FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. SACKit ApS/
  3. 2AO5W-CHARGEITS

2AO5W-CHARGEITSWireless Charging Power Bank

SACKit ApS
Wireless Charging Power Bank - FCC ID 2AO5W-CHARGEITS - SACKit ApS
Click to zoom

Application Details

Equipment Class
DCD - Part 15 Low Power Transmitter Below 1705 kHz
Date of Grant
Jun 22, 2020
Application Purpose
Original Equipment
Date of Application
Jun 22, 2020
Equipment Note
Wireless Charging Power Bank
Frequency Range
0.11500000 - 0.20500000
Company
SACKit ApS
Country
Denmark

Documents & Files

Select a file to view

Users Manual

↗

Cover Letter(s)

↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

① Touch the switch, the power indicator light on and display the remaining power capacity, wireless charging indicator light will turn off after blue light and green light flash alternately. ② When the mobile power is charged, the white LED light is prompted to charge in the form of a running horse lamp, which is extinguished after 30 S. Mobile power discharge, the current power LED always bright ,30 S after extinguishing. *The wireless charging will shut down automatically if mobile phone leave mobile power bank for 30 seconds, and please touch start again if need charging.Wireless charging can be realized through the battery- powered coil if USB-C port without power connection . ① Connect the power adapter to socket. ② Connect adapter to the USB2.0 interface, the other micro USB to the power bank. *When linked to power supply, the power bank will charge mobile phone firstly and then charge the power bank when the phone fully charged or move away. Battery: Polymer Li-ion Battery Battery capacity: 6000mA Input voltage: DC5V/2A DC9V/1.67A Output voltage: 5W/7.5W/10W USB-A output voltage: 5V/2.1A Dimensions: 140*80*24mm 对手机进行无线充电 通过USB对设备进行充电 ① 轻按开关,电源指示灯点亮并显示剩余电量,无线充电指示 灯蓝绿交替闪烁后熄灭。 ② 当移动电源充电时,白色LED 灯以跑马灯形式提示充电,30S后 熄灭。移动电源放电时,当前电量 LED 常亮,30S后熄灭。 *当手机离开移动电源30秒,无线充电自动关闭,如再充电需要需重新 触摸启动。在USB-C 口没有接电的情况下可通过电池供电线圈实现无 线充电的功能。 ② USB电源线一端连接适配器,一端连接移动电源。 *当移动电源进行充电时,放入手机进行无线充电,程序将停止对 移动电源充电,优先对手机进行无线充电。 无线充电移动电源 电池类型:聚合物锂电池 电池容量:6000mA 输入电压:DC5V/2A DC9V/1.67A 输出电压:5W/7.5W/10W USB-A输出:5V/2.1A 规格尺寸:140*80*24mm 内含:无线充电移动电源、150cm电源线、产品说明书 *不含电源适配器,如需要请另外购买或使用手机原装适配器。 Charge your mobile phone wirelessly Charging device with micro USB *AC adapter is excluded, please buy separately or use the mobile phone original adapter if need. Portable Wireless Charging Power Bank This device complies with part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. Any changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. NOTE: This equipment has been tested and found to comply with the limits for a Class B digital device, pursuant to Part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communica- tions. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: -- Reorient or relocate the receiving antenna. -- Increase the separation between the equipment and receiver. -- Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. Consult the dealer or an experienced radio/TV technician for help. To maintain compliance with FCC’s RF Exposure guidelines, This equipment should be installed and operated with minimum distance between 20cm the radiator your body: Use only the supplied antenna. FCC ID:2AO5W-CHARGEITS Warning: Changes or modifications to this unit not expressly approved by the part responsible for compliance could void the user’s authority to operate the equipment.

Cover Letter(s)

C5266091_X8_Ed.1 1/1 Letter of Authorization < SACKit ApS > Company: SACKit ApS Address: Lyngvej 1,DK-9000 Aalborg,Denmark Product Name: Wireless Charging Power Bank Model Number: CHARGEit Stand FCC Identifier: 2AO5W-CHARGEITS We authorize LGAI Technological Center S.A., Ronda de la Font del Carme, s/n, 08193 Bellaterra, Spain, to act on our behalf on all matters concerning the above named equipment. Any individual within LGAI Technological Center S.A. is authorized to act on our behalf and take action on the application. We declare that authorize LGAI Technological Center S.A., Ronda de la Font del Carme, s/n, 08193 Bellaterra, Spain, is allowed to forward all information related to the approval project to the Federal Communication Commission and to discuss any issues concerning the approval application. Any and all acts carried out by LGAI Technological Center S.A. on our behalf shall have the same effect as acts of our own. Name: Peter Rasmussen Date: 6/22/20 Title: Manager Signature of applicant:

Cover Letter(s)

C5266091_X10_Ed.2 1/1 < SACKit ApS > Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 Date: 6/22/20 Subject: Request for Confidentiality FCC ID: 2AO5W-CHARGEITS To Whom It May Concern, Pursuant to the provisions of Sections 0.457 and 0.459 of Commission's rules (47CFR0.457, 0.459), we are requesting the Commission to withhold the following attachment(s) as confidential document from public disclosure. Exhibits Long-Term Confidentiality Short-Term Confidentiality NOTE 2 ID Label/Location No No Attestation Statement No No External Photos No ☐ Block Diagram ☒ ☐ Schematics ☒ ☐ Test Report No No Test Setup Photos No ☐ User’s Manual ☐ NOTE 1 ☐ Internal Photos ☐ NOTE 1 ☐ Parts List / Tune Up ☐ ☐ RF Exposure Info No No Operational Description ☒ ☐ Cover Letter(s) No No SDR Software / Security Info ☐ No NOTE 1: Long-Term Confidentiality may be permitted under special conditions (See II. LONG-TERM CONFIDENTIALITY, Section 3 of KDB 726920, use last in force) NOTE 2: Short-Term Confidentiality can be requested for a maximum of 180 days from the date of the grant. Above mentioned document contains detailed system and equipment description are considered as proprietary information in operation of the equipment. The public disclosure of above documents might be harmful to our company and would give competitor an unfair advantage in the market. In case of short-term Confidentiality, the applicant requests the exhibits selected above are withheld from public view for a period of ______ days from the date of the Grant of Equipment Authorization and prior to marketing. It is our understanding that all measurement test reports, FCC ID label format and correspondent during certification review process cannot be granted as confidential documents and those information will be available for public review once the grant of equipment authorization is issued. C5266091_X10_Ed.2 1/1 Sincerely, Signature: Name: Peter Rasmussen Title: Manager

External Photos

1 - Page 1 of 4 - Report No.: MTi20041329-4E1-1 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China APPENDIX 1: EUT PHOTO Photo 1 (For model CHARGEit Stand) Photo 2 1 - Page 2 of 4 - Report No.: MTi20041329-4E1-1 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China Photo 3 Photo 4 1 - Page 3 of 4 - Report No.: MTi20041329-4E1-1 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China Photo 5 Photo 6 1 - Page 4 of 4 - Report No.: MTi20041329-4E1-1 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China Photo 7 ----END OF REPORT----

ID Label/Location Info

38.3mm 38.7m m FC28 底壳 ST10 / / 2020.4.30 1:1 1.0 丝印潘通冷灰3C

Internal Photos

1 - Page 1 of 4 - Report No.: MTi20041329-4E1-1 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China APPENDIX 1: EUT PHOTO Photo 1 (For model CHARGEit Stand) Photo 2 1 -Page 2 of 4 -Report No.: MTi20041329-4E1-1 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China Photo 3 Photo 4 8025 1 - Page 3 of 4 - Report No.: MTi20041329-4E1-1 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China Photo 5 Photo 6 1 - Page 4 of 4 - Report No.: MTi20041329-4E1-1 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China Photo 7 ----END OF REPORT---- Wireless charging antenna

RF Exposure Info

This test report is valid for the tested samples only. It cannot be reproduced except in full without prior written consent of Shenzhen Microtest Co., Ltd. Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China EXPOSURE REPORT FCC ID:2AO5W-CHARGEITS Date of issue: June 02, 2020 Report Number: MTi20041329-4E2 Sample Description: Wireless Charging Power Bank Mo d e l( s ) : CHARGEit Stand Applicant: SACKit ApS Address: Lyngvej 1, DK-9000 Aalborg, Denmark Date of Test: May 19, 2020 – June 02, 2020 Shenzhen Microtest Co., Ltd. http://www.mtitest.com - Page 2 of 9 - Report No.: MTi20041329-4E2 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China Test Result Certification Applicant’s name: SACKit ApS Address: Lyngvej 1, DK-9000 Aalborg, Denmark Manufacture's name: Shenzhen Powerqi Technology Co., Ltd. Address: 2nd&3rd Floor, Building A4, Block A, Fangxing Science & Tech. Park, No. 13 of BaoNan Road, Longgang District, Shenzhen, China Product name: Wireless Charging Power Bank Trademark: SACKit Model name: CHARGEit Stand Standard: FCC CFR 47 PART 1 , 1.1310 RF Exposure Procedures: KDB 680106 D01 RF Exposure Wireless Charging App v03 This device described above has been tested by Shenzhen Microtest Co., Ltd. and the test results show that the equipment under test (EUT) compliance with the FCC requirements. And it is applicable only to the tested sample identified in the report. Tested by: Demi Mu June 02, 2020 Reviewed by: Leo Su June 02, 2020 Approved by: Tom Xue June 02, 2020 - Page 3 of 9 - Report No.: MTi20041329-4E2 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China 1 General Information 1.1 Description of EUT Product name: Wireless Charging Power Bank Brand name: SACKit Model name: CHARGEit Stand Series model: N/A Deference in serial model: N/A Operation frequency: 115–205 kHz Operational mode: Wireless charging Modulation type: ASK Antenna type: Coil Antenna Power source: DC 5V from adapter AC 120V/60Hz or DC 3.7V from battery Battery: DC 3.7V 6000mAh Adapter information: N/A 1.2 Ancillary equipment list Equipment Model S/N Manufacturer / / / / / / / / 1.3 Measurement uncertainty Measurement Uncertainty for a Level of Confidence of 95 %, U=2xUc(y) Radiated emission(150kHz~30MHz) ± 2.5 dB Radiated emission(30MHz~1GHz) ± 4.2 dB Radiated emission (above 1GHz) ± 4.3 dB Temperature ±1 degree Humidity ± 5 % - Page 4 of 9 - Report No.: MTi20041329-4E2 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China 2 Testing site Test Site Shenzhen Microtest Co., Ltd Test Site Location No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China FCC Registration No.: 448573 - Page 5 of 9 - Report No.: MTi20041329-4E2 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China 3 List of test equipment Equipment No. Equipment Name Manufacturer Model Serial No. Calibration date Due date MTI-E068 Broadband Field Meter Narda Safety Test Solutions GmbH NBM- 520 D-1699 2019/07/13 2020/07/12 MTI-E069 Probe E-Field Narda Safety Test Solutions EF0691 H-0571 2019/07/13 2020/07/12 - Page 6 of 9 - Report No.: MTi20041329-4E2 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China 4 Test Results 4.4 Maximum permissible exposure 4.4.1 Limit Frequency range(MHz) Electric field strength(V/m) Magnetic field strength(A/m) Power density(mW/cm2) Averaging time(minutes) (A) Limits for Occupational/Controlled Exposure 0.3-3.0 614 1.63 *100 6 3.0-30 1842/f 4.89/f *900/f 2 6 30-300 61.4 0.163 1.0 6 6 300-1500 f/300 6 1500-100000 5 6 (B) Limits for General Population/Uncontrolled Exposure 0.3-1.34 614 1.63 *100 30 1.34-30 824/f 2.19/f *180/f 2 30 30-300 27.5 0.073 0.2 30 300-1500 f/1500 30 1500-100000 1 30 f = frequency in MHz * = Plane-wave equivalent power density 4.4.2 Test Procedures E and H-field measurements should be made with the center of the probe at a distance of 15 cm surrounding the device and 20 cm above the top surface of the primary/client pair. These measurements should be repeated for three different client battery levels, 1%, 50%, and 99%. Record the test results. KDB 680106 D01 RF Exposure Wireless Charging App v03: (1) Power transfer frequency is less than 1MHz. (2) Output power from each primary coil is less than or equal to 15 watts. (3) The transfer system includes only single primary and secondary coils. This includes charging systems that may have multiple primary coils and clients that are able to detect and allow coupling only between individual pairs of coils. (4) Client device is placed directly in contact with the transmitter. (5) Mobile exposure conditions only (portable exposure conditions are not covered by this exclusion). (6) The aggregate H-field strengths at 15 cm surrounding the device and 20 cm above the top surface from all simultaneous transmitting coils are demonstrated to be less than 50% of the MPE limit. - Page 7 of 9 - Report No.: MTi20041329-4E2 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected]…

Text truncated - open the document above for the full version.

Test Report

This test report is valid for the tested samples only. It cannot be reproduced except in full without prior written consent of Shenzhen Microtest Co., Ltd. Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China Test Report FCC ID:2AO5W-CHARGEITS Date of issue: June 02, 2020 Report number: MTi20041329-4E1 Sample description: Wireless Charging Power Bank Mo d e l( s ) : CHARGEit Stand Applicant: SACKit ApS Address: Lyngvej 1, DK-9000 Aalborg, Denmark Date of test: May 19, 2020 – June 02, 2020 Shenzhen Microtest Co., Ltd. http://www.mtitest.com - Page 2 of 25 - Report No.: MTi20041329-4E1 Tel:(86-755)88850135 Fax: (86-755) 88850136 Web: http://www.mtitest.com E-mail: [email protected] Address: No.102A & 302A, East Block, Hengfang Industrial Park, Xingye Road, Xixiang, Bao'an District, Shenzhen, Guangdong, China Table of Contents 1 GENERAL INFORMATION ................................................................................................................................... 4 1.1 FEATURE OF EQUIPMENT UNDER TEST (EUT) ................................................................................................................... 4 1.2 TEST MODE .............................................................................................................................................................. 4 1.3 EUT TEST SETUP........................................................................................................................................................ 5 1.4 ANCILLARY EQUIPMENT .............................................................................................................................................. 5 2 SUMMARY OF TEST RESULT ............................................................................................................................... 6 2.1 OPERATION CHANNEL LIST ........................................................................................................................................... 6 2.2 TEST CHANNEL .......................................................................................................................................................... 6 3 TEST FACILITIES AND ACCREDITATIONS .............................................................................................................. 7 3.1 TEST LABORATORY ..................................................................................................................................................... 7 3.2 ENVIRONMENTAL CONDITIONS ..................................................................................................................................... 7 3.3 MEASUREMENT UNCERTAINTY ...................................................................................................................................... 7 3.4 TEST SOFTWARE ........................................................................................................................................................ 7 4 LIST OF TEST EQUIPMENT .................................................................................................................................. 8 5 TEST RESULTS ..................................................................................................................................................... 9 5.1 ANTENNA REQUIREMENT ............................................................................................................................................ 9 5.1.1 Standard requirement ................................................................................................................................. 9 5.1.2 EUT Antenna ............................................................................................................................................... 9 5.2 CONDUCTED EMISSION ............................................................................................................................................. 10 5.2.1 Limits ......................................................................................................................................................... 10 5.2.2 Test Procedures ......................................................................................................................................... 10 5.2.3 Test Setup .................................................................................................................................................. 10 5.2.4 Test Result ................................................................................................................................................. 10 5.3 RADIATED EMISSION ................................................................................................................................................. 15 5.3.1 Limits ......................................................................................................................................................... 15 5.3.2 Test Procedures ......................................................................................................................................... 16 5.3.3 Test Setup .................................................................................................................................................. 17 5.3.4 Test Result ................................................................................................................................................. 17 5.4 OCCUPIED BANDWIDTH............................................................................................................................................. 22 5.4.1 Test method ............................................................................................................................................... 22 5.4.2 Test result ....…

Text truncated - open the document above for the full version.

Test Setup Photos

Model: CHARGEit Stand Radiated emission F Conducted emission

Contact Information

Applicant

Peter Rasmussen
[email protected]+4530613631Fax: N/A

Technical Contact

Shenzhen Microtest Co., LtdSmith Chen
[email protected]86-755 88850135

Shenzhen · China

Test Firm

Shenzhen Microtest Co., Ltd.Selby Liao
[email protected]0755-88850135-1193

Technical Specifications

#Rule PartsFrequency RangePower Output
115C0.115 MHz - 0.205 MHz-
Confidentiality
Long Term

Other Applications from SACKit ApS

Bluetooth Speaker - FCC ID 2AO5W-MOVE100 - SACKit ApS
2AO5W-MOVE100

Bluetooth Speaker

Aug 11, 2021

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
Wireless Charging Pad - FCC ID 2AO5W-CHARGE50 - SACKit ApS
2AO5W-CHARGE50

Wireless Charging Pad

Jun 28, 2021

Equipment Class

DCD - Part 15 Low Power Transmitter Below 1705 kHz
Bluetooth True Wireless Headset - FCC ID 2AO5WROCK250 - SACKit ApS
2AO5WROCK250

Bluetooth True Wireless Headset

Apr 25, 2021

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
Dual Wireless Charging Pad - FCC ID 2AO5W-CHARGEITDD - SACKit ApS
2AO5W-CHARGEITDD

Dual Wireless Charging Pad

Jul 22, 2020

Equipment Class

DCD - Part 15 Low Power Transmitter Below 1705 kHz
Stand Wireless Charger - FCC ID 2AO5W-CHARGEITSD - SACKit ApS
2AO5W-CHARGEITSD

Stand Wireless Charger

Jun 20, 2020

Equipment Class

DCD - Part 15 Low Power Transmitter Below 1705 kHz