Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
ROAM-LR-TR: CFR 47 §2.911 (d)(7) Agent Designation Attestation Date: 3/26/2026 Federal Communications Commissions Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 RE: CFR 47 §2.911 (d)(7) Agent Designation Attestation FCC ID: M3URMLR To whom it may concern: Hunter Industries Inc. (“the applicant”) as required by section §2.911(d)(7), will also serve as the agent for service of process for the above referenced FCC IDs. The applicant acknowledges that they will maintain an agent for no less than one year after the grantee has terminated all marketing and importation or the conclusion of any Commission-related proceeding involving the equipment. The applicant further acknowledges their responsibility under CFR 47 §2.929(c) to inform the FCC whenever the agent information changes. Satoshi Kuwahara Hunter Industries Inc. FCC FRN: 0011558756 1940 Diamond St, San Marcos, CA 92078 [email protected] Sincerely yours, __________________________ Name: Satoshi Kuwahara Job Title: Vice President, Product Integrity Company Name: Hunter Industries, Inc.
ROAM-LR-TR: CFR 47 §2.911 (d)(5) Attestation Date: 3/26/2026 Federal Communications Commissions Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 RE: CFR 47 §2.911 (d)(5) Attestation FCC ID: M3URMLR 1. Hunter Industries Inc. (“the applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. 2. Hunter Industries Inc. (“the applicant”) certifies that the device does not have cybersecurity and / or anti-virus software produced or provided by Kaspersky Lab, Inc. or any of its successors and assignees, identified on the Covered List installed on the device, nor will it be installed by the applicant anytime after certification. 3. Hunter Industries Inc. (“the applicant”) certifies that the RF device is not a router “produced in a foreign country“. 4. Hunter Industries Inc. (“the applicant”) certifies that, as of the date of the filing of the application, the applicant is not identified on the Covered List as an entity producing “covered” equipment and is not an affiliate or subsidiary of an entity identified on the Covered List. Sincerely yours, __________________________ Name: Satoshi Kuwahara Job Title: Vice President, Product Integrity Company Name: Hunter Industries, Inc.
Date: 1/6/2026 UL LLC 12 Laboratory Dr. Research Triangle Park, NC 27709 USA To whom it may concern: I, the undersigned, hereby authorize UL LLC to act on our behalf in all manners relating to application for equipment authorization, including signing of all documents relating to these matters. Any and all acts carried out by UL Verification Services Inc. on our behalf shall have the same effect as acts of our own. I, the undersigned, hereby certify that we are not subject to a denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 853(a). In authorizing UL LLC as our representative, we still recognize that we are responsible to: a) fulfill the requirements for the scope of certification requested, including implementing any appropriate changes requested by UL Verification Services Telecommunications Certification Body (TCB) and / or the FCC; b) supply any and all information needed for the evaluation of the products for which certification is sought; c) make claims regarding certification only in respect of the scope for which certification has been granted; d) not use our product certification in such a manner as to bring the TCB or FCC into disrepute and to not make any statement regarding product certification which the TCB or FCC may consider misleading or unauthorized; e) discontinue use of all advertising matter that contains any reference thereto and complies with any and all actions required by the FCC upon suspension or cancellation of certification; f) use certification only to indicate that products are certified in conformity with specified standards; g) endeavor to ensure that no certificate or report or any part thereof is used in a misleading manner, and any copies of the grants/certificates shall be reproduced in their entirety; h) comply with the requirements of the TCB and FCC, including the use of marks and label information prescribed for the scope of certification, when making reference to product certification in communication media such as documents, brochure or advertisements; i) comply with the requirements for certification, supply any information needed for evaluation of products to be certified and, where applicable, make provision for the participation of observers; j) ensure that products marketed under the scope of the requested certification continue to comply with the certification requirements; k) provide a sample of a production unit for testing within 30 days of the request should this product be selected as part of either the TCB’s or the FCC’s market surveillance requirements; l) keep a record of all complaints relating to product’s compliance with requirements of relevant standard; make records available to UL or FCC when requested; take appropriate action with respect to such complaints and any deficiencies found in the product that affect compliance with requirements for certification; document the actions taken with respect to complaints and/or deficiencies; m) inform the TCB immediately of any changes that may affect its ability to comply with the certification requirements. This authorization is valid until 07/07/2026 Sincerely yours, _____ Name: Satoshi Kuwahara Job Title: Vice President, Product Integrity Company Name: Hunter Industries, Inc.
Date: 1/6/2026 Attn: FCC Office of Engineering and Technology / UL Verification Services TCB Subject: Request for Confidentiality FCC ID: M3URMLR To Whom It May Concern: Pursuant to the provisions of Sections 0.457 and 0.459 of the Commission’s rules (47 CFR §§ 0.457, 0.459), we are requesting the Commission to withhold the following attachments as confidential document from public disclosure indefinitely. Schematic Diagram Block Diagram Theory of Operation Above mentioned document contains detailed system and equipment description are considered as proprietary information in operation of the equipment. The public disclosure of above documents might be harmful to our company and would give competitor an unfair advantage in the market. It is our understanding that all measurement test reports, FCC ID label format and correspondent during certification review process cannot be granted as confidential documents and those information will be available for public review once the grant of equipment authorization is issued. Best Regards __________________________ Name: Satoshi Kuwahara Job Title: Vice President, Product Integrity Company Name: Hunter Industries, Inc.
ROAM-LR-TR Label Location
FCC Part 1 Subpart I FCC Part 2 Subpart J INDUSTRY CANADA RSS-102 ISSUE 6 RF EXPOSURE REPORT FOR REMOTE MODEL NAME: ROAM-LR-TR FCC ID: M3URMLR IC Certification ID: 2772A-RMLR REPORT NUMBER: R15881598-E3 ISSUE DATE: 2026-04-06 Prepared for HUNTER INDUSTRIES, INC 1940 DIAMOND ST SAN MARCOS, CA 92078-5120, USA Prepared by UL LLC 12 LABORATORY DR. DURHAM, NC 27713 USA TEL: (919) 549-1400 REPORT NO: R15881598-E3 DATE: 2026-04-06 FCC ID: M3URMLR IC ID: 2772A-RMLR Page 2 of 8 UL LLC 12 Laboratory Drive, Durham, NC 27713; USA TEL:(919) 549-1400 This report shall not be reproduced except in full, without the written approval of UL LLC Revision History Rev. Issue Date Revisions Revised By V1 2025-12-16 Initial Issue Chandler Stanley V2 2026-04-06 Updated Antenna Gain Chandler Stanley REPORT NO: R15881598-E3 DATE: 2026-04-06 FCC ID: M3URMLR IC ID: 2772A-RMLR Page 3 of 8 UL LLC 12 Laboratory Drive, Durham, NC 27713; USA TEL:(919) 549-1400 This report shall not be reproduced except in full, without the written approval of UL LLC TABLE OF CONTENTS 1. ATTESTATION OF TEST RESULTS ................................................................................. 4 2. TEST METHODOLOGY ..................................................................................................... 5 3. REFERENCES ................................................................................................................... 5 4. FACILITIES AND ACCREDITATION ................................................................................. 5 5. DECISION RULES AND MEASUREMENT UNCERTAINTY .............................................. 6 5.1. METROLOGICAL TRACEABILITY ............................................................................. 6 5.2. DECISION RULES ..................................................................................................... 6 6. DEVICE UNDER TEST ....................................................................................................... 6 7. STANDALONE SAR TEST EXCLUSION CONSIDERATIONS .......................................... 7 7.1. FCC ............................................................................................................................ 7 7.2. ISED CANADA ........................................................................................................... 8 REPORT NO: R15881598-E3 DATE: 2026-04-06 FCC ID: M3URMLR IC ID: 2772A-RMLR Page 4 of 8 UL LLC 12 Laboratory Drive, Durham, NC 27713; USA TEL:(919) 549-1400 This report shall not be reproduced except in full, without the written approval of UL LLC 1. ATTESTATION OF TEST RESULTS COMPANY NAME: Hunter Industries, Inc 1940 Diamond St San Marcos, CA 92078-5120, USA EUT DESCRIPTION: Remote MODEL: ROAM-LR-TR SERIAL NUMBER: 10063800 / 8633929 SAMPLE RECEIPT DATE: 2025-07-01 and 2025-08-05 DATE TESTED: 2025-07-31 to 2025-08-12 APPLICABLE STANDARDS STANDARD TEST RESULTS FCC PART 1 SUBPART I & PART 2 SUBPART J Complies ISED CANADA RSS-102 ISSUE 6 Complies UL LLC tested the above equipment in accordance with the requirements set forth in the above standards. The test results show that the equipment tested is capable of demonstrating compliance with the requirements as documented in this report. The results documented in this report apply only to the tested sample, under the conditions and modes of operation as described herein. It is the manufacturer's responsibility to assure that additional production units of this model are manufactured with identical electrical and mechanical components. All samples tested were in good operating condition throughout the entire test program. Measurement Uncertainties are published for informational purposes only and were not taken into account unless noted otherwise. This document may not be altered or revised in any way unless done so by UL LLC and all revisions are duly noted in the revisions section. Any alteration of this document not carried out by UL LLC will constitute fraud and shall nullify the document. Approved & Released For UL LLC By: Prepared By: Jeff Moser Chandler Stanley Operations Manager Engineer Consumer, Medical and IT Segment Consumer, Medical and IT Segment UL LLC UL LLC REPORT NO: R15881598-E3 DATE: 2026-04-06 FCC ID: M3URMLR IC ID: 2772A-RMLR Page 5 of 8 UL LLC 12 Laboratory Drive, Durham, NC 27713; USA TEL:(919) 549-1400 This report shall not be reproduced except in full, without the written approval of UL LLC 2. TEST METHODOLOGY All calculations were made in accordance with FCC Parts 1.1310, 2.1091, 2.1093, KDB 447498 D01 v06, KDB 447498 D03 V01, IEEE Std C95.1-2005, and IEEE Std C95.3-2002. This report contains data provided by the customer which can impact the validity of results. UL LLC is only responsible for the validity of results after the integration of the data provided by the customer Client Provided Data: 1.) Declared Model Tested and Separation Distance (See section 6) 2.) Max Declared Avg. Output Power (see section 7.1) 3.) Antenna Gain (See section 7.2) 3. REFERENCES Output power, Duty cycle and Antenna gain data is excerpted from the applicable test reports or client declarations. 4. FACILITIES AND ACCREDITATION UL LLC is accredited by NVLAP, Laboratory Code 200246-0, for all testing performed within the scope of this report. Testing was performed at the locations noted below. Address ISED CABID ISED Company Number FCC Registration ☐ Building: 12 Laboratory Dr Durham, NC 27713, U.S.A US0067 2180C 825374 ☒ Building: 2800 Perimeter Park Dr. Suite B Morrisville, NC 27560, U.S.A 27265 REPORT NO: R15881598-E3 DATE: 2026-04-06 FCC ID: M3URMLR IC ID: 2772A-RMLR Page 6 of 8 UL LLC 12 Laboratory Drive, Durham, NC 27713; USA TEL:(919) 549-1400 This report shall not be reproduced except in full, without the written approval of UL LLC 5. DECISION RULES AND MEASUREMENT UNCERTAINTY 5.1. METROLOGICAL TRACEABILITY The measuring equipment utilized to perform the tests documented in this report has been calibrated in accordance with the…
Text truncated - open the document above for the full version.
TEST REPORT Report Number: R15881598-E1 Applicant : Hunter Industries, Inc 1940 Diamond St San Marcos, CA 92078-5120, USA Model : ROAM-LR-TR FCC ID : M3URMLR IC : 2772A-RMLR EUT Description : Remote Test Standard(s) : FCC 47 CFR PART 15 SUBPART C ISED RSS-247 ISSUE 4 ISED RSS-GEN ISSUE 5 + A1 + A2 Date Of Issue: 2026-04-06 Prepared by: UL LLC 12 Laboratory Dr. Durham, NC 27713 U.S.A. TEL: (919) 549-1400 REPORT NO: R15881598-E1 DATE: 2026-04-06 FCC ID: M3URMLR IC: 2772A-RMLR Page 2 of 26 UL LLC 12 Laboratory Drive, Durham, NC 27713; USA TEL:(919)549-1400 This report shall not be reproduced except in full, without the written approval of UL LLC REPORT REVISION HISTORY Rev. Issue Date Revisions Revised By V1 2025-12-16 Initial Issue Chandler Stanley V2 2026-04-06 Updated Antenna Gain Chandler Stanley REPORT NO: R15881598-E1 DATE: 2026-04-06 FCC ID: M3URMLR IC: 2772A-RMLR Page 3 of 26 UL LLC 12 Laboratory Drive, Durham, NC 27713; USA TEL:(919)549-1400 This report shall not be reproduced except in full, without the written approval of UL LLC REPORT REVISION HISTORY ................................................................................................. 2 1. ATTESTATION OF TEST RESULTS ................................................................................. 4 2. TEST RESULTS SUMMARY .............................................................................................. 5 3. TEST METHODOLOGY ..................................................................................................... 5 4. FACILITIES AND ACCREDITATION ................................................................................. 5 5. DECISION RULES AND MEASUREMENT UNCERTAINTY .............................................. 6 5.1. METROLOGICAL TRACEABILITY .............................................................................. 6 5.2. DECISION RULES ....................................................................................................... 6 5.3. MEASUREMENT UNCERTAINTY ............................................................................... 6 5.4. SAMPLE CALCULATION ............................................................................................ 6 6. EQUIPMENT UNDER TEST ............................................................................................... 7 6.1. EUT DESCRIPTION .................................................................................................... 7 6.2. MAXIMUM OUTPUT POWER...................................................................................... 7 6.3. DESCRIPTION OF AVAILABLE ANTENNAS .............................................................. 7 6.4. SOFTWARE AND FIRMWARE .................................................................................... 7 6.5. WORST-CASE CONFIGURATION AND MODE .......................................................... 7 6.6. DESCRIPTION OF TEST SETUP ................................................................................ 8 7. MEASUREMENT METHOD................................................................................................ 9 8. TEST AND MEASUREMENT EQUIPMENT ......................................................................10 9. ANTENNA PORT TEST RESULTS ...................................................................................11 9.1. ON TIME AND DUTY CYCLE .....................................................................................11 9.2. 99% BANDWIDTH ......................................................................................................12 9.3. 6 dB BANDWIDTH ......................................................................................................13 9.4. OUTPUT POWER.......................................................................................................14 9.5. AVERAGE POWER ....................................................................................................15 9.6. POWER SPECTRAL DENSITY ..................................................................................16 9.7. CONDUCTED SPURIOUS EMISSIONS .....................................................................17 10. RADIATED TEST RESULTS .............................................................................................18 10.1. TX BELOW 30MHz LORA MODE ...........................................................................20 10.2. TX BELOW 30-1000 MHz LORA MODE .................................................................22 10.3. TX ABOVE 1 GHz LORA MODE .............................................................................24 11. SETUP PHOTOS ...............................................................................................................26 REPORT NO: R15881598-E1 DATE: 2026-04-06 FCC ID: M3URMLR IC: 2772A-RMLR Page 4 of 26 UL LLC 12 Laboratory Drive, Durham, NC 27713; USA TEL:(919)549-1400 This report shall not be reproduced except in full, without the written approval of UL LLC 1. ATTESTATION OF TEST RESULTS COMPANY NAME: Hunter Industries, Inc 1940 Diamond St San Marcos, CA 92078-5120, USA EUT DESCRIPTION: Remote MODEL: ROAM-LR-TR SERIAL NUMBER: 10063800 SAMPLE RECEIPT DATE: 2025-07-01 and 2025-08-05 DATE TESTED: 2025-07-31 to 2025-08-12 APPLICABLE STANDARDS STANDARD TEST RESULTS CFR 47 Part 15 Subpart C ISED RSS-247 Issue 4 ISED RSS-GEN Issue 5 + A1 + A2 Complies Complies Complies UL LLC tested the above equipment in accordance with the requirements set forth in the above standards. The test results show that the equipment tested is capable of demonstrating compliance with the requirements as documented in this report. The results documented in this report apply only to the tested sample, under the conditions and modes of operation as described herein. It is the manufacturer's responsibility to assure that additional production units of this model are manufactured with identical electrical and mechanical components. All samples tested were in good operatin…
Text truncated - open the document above for the full version.
This document is issued by the Company subject to its General Conditions of Service printed overleaf, available on request or accessible at http://www.sgs.com/en/Terms-and-Conditions/General-Conditions-of-Services-NorthAm.aspx and, for electronic format documents, subject to Terms and Conditions for Electronic Documents at http://www.sgs.com/en/Terms-and-Conditions/terms-e-document.aspx. Attention is drawn to the limitation of liability, indemnification and jurisdiction issues defined therein. Any holder of this document is advised that information contained hereon reflects the Company’s findings at the time of its intervention only and within the limits of Client’s instructions, if any. The Company’s sole responsibility is to its Client and this document does not exonerate parties to a transaction from exercising all their rights and obligations under the transaction documents. This document cannot be reproduced except in full, without prior written approval of the Company. Any unauthorized alteration, forgery or falsification of the content or appearance of this document is unlawful and offenders may be prosecuted to the fullest extent of the law. Unless otherwise stated, the results shown in this test report refer only to the sample(s) tested and such sample(s) are retained until the customer requests them to be shipped back or SGS contacts the customer for approval to return them. SGS North America, Inc. Test Report Report No.: 210027 Date: March 12, 2026 Page 1 of 14 SGS BOSS No.: 5355138 Manufacturer’s Name: Hunter Industries The following sample(s) was/were submitted and identified by/on-behalf of the client as a mobile terminal device. Product Name ROAM-LR-TR PCB Trace Antenna Model Name ROAM-LR-TR PCB Trace Antenna Description The ROAM-LR-TR PCB Trace Antenna is part of the main PCB (PN: 10063800)of the ROAM-LR-TR. Board S/N N/A Testing Start Date 03/10/2026 Testing End Date 03/10/2026 Test(s) Requested Passive Antenna Performance Signed for and on behalf of SGS North America, Inc. Travis Beebe Fred Jeong __ Test Engineer OTA Lab Manager General Conditions of Service for North America 1. General (a) Unless otherwise agreed in writing or except where they are at variance with (i) the regulations governing services performed on behalf of governments, government bodies or any other public entity or (ii) the mandatory provisions of local law, all offers or services and all resulting contractual relationship(s) between any of the affiliated companies of SGS North America Inc. or any of their agents (each a “Company”) and Client (the “Contractual Relationship(s)”) shall be governed by these general conditions of service (hereinafter the “General Conditions”). (b) The Company may perform services for persons or entities (private, public or governmental) issuing instructions (hereinafter, the “Client”). © Unless the Company receives prior written instructions to the contrary from Client, no other party is entitled to give instructions, particularly on the scope of the services or the delivery of reports or certificates resulting therefrom (the “Reports of Findings”). Client hereby irrevocably authorize the Company to deliver Reports of Findings to a third party where so instructed by Client or, at its discretion, where it implicitly follows from circumstances, trade custom, usage or practice. 2. Provision of Services (a) The Company will provide services using reasonable care and skill and in accordance with Client’s specific instructions as confirmed by the Company or, in the absence of such instructions: (1) the terms of any standard order form or standard specification sheet of the Company; and/or (2) any relevant trade custom, usage or practice; and/or (3) such methods as the Company shall consider appropriate on technical, operational and/or financial grounds. (b) Information stated in Reports of Findings is derived from the results of inspection or testing procedures carried out in accordance with the instructions of Client, and/or our assessment of such results on the basis of any technical standards, trade custom or practice, or other circumstances which should in our professional opinion be taken into account. © Reports of Findings issued further to the testing of samples contain the Company’s opinion on those samples only and do not express any opinion upon the lot from which the samples were drawn. (d) Should Client request that the Company witness any third party intervention, Client agrees that the Company’s sole responsibility is to be present at the time of the third party’s intervention and to forward the results, or confirm the occurrence, of the intervention. Client agrees that the Company is not responsible for the condition or calibration of apparatus, instruments and measuring devices used, the analysis methods applied, the qualifications, actions or omissions of third party personnel or the analysis results. © Reports of Findings issued by the Company will reflect the facts as recorded by it at the time of its intervention only and within the limits of the instructions received or, in the absence of such instructions, within the limits of the alternative parameters applied as provided for in clause 2(a). The Company is under no obligation to refer to, or report upon, any facts or circumstances which are outside the specific instructions received or alternative parameters applied. (f) The Company may delegate the performance of all or part of the services to an agent or subcontractor and Client uthorizat Company to disclose all information necessary for such performance to the agent or subcontractor. (g) Should Company receive documents reflecting engagements contracted between Client and third parties or third party documents, such as copies of sale contracts, letters of credit, bills of lading, etc., they are considered to be for information only, and do not extend or restrict the scope of the services or the obligations accepted by the Company. (h) Client acknowl…
Text truncated - open the document above for the full version.
1940 Diamond Street · San Marcos, 92078 · United States
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 924 MHz - 924 MHz | 140.00 mW |

LoRa Radio Module
Equipment Class
DTS - Digital Transmission System
Wireless Valve Link
Equipment Class
DTS - Digital Transmission System
Quick plug-in controller
Equipment Class
DTS - Digital Transmission System
Repeater
Equipment Class
DTS - Digital Transmission System
Bluetooth Hose Timer
Equipment Class
DTS - Digital Transmission System