008,XuegangRd,GangtouCommunity, BantianStreet,LonggangDistrict,Shenzhen,China Date:Dec.17,2025 FederalCommunicationsCommission AuthorizationandEvaluationDivision 7435OaklandMillsRoad Columbia,MD21046 FCCID:2A482-E00290 USAgent–AttestationStatement/Part2.911(d)(7) [ShenzhenBaseusTechnologyCo.,Ltd.]certifies,thatasof[ Dec.17,2025 ],wehavedesignatedFCCUSAgent, LLCtoacceptserviceofprocessonourbehalfforFCCID:2A482-E00290. [ShenzhenBaseusTechnologyCo.,Ltd.],acceptstomaintainanagentofserviceofprocessintheUnitedStatesforno lessthanoneyearaftereitherthegranteehaspermanentlyterminatedallmarketingandimportationoftheapplicable equipmentwithintheU.S.,ortheconclusionofanyCommission-relatedadministrativeorjudicialproceedinginvolving theequipment,whicheverislater. FCCUSAgent,LLC,acceptsasofthedateofthefilingofthisapplication,theobligationofbeingthedesignatedagent forthepurposeofacceptingserviceofprocessonbehalfof[ShenzhenBaseusTechnologyCo.,Ltd.]for FCCID:2A482-E00290. DesignatedAgentInformation: CompanyName:FCCUSAgent,LLC FRN:0033402884 Address:3722IllinoisAvenue,SaintCharles,IL,60174,USA ContactPerson:TimPayne Phone:708-571-3148 Email:[email protected] Sincerely, Company:[ShenzhenBaseusTechnologyCo., Ltd.] DesignatedAgent:FCCUSAgent,LLC CompanyRepresentative:[TiffanyLuo] Tel:+86-13480668369 Email:[email protected] FRN:0032035966 DesignatedAgentRepresentative:TimPayne Signature:Signature:
ShenzhenBaseusTechnologyCo.,Ltd. 2ndFloor,BuildingB,BaseusIntelligencePark,No.2008,XuegangRd,GangtouCommunity,BantianStreet, LonggangDistrict,Shenzhen,China OfficeofEngineeringTechnology FederalCommunicationsCommission 7435OaklandMillsRoad Columbia,MD21046 USA Date:Dec.17,2025 Subject;RequestforConfidentiality FCCID:2A482-E00290 ToWhomItMayConcern, PursuanttotheprovisionsoftheCommission’srulesTitle47Sections§0.457and§0.459,we arerequestingtheCommissiontowithholdthefollowingattachment(s)asconfidential documentsfrompublicdisclosureindefinitely. Thesedocumentscontaindetailedsystemandequipmentdescriptionsandareconsideredas proprietaryinformationinoperationoftheequipment.Thepublicdisclosureofthesedocuments mightbeharmfultoourcompanyandwouldgivecompetitorsanunfairadvantageinthemarket. SchematicDiagram BlockDiagram OperationalDescription Inadditionaltoabovementioneddocuments,inordertocomplywiththemarketingregulations inTitle47CFR§2.803andtheimportationrulesinTitle47CFR§2.1204,whileensuringthat businesssensitiveinformationremainsconfidentialuntiltheactualmarketingofnewly authorizeddevices,werequestShortTermConfidentialityofthefollowingattachment(s); ExternalPhotos TestSetupPhotos InternalPhotos UserManual For45days,pursuanttoPublicNoticeDA04-1705. OR For180dayspursuanttoKDB726920D01. Itisourunderstandingthatallmeasurementtestreports,FCCIDlabelformatand correspondenceduringthecertificationreviewprocesscannotbegrantedasconfidential documentsandthisinformationwillbeavailableforpublicreviewoncethegrantofequipment authorizationisissued. Sincerely Contactperson:TiffanyLuo
Shenzhen Baseus Technology Co., Ltd. 2nd Floor, Building B, Baseus Intelligence Park, No.2008, Xuegang Rd, Gangtou Community, Bantian Street, Longgang District, Shenzhen, China (Dec. 17, 2025) Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Subject: Agent Authorization for FCC ID: 2A482-E00290 I, the undersigned, hereby authorize (Attestation of Global Compliance (Shenzhen) Co., Ltd) to act on our behalf in all matters relating to this application for equipment certification. Any act carried out by (Attestation of Global Compliance (Shenzhen) Co., Ltd) shall have the same effect as our own and I acknowledge that all responsibility for complying with the terms and conditions of certification, as specified by DERYCOM CERTIFICATION SERVICES, INC., still resides with (Shenzhen Baseus Technology Co., Ltd.). We certify that we are not subject to a denial of federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. §862, and that no party to the application, as defined in 47 CFR §1.2002(b), is subject to a denial of federal benefits that includes FCC benefits pursuant to that section. Sincerely, (Signature) Printed Name: Tiffany Luo Title: Certified Engineer Tel.: +86-13480668369 Email: [email protected]
张洁佩 PG3 OS+CN-PicoGo AM52 卡片磁吸移动电源 Qi2.2 USB-C版 10000mAh 45W 2025.11.25 1、logo3、功率字符 4、灯显 8、无线标识 V2.3 颜色:星原钛 比主体色浅40% 工艺:CNC钻孔 工艺:丝印(丝印效果参考AM41) 颜色:星原钛 比主体色浅40% 颜色:星原钛 比主体色浅40% 星云粉 比主体色深40% 星际黑 比主体色深40% 2、开关字符 颜色:星原钛 工艺:模刻 星云粉 星际黑 5、闪电标 颜色:星原钛 工艺:模刻亮面 星云粉 星际黑 6、线扣处理 颜色:星原钛 工艺:模刻亮面(前端亮面,主体哑面) 星云粉 星际黑 工艺:丝印(丝印效果参考AM41) 星云粉 比主体色深40% 星际黑 比主体色深40% 工艺:丝印 星云粉 比主体色深40% 星际黑 比主体色深40% 位置居中 6.5mm 位置居中 位置居中 边缘亮面 哑面火花纹 5.8mm 8.4mm 1.87mm 位置对齐 居中 6.5mm 2mm
Page 1 of 21 RF Exposure Report Report No.: AGC11758251009FH01 FCC ID : 2A482-E00290 APPLICATION PURPOSE : Original Equipment PRODUCT DESIGNATION : Power Bank BRAND NAME : baseus MODEL NAME : E00290 APPLICANT : Shenzhen Baseus Technology Co., Ltd. DATE OF ISSUE : Nov. 26, 2025 STANDARD(S) : 47 CFR FCC Part 2.1091 47 CFR FCC Part 2.1093 KDB 680106 D01 v04 REPORT VERSION : V1.0 Attestation of Global Compliance (Shenzhen) Co., Ltd Report No.: AGC11758251009FH01 Page 2 of 21 Report Revise Record Report Version Revise Time Issued Date Valid Version Notes V1.0 / Nov. 26, 2025 Valid Initial Release Report No.: AGC11758251009FH01 Page 3 of 21 Table of Contents 1. General Information ........................................................................................................................................ 4 2. Product Information ........................................................................................................................................ 5 2.1 Product Technical Description ................................................................................................................... 5 2.2 DUT Coil and Size Information ................................................................................................................. 6 2.3 Related Submittal(S)/Grant (S) ................................................................................................................. 7 2.4 Test Methodology ...................................................................................................................................... 7 2.5 Equipment Approval Considerations ......................................................................................................... 7 3. Test Environment ............................................................................................................................................ 8 3.1 Address of The Test Laboratory ................................................................................................................ 8 3.2 Test Facility ................................................................................................................................................ 8 3.3 Environmental Conditions ......................................................................................................................... 9 3.4 Measurement Uncertainty ......................................................................................................................... 9 3.5 List of Equipment Used ............................................................................................................................. 9 4.System Test Configuration ............................................................................................................................ 10 4.1 Configuration of Tested System .............................................................................................................. 10 4.2 Equipment Used in Tested System ........................................................................................................ 10 5. Description of Test Modes ........................................................................................................................... 11 6. Maximum Permissible Exposure ................................................................................................................. 12 6.1 Test Limits ............................................................................................................................................... 12 6.2 Test Setup (Block Diagram of Configuration).......................................................................................... 13 6.3 Test Procedures ...................................................................................................................................... 15 6.4 Test Result ............................................................................................................................................... 17 Appendix I: Photographs of Test Setup .......................................................................................................... 20 Appendix II: Photographs of Test EUT ........................................................................................................... 20 Report No.: AGC11758251009FH01 Page 4 of 21 1. General Information Applicant Shenzhen Baseus Technology Co., Ltd. Address 2nd Floor, Building B, Baseus Intelligence Park, No.2008, Xuegang Rd, Gangtou Community, Bantian Street, Longgang District, Shenzhen, China Manufacturer Shenzhen Baseus Technology Co., Ltd. Address 2nd Floor, Building B, Baseus Intelligence Park, No.2008, Xuegang Rd, Gangtou Community, Bantian Street, Longgang District, Shenzhen, China Factory Shenzhen Pilot Technology Co., Ltd. Address (A1 Industrial Park)A1 Factory 101, No.7 Shankeng Road, Shanxia Community, Pinghu Subdistrict Longgang District, Shenzhen, Guangdong, China Product Designation Power Bank Brand Name baseus Test Model E00290 Series Model(s) N/A Difference Description N/A Date of receipt of test item Oct. 17, 2025 Date of Test Oct. 17, 2025 to Nov. 26, 2025 Deviation from Standard No any deviation from the test method Condition of Test Sample Normal Test Result Pass Test Report Form No AGCER-FCC-RFE-V1 Note: The test results of this report relate only to the tested sample identified in this report. Prepared By Jack Gui (Project Engineer) Nov. 26, 2025 Reviewed By Bibo Zhang (Reviewer) Nov. 26, 2025 Approved By Angela Li (Authorized Officer) Nov. 26, 2025 Report No.: AGC11758251009FH01 Page 5 of 21 2. Product Information 2.1 Product Technical Description Operation Frequency Band 110.5kHz-148.5kHz; 360kHz±5kHz Hardware Version V1.0 Software Version v1.0 Modulation Type ASK Antenna Designation Coil Antenna Input Rating USB-C/USB-C Cable Input: 5V⎓3A; 9V⎓3A; 12⎓2.5A; 15V⎓2A by adapter or DC 3.6V by battery Output Rating USB-C/USB-C Cable …
Text truncated - open the document above for the full version.
Page3 of 5 DongguanFANYAElectronicsCo.,LTD 东莞市泛亚电子有限公司TEL:0769-22490287FAX:0769-22499451FY-GZ001 SPECIFICATION 産品型號: DESC FYF0332025030401 版本 Rev:A.0 客戶CUST: F033 泛亚料号FineP/N: FYF033002 客户料号CUSTP/N: 0403003-0145 一、尺寸DIMENSION:(mm) 二、原理图SCHEMATICDIAGRAM: A 23.0±0.5 B40±1 C42.4±0.4 D44±1 E2±1 F0.9±0.1 G 1.55MAX (不含离型纸) I4Max(引线间距) 注: 1.引线不交叉出线; 2.线圈反贴10层纳米晶,纳米晶尺 寸φ42.4*0.3mm,开单L槽双面背 胶,带蓝色透明离型纸,中间贴φ 20*1.0mm开槽尺寸1.5*4mm小磁 片; 3.进线引线打扁; 4.线圈正面贴φ39.5*22*0.08mm带 手撕位双面普通背胶; 5.NTC10K-3950,引线长65mm; 三、绕线参数WindingSpecification: 序号 NO. 端子 TERMINAL 线径 WIRE 圈数 Turns 绕线方向 WindingDirection 1SF Litz0.08*65p 11TsCCW 四、电气特性ELECTRICALCHARACTERISTICS: 温度TEMPERATURE:25±10°C,湿度RELATIVEHUMIDITY:65±20% 序号 NO. 项目 ITEM 端子 TERMINAL 标准 SPECIFICATION 测试条件 TESTFREQUENCY 测试仪器 TESTEQUIPMENTS 1IND.S-F 5.0uH±5%单线圈 100KHz/1.0VTH2810 2IND.S-F 8.3uH±6%加磁片 100KHz/1.0V TH2810 3DCRS-F 75mΩMax 100KHz/1.0V TH2810 擬制 / 日期 PREPAREDBY/DATE 審核 / 日期 CHECKEDBY/DATE 批准 / 日期 APPROVEDBY/DATE 李爱莲 2025/03/10 彭霆茵 2025/03/10 胡伟 2025/03/10
Page 1 of 35 FCC Test Report Report No.: AGC11758251009FR01 FCC ID : 2A482-E00290 APPLICATION PURPOSE : Original Equipment PRODUCT DESIGNATION : Power Bank BRAND NAME : baseus MODEL NAME : E00290 APPLICANT : Shenzhen Baseus Technology Co., Ltd. DATE OF ISSUE : Nov. 26, 2025 STANDARD(S) : FCC Part 15 Subpart C REPORT VERSION : V1.0 Attestation of Global Compliance (Shenzhen) Co., Ltd Report No.: AGC11758251009FR01 Page 2 of 35 Report Revise Record Report Version Revise Time Issued Date Valid Version Notes V1.0 / Nov. 26, 2025 Valid Initial Release Report No.: AGC11758251009FR01 Page 3 of 35 Table of Contents 1. General Information ........................................................................................................................................ 4 2. Product Information ........................................................................................................................................ 5 2.1 Product Technical Description ................................................................................................................... 5 2.2 Related Submittal(S) / Grant (S) ............................................................................................................... 6 2.3 Test Methodology ...................................................................................................................................... 6 2.4 Special Accessories .................................................................................................................................. 6 2.5 Equipment Modifications ........................................................................................................................... 6 2.6 Antenna Requirement................................................................................................................................ 6 3. Test Environment ............................................................................................................................................ 7 3.1 Address of The Test Laboratory ................................................................................................................ 7 3.2 Test Facility ................................................................................................................................................ 7 3.3 Environmental Conditions ......................................................................................................................... 8 3.4 Measurement Uncertainty ......................................................................................................................... 8 3.5 List of Equipment Used ............................................................................................................................. 9 4. System Test Configuration ........................................................................................................................... 10 4.1 EUT Configuration ................................................................................................................................... 10 4.2 EUT Exercise ........................................................................................................................................... 10 4.3 Configuration of Tested System .............................................................................................................. 10 4.4 Equipment Used in Tested System ......................................................................................................... 11 4.5 Summary of Test Results ........................................................................................................................ 12 5. Description of Test Modes ........................................................................................................................... 13 6. Field Strength of Fundamental .................................................................................................................... 14 6.1 Measurement Limits ................................................................................................................................ 14 6.2 Measurement Procedure ......................................................................................................................... 15 6.3 Field Strength Calculation ....................................................................................................................... 16 6.4 Measurement Setup ................................................................................................................................ 17 6.5 Measurement Result ............................................................................................................................... 18 7. -20 dB Bandwidth Measurement ................................................................................................................. 28 7.1 Provisions Applicable .............................................................................................................................. 28 7.2 Measurement Procedure ......................................................................................................................... 28 7.3 Measurement Setup ................................................................................................................................ 28 7.4 Measurement Result ............................................................................................................................... 28 8. AC Power Line Conducted Emission Test .................................................................................................. 30 8.1 Measurement Limits ................................................................................................................................ 30 8.2 Measurement Setup .....................................................................................................................…
Text truncated - open the document above for the full version.
3722 Illinois Avenue · Saint Charles, Illinois, 60174 · United States
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 0.1105 MHz - 0.1485 MHz | - |
| 2 | 15C | 0.36 MHz - 0.36 MHz | - |
Baseus True Wireless Earbuds
Equipment Class
DTS - Digital Transmission System
Power Bank
Equipment Class
DCD - Part 15 Low Power Transmitter Below 1705 kHz
Power Bank
Equipment Class
DCD - Part 15 Low Power Transmitter Below 1705 kHzBaseus Open-Ear TWS Earbuds
Equipment Class
DSS - Part 15 Spread Spectrum Transmitter
Power bank
Equipment Class
DCD - Part 15 Low Power Transmitter Below 1705 kHz