
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
Interact Pro User Manual Installation Guide Setting up a project successfully LED Lamp Signify Classified -Internal Footer (Insert > Header & Footer to edit)2 9290022767 Signify Classified -Internal Footer (Insert > Header & Footer to edit)3 Installation Process Flow Signify Classified -Internal Getting Interact Pro Live In 5 Easy Steps 4 GettingInteractProLive In 5 Easy Steps 2 GettingInteractProLive In 5 Easy Steps 2 GettingInteractProLive In 5 Easy Steps 2 Signify Classified -Internal A ‘robust’ flow from physical install to handover 5 •Set up project and first user(s) (service provider/installer) •Install and connect the gateway •Optional: Update the gateway to the latest version •Physical installation of the luminaires and/or lamps •Discover the lights •Assign the lights to groups and/or zones •Add additional users for the appropriate roles •Start ‘Project update’ •Physical installation of sensors and switches •Set up behavior by adding switches/sensors and selecting appropriate lighting behavior •Add scenes and schedules as required •Finalize setting up users and handover to the end customer Signify Classified -Internal Intermezzo: On software releases and software updates •Factory new devices firmware will typically lag the most actual software release that is available (production lead time, stock, ...) •One device with an older firmware will trigger the need for a firmware upgrade •Minimum upgrade time is at least 1 hour irrespective of the amount of lights (1..200). •The upgrade time may extend up to 4 hours (or even longer) •Current factory release is dated and limits the functionality that can be used out of the box: that will require a firmware upgrade of both gateway and lights which is a time consuming operation so it has to be planned for in the install process. •Factory gateway release does match factory lamp/luminaire devices releases for out-of-the box installs. •It will allow you to group lights and control them via the app (min. functionality). •Factory releases can always be upgraded to the latest release Factory releases will be updated but be aware that one device with a previous release will require update to be executed. 6 Signify Classified -Internal System limitations out of the box / after upgrade 7 FeatureOut of the boxAfter upgrade Limits Max lights / lamps200 / 150200 / 200 Max sensors1530 Max switches1550# Type of sensorOCCOCC, DL-OCC Light control manual on manual off** Auto on auto off** Manual on auto off** Auto on auto off with DDR* Manual on auto off with DDR* Other features Force delete* Reconnect to project after reset gateway* #Max switches equals 50 minus 'number of sensors' Signify Classified -Internal System limitations out of the box / after upgrade 8 FeatureOut of the boxAfter upgrade Limits Max lights / lamps200 / 150200 / 200 Max sensors1530 Max switches1550# Type of sensorOCCOCC, DL-OCC Light control manual on manual off** Auto on auto off** Manual on auto off** Auto on auto off with DDR* Manual on auto off with DDR* Other features Force delete* Reconnect to project after reset gateway* #Max switches equals 50 minus 'number of sensors' A gateway update to the latest version prior to discovery of lights will enable •Force delete •Reconnect to same project after reset of gateway But you will get ‘update project’ messages after finding lights As the system wants to enforce consistent versions Best to do this when all lights are accounted for Signify Classified -Internal Footer (Insert > Header & Footer to edit)9 Getting started with a project Signify Classified -Internal Get Interact Pro App on Google or Apple 10 Search for Interact Pro Signify Classified -Internal Logging in as a service provider (self registered account) Installer by invitation 11 •Method 1: By invitation •You receive an email that invites you to register •You register yourself using the interact pro portal •Log in with your email address and password Invitation is for installer, owner, or user role •Method 2: Self registration •Click the request access button in •You register yourself using the interact pro portal •Login in with the credentials created Self registration makes you a service provider Signify Classified -Internal Create your first project 12 Logging in a (new) service provider into the app: •You can review app and credentials •Create a new project You see that most functionality is blocked but if you’re an installer at a job you can proceed: Creating a new project adds installer role to your account It unlocks all app functionality You need to be an installer to proceed with commissioning So this action enables that for the first project Signify Classified -Internal Add project information 13 •The name of the project is used to identify it •Set the correct timezoneof the project! It ensures execution of schedules at the right time at all times. Also when the status of daylight savings time changes. You can change it later in the app or portal. After project creation, the commission of the system can start. Signify Classified -Internal Installing the gateway 14 •Determine location of the gateway and install it first •It requires a wired ethernet connection to work which may require cabling •Check whether the 3 lights get solid blue Rationale: Gateway needs to be connected in order to commission. •Start the app and assign by scanning QR code Execute this assignment prior to installation of the lights or power down the lights Reason: The gateway will open its network shortly to select a channel and that may result in finding a few lights. This can be a problem when you’ll find out later that the app is not connected via the cloud with the gateway Setting up the gateway at the start prevents delays when IT support is needed from the customer Signify Classified -Internal Solving connection issues 15 3 blue lights burning but the app doesn’t assign the gateway •Validate whether the app is connected to the right cloud environment installers typically don’t have demo…
Text truncated - open the document above for the full version.
Print Name: Yefeng Zhang Title: Approbation Group Manager QA-FR-170-B Company: Signify (China) Investment Co., Ltd. Add: Building no.9, Lane 888, Tianlin Road, Minhang District, Shanghai, 200233 China Tel: +86-17701755062 Fax : +86-21-54452269 E-mail: [email protected] FCC Authorization Date: 2019-09-05 FEDERAL COMMUNICATIONS COMMISSION Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Subject: Agent Authorization To whom it may concern: We , Signify (China) Investment Co., Ltd., Hereby authorizes Bay Area Compliance Laboratories Corporation to act on its behalf in all matters relating to application for Equipment authorization, including the signi ng of all documents relating to these matters. All acts carried out by Bay Area Compliance Laboratory Corporation on our behalf shall have the same effect as our own action. We, the undersigned, hereby certify that we are not subject to a denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 862. This authorization is valid until further written notice from the applicant. Sincerely Yours, Signature:
QA-FR-171-A Company: Signify (China) Investment Co., Ltd. Add: Building no.9, Lane 888, Tianlin Road, Minhang District, Shanghai, 200233 China Tel: +86-17701755062 Fax: +86-21-54452269 E-mail: [email protected] FCC Confidential Authorization Date: 2019-09-05 FEDERAL COMMUNICATIONS COMMISSIONS Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Subject: Confidentiality Request regarding application for certification of FCC ID: 2AGBW442294730771X In accordance with Sections 0.457 and 0.459 of the Commission’s Rules, Signify (China) Investment Co., Ltd. hereby requests long-term confidential treatment of information accompanying this application as outlined below: Block Diagram Schematics Operation Description The above materials contain proprietary and confidential information not customarily released to the public. The public disclosure of these materials provides unjustified benefits to its competitors in the market. Sinc erely, Signature: Printer Name: Yefeng Zhang Title:Approbation Group Manager
Company: Signify (China) Investment Co., Ltd. Add: Building no.9, Lane 888, Tianlin Road, Minhang District, Shanghai, 200233 China Tel: +86-17701755062 Fax: +86-21-54452269 E-mail: [email protected] DECLARATION Date:2019-09-05 Please contact me if there is need for any additional clarification or information. Best Regards, Signature: Contact Name: Yefeng Zhang Title: Approbation Group Manager Dear Sir or Madam: We, Signify (China) Investment Co., Ltd., hereby declare that product name: LED Lamp (model name: 9290022767, 9290022768, 9290022769, 9290022770, 9290022771, 9290022772, FCC ID: 2AGBW442294730771X). These models are electrically identical with the PCB design, components and electromagnetic compatibility characteristics, and model: 9290022767 has been tested by BACL. The differences of them ar e as follows: 1 .Model name 2. CCT(Correlated Color Temperature) 3.Light-emitting angle FEDERAL COMMUNICATIONS COMMISSION Authorization and Evaluation Division 743 5 Oakland Mills Road Columbia, MD 21046
EXHIBIT A - EUT EXTERNAL PHOTOGRAPHS EUT – Top View EUT – Bottom View EUT – Front View EUT – Rear View EUT – Left View EUT – Right View
EXHIBIT B - EUT INTERNAL PHOTOGRAPHS EUT – Cover off View EUT – PCB Top View Antenna EUT – PCB Bottom View EUT – Chip View
Bay Area Compliance Laboratories Corp. (Kunshan) Report No.: RKSB190905003-00B FCC Part 15.247 Page 11 of 37 FCC §1.1310& §2.1091 –MAXIMUM PERMISSIBLE EXPOSURE (MPE) Applicable Standard Acco rding to subpart §2.1091 and subpart §1.1310, systems operating under the provisions of this section shall be operated in a manner that ensures that the public is not exposed to radio frequency energy level in excess of the Commission’s guidelines. Limits for Maximum Permissible Exposure (MPE) (§1.1310, §2.1091) (B) Limits for General Population/Uncontrolled Exposure Frequency Range (MHz) Electric Field Strength (V/m) Magnetic Field Strength (A/m) Power Density (mW/cm 2 ) Averaging Time (minutes) 0.3-1.346141.63*(100)30 1.34-30824/f2. 19/f*(180/f²)30 30-30027.50.0730.230 300-1500//f/150030 1500-100,000//1.030 f = frequency in MHz; * = Plane-wave equivalent power density; According to §1.1310 and §2.1091 RF exposure is calculated. Calculated Formulary: Predication of MPE limit at a given distance S = PG/4πR² = power density (in appropriate units, e.g. mW/cm 2 ); P = power input to the antenna (in appropriate units, e.g., mW); G = power gain of the antenna in the direction of interest relative to an isotropic radiator, the power gain factor, is normally numeric gain; R = distance to the center of radiation of the antenna (appropriate units, e.g., cm); Calculated Data: Mode Frequency Range (MHz) Antenna Gain Tune-up Conducted Power Evaluation Distance (cm) Power Density (mW/cm 2 ) MPE Limit (mW/cm 2 ) (dBi) (numeric)(dBm)(mW) Zigbee 2405~24803.00 2.00 5.00 3.16 20 0.0013 1.0 No te: 1. The tune-up output power was declared by the manufacturer. 2. The BLE and Zigbee can't transmission simultaneously. C onclusion: T he device meets FCC MPE at 20 cm distance.
Bay Area Compliance Laboratories Corp. (Kunshan) Report No.: RKSB190905003-00A FCC Part 15.247 Page 11 of 37 FCC §1.1310 & §2.1091 – MAXIMUM PERMISSIBLE EXPOSURE (MPE) Applicable Standard According to subpart §2.1091 and subpart §1.1310, systems operating under the provisions of this section shall be operated in a manner that ensures that the public is not exposed to radio frequency energy level in excess of the Commission’s guidelines. Limits for Maximum Permissible Exposure (MPE) (§1.1310, §2.1091) (B) Limits for General Population/Uncontrolled Exposure Frequency Range (MHz) Electric Field Strength (V/m) Magnetic Field Strength (A/m) Power Density (mW/cm 2 ) Averaging Time (minutes) 0.3-1.34 614 1.63 *(100) 30 1.34-30 824/f 2.19/f *(180/f²) 30 30-300 27.5 0.073 0.2 30 300-1500 / / f/1500 30 1500-100,000 / / 1.0 30 f = frequency in MHz; * = Plane-wave equivalent power density; According to §1.1310 and §2.1091 RF exposure is calculated. Calculated Formulary: Predication of MPE limit at a given distance S = PG/4πR² = power density (in appropriate units, e.g. mW/cm 2 ); P = power input to the antenna (in appropriate units, e.g., mW); G = power gain of the antenna in the direction of interest relative to an isotropic radiator, the power gain factor, is normally numeric gain; R = distance to the center of radiation of the antenna (appropriate units, e.g., cm); Calculated Data: Mode Frequency Range (MHz) Antenna Gain Tune-up Conducted Power Evaluation Distance (cm) Power Density (mW/cm 2 ) MPE Limit (mW/cm 2 ) (dBi) (numeric) (dBm)(mW) BLE 2402~24803.00 2.00 5.00 3.16 20 0.0013 1.0 Note: 1. The tune-up output power was declared by the manufacturer. 2. The BLE and Zigbee can't transmission simultaneously. Conclusion: T he device meets FCC MPE at 20 cm distance.
Note: This test report is prepared for the customer shown above and for the device described herein. It may not be duplicated or used in part without prior written consent from Bay Area Compliance Laboratories Corp. This report is valid only with a valid digital signature. The digital signature may be available only under the Adobe software above version 7.0. FCC PART 15.247 TEST REPORT For Signify (China) Investment Co., Ltd. Building no.9, Lane 888, Tianlin Road, Minhang District, Shanghai, 200233 China FCC ID: 2AGBW442294730771X Report Type: Original Report Product Type: LED Lamp Test Engineer: Sam Ye Re port Number: RKSB190905003-00A Re port Date: 2019-09-24 Reviewed B y: Oscar Ye EMC Manager Prepared By: Bay Area Compliance Laboratories Corp. (Kunshan) No.248 Chenghu Road,Kunshan,Jiangsu province,China Tel: +86-0512-86175000 Fax: +86-0512-88934268 www.baclcorp.com.cn Bay Area Compliance Laboratories Corp. (Kunshan) Report No.: RKSB190905003-00A FCC Part 15.247 Page 2 of 37 TABLE OF CONTENTS GENERAL INFORMATION ....................................................................................................................................... 4 PRODUCT DESCRIPTION FOR EQUIPMENT UNDER TEST (EUT) ..................................................................................... 4 OBJECTIVE ................................................................................................................................................................... 4 RELATED SUBMITTAL(S)/GRANT(S) ............................................................................................................................. 4 TEST METHODOLOGY .................................................................................................................................................. 4 MEASUREMENT UNCERTAINTY .................................................................................................................................... 5 TEST FACILITY ............................................................................................................................................................. 5 SYSTEM TEST CONFIGURATION .......................................................................................................................... 6 DESCRIPTION OF TEST CONFIGURATION ...................................................................................................................... 6 EQUIPMENT MODIFICATIONS ....................................................................................................................................... 6 EUT EXERCISE SOFTWARE .......................................................................................................................................... 6 SUPPORT EQUIPMENT LIST AND DETAILS .................................................................................................................... 7 EXTERNAL I/O CABLE .................................................................................................................................................. 7 BLOCK DIAGRAM OF TEST SETUP ................................................................................................................................ 7 SUMMARY OF TEST RESULTS ............................................................................................................................... 9 TEST EQUIPMENT LIST ......................................................................................................................................... 10 FCC §1.1310 & §2.1091 – MAXIMUM PERMISSIBLE EXPOSURE (MPE) ...................................................... 11 CALCULATED FORMULARY: ....................................................................................................................................... 11 FCC §15.203 - ANTENNA REQUIREMENT ........................................................................................................... 12 APPLICABLE STANDARD ............................................................................................................................................ 12 ANTENNA CONNECTOR CONSTRUCTION .................................................................................................................... 12 FCC §15.207 (a) – AC LINE CONDUCTED EMISSIONS ..................................................................................... 13 APPLICABLE STANDARD ............................................................................................................................................ 13 EUT SETUP ................................................................................................................................................................ 13 EMI TEST RECEIVER SETUP ....................................................................................................................................... 13 TEST PROCEDURE ...................................................................................................................................................... 14 CORRECTED FACTOR & OVER LIMIT CALCULATION .................................................................................................. 14 TEST RESULTS SUMMARY .......................................................................................................................................... 14 TEST DATA ................................................................................................................................................................ 14 FCC §15.209, §15.205 & §15.247(d) - SPURIOUS EMISSIONS ............................................................................. 17 APPLICABLE STANDARD ............................................................................................................................................ 17 EUT SETUP ..................................................................................................…
Text truncated - open the document above for the full version.
Note: This test report is prepared for the customer shown above and for the device described herein. It may not be duplicated or used in part without prior written consent from Bay Area Compliance Laboratories Corp. This report is valid only with a valid digital signature. The digital signature may be available only under the Adobe software above version 7.0. FCC PART 15.247 TEST REPORT For Signify (China) Investment Co., Ltd. Building no.9, Lane 888, Tianlin Road, Minhang District, Shanghai, 200233 China FCC ID: 2AGBW442294730771X Report Type: Original Report Product Type: LED Lamp Test Engineer: Sam Ye Re port Number: RKSB190905003-00B Re port Date: 2019-09-25 Reviewed B y: Oscar Ye EMC Manager Prepared By: Bay Area Compliant Laboratories Corp. (Kunshan) No.248 Chenghu Road,Kunshan,Jiangsu province,China Tel: +86-0512-86175000 Fax: +86-0512-88934268 www.baclcorp.com.cn Bay Area Compliance Laboratories Corp. (Kunshan) Report No.: RKSB190905003-00B FCC Part 15.247 Page 2 of 37 TABLE OF CONTENTS GENERAL INFORMATION ....................................................................................................................................... 4 PRODUCT DESCRIPTION FOR EQUIPMENT UNDER TEST (EUT) ..................................................................................... 4 OBJECTIVE ................................................................................................................................................................... 4 RELATED SUBMITTAL(S)/GRANT(S) ............................................................................................................................. 4 TEST METHODOLOGY .................................................................................................................................................. 4 MEASUREMENT UNCERTAINTY .................................................................................................................................... 5 TEST FACILITY ............................................................................................................................................................. 5 SYSTEM TEST CONFIGURATION .......................................................................................................................... 6 DESCRIPTION OF TEST CONFIGURATION ...................................................................................................................... 6 EQUIPMENT MODIFICATIONS ....................................................................................................................................... 6 EUT EXERCISE SOFTWARE .......................................................................................................................................... 6 SUPPORT EQUIPMENT LIST AND DETAILS .................................................................................................................... 7 EXTERNAL I/O CABLE .................................................................................................................................................. 7 BLOCK DIAGRAM OF TEST SETUP ................................................................................................................................ 7 SUMMARY OF TEST RESULTS ............................................................................................................................... 9 TEST EQUIPMENT LIST ......................................................................................................................................... 10 FCC §1.1310& §2.1091 –MAXIMUM PERMISSIBLE EXPOSURE (MPE) ............................................................. 11 CALCULATED FORMULARY: ....................................................................................................................................... 11 FCC §15.203 - ANTENNA REQUIREMENT ........................................................................................................... 12 APPLICABLE STANDARD ............................................................................................................................................ 12 ANTENNA CONNECTOR CONSTRUCTION .................................................................................................................... 12 FCC §15.207 (a) – AC LINE CONDUCTED EMISSIONS ..................................................................................... 13 APPLICABLE STANDARD ............................................................................................................................................ 13 EUT SETUP ................................................................................................................................................................ 13 EMI TEST RECEIVER SETUP ....................................................................................................................................... 13 TEST PROCEDURE ...................................................................................................................................................... 13 CORRECTED FACTOR & OVER LIMIT CALCULATION .................................................................................................. 14 TEST RESULTS SUMMARY .......................................................................................................................................... 14 TEST DATA ................................................................................................................................................................ 14 FCC §15.209, §15.205 & §15.247(d) - SPURIOUS EMISSIONS ............................................................................. 17 APPLICABLE STANDARD ............................................................................................................................................ 17 EUT SETUP ..............................................................................................…
Text truncated - open the document above for the full version.
EXHIBIT C - TEST SETUP PHOTOGRAPHS Conducted Emissions (Front View) Conducted Emissions (Side View) Radiated Emissions (Below 1GHz) Radiated Emissions (Above 1GHz)
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 2 | 15C | 2.40 GHz - 2.48 GHz | 3.00 mW |
Dimmer Switch
Equipment Class
DTS - Digital Transmission SystemHDMI Sync Box
Equipment Class
DTS - Digital Transmission SystemLED lamp
Equipment Class
DTS - Digital Transmission System
WiZ Camera Module
Equipment Class
DTS - Digital Transmission System
LED lamp
Equipment Class
DTS - Digital Transmission System