
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
FCC RF Radiation Exposure Statement: This equipment complies with FCC radiation exposure limits set forth for an uncontrolled environment. This equipment should be installed and operated with a minimum distance of 20cm between the radiator and any part of your body.
Consumer Lighting (U.S.) LLC dba GE Lighting, a Savant Company Federal Communications Commission 7435 Oakland Mills Road Columbia MD 21046 To whom it may concern: I, the undersigned, hereby authorize UL Verification Services Inc. to act on our behalf in all manners relating to application for equipment authorization, including signing of all documents relating to these matters. Any and all acts carried out by UL Verification Services Inc. on our behalf shall have the same effect as acts of our own. I, the undersigned, hereby certify that we are not subject to a denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 853(a). In authorizing UL Verification Services Inc. as our representative, we still recognize that we are responsible to: a) comply with the relevant provisions of the certification program; b) make all necessary arrangements for the conduct of the evaluation, including provision for examining documentation and access to all areas, records (including internal audit reports) and personnel for the purposes of evaluation (e.g. testing, inspection, assessment, surveillance, reassessment) and resolution of complaints; c) make claims regarding certification only in respect of the scope for which certification has been granted; d) do not use our product certification in such a manner as to bring the Certification Division into disrepute and not make any statement regarding our product certification which the Certification Division may consider misleading or unauthorized; e) upon suspension or cancellation of certification, discontinue use of all advertising matter that contains any reference thereto and return any certification documents as required by the Certification Division; f) use certification only to indicate the products are certified as being in conformity with specified standards; g) endeavor to ensure that no certificate or report nor any part thereof is used in a misleading manner; h) ensure that any reference to our product certification in communication media such as documents, brochures or advertising, complies with the requirements of the Certification Division; i) keep a record of all complaints made known to us relating to the product’s compliance with requirements of the relevant standard and to make these records available to the when requested; j) take appropriate action with respect to such complaints and any deficiencies found in products or services that affect compliance with the requirements for certification; k) document the actions taken. This authorization is valid until further written notice from the applicant. Sincerely Yours, Signed by: Company Name: Savant Technologies LLC, dba GE Lighting, a Savant Company Contact Name: Paul Smith Title of Person:Systems Engineer - Safety & Regulatory Address: 1975 Noble Road Cleveland Ohio 44112 United States Date: 06/20/2022
Savant Technologies LLC, dba GE Lighting, a Savant Company Federal Communications Commission 7435 Oakland Mills Road Columbia MD 21046 Subject: Request for Confidentiality FCC ID: PUU-CPLGOD2BLG2 To Whom It May Concern: Pursuant to the provisions of Sections 0.457 and 0.459 of the Commission’s rules (47 CFR §§ 0.457, 0.459), we are requesting the Commission to withhold the following attachments as confidential document from public disclosure indefinitely. Schematic Diagram Block Diagram Theory of Operation Bom list Above mentioned document contains detailed system and equipment description are considered as proprietary information in operation of the equipment. The public disclosure of above documents might be harmful to our company and would give competitor an unfair advantage in the market. It is our understanding that all measurement test reports, FCC ID label format and correspondent during certification review process cannot be granted as confidential documents and those information will be available for public review once the grant of equipment authorization is issued. Best Regards Company Name: Savant Technologies LLC, dba GE Lighting, a Savant Company Contact Name: Paul Smith Title of Person:Systems Engineer - Safety & Regulatory Address: 1975 Noble Road Cleveland Ohio 44112 United States Date: 06/20/2022
Savant Technologies LLC, dba GE Lighting, a Savant Company DATE : 06/20/2022 Equipment Authorisation Division Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 Request for Short-Term Confidentiality Company name: FCC ID: PUU-CPLGOD2BLG2 FCC Part 15 Certification Pursuant to Sections 0.457 and 0.459 of the commission rules, and in accordance with the FCC Public notice dated June 15, 2004 (DA 04-1705), we hereby request short-term confidentiality for the following items prior to marketing the device.: (1) Test Setup Photos (2) External Photos (3) Internal Photos (4) User Manual The applicant requests the exhibits selected above as short term confidential be withheld from public view for a period of 180 days from the date of the Grant of Equipment Authorization and prior to marketing. This is to avoid premature release of sensitive information prior to marketing or release of the product to the public. Sincerely, Company Name: Savant Technologies LLC, dba GE Lighting, a Savant Company Contact Name: Paul Smith Title of Person:Systems Engineer - Safety & Regulatory Address: 1975 Noble Road Cleveland Ohio 44112 United States Date: 06/20/2022
External Photographs Page 2 of 4 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. . View of EUT-1 View of EUT-2 Page 3 of 4 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. . View of EUT-3 View of EUT-4 Page 4 of 4 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. . View of EUT-5 View of EUT-6
::: GE logoPantone Cool Gray 2C10mm logo ID SM 2022.06.10 V1.0 :, *!"#$%&。 ()+, #,-./+3456, 789 :;3<=>?@AB . F。 Arial4pt,8 8mm, 0 5mm YYDDDLS YYDDDLS, Outdoor Plug TCO DVP OQRT:UVOQ WX ZX 14mm±0.5mm 10*10mm 7mm±0.5mm 7mm±0.5mm XXXXXXXXXXXX CYNC™ Outdoor Smart Plug CPLGOD2BLG1 Rating 120V AC 60Hz General use, max. 15A in total Motor, max. 1/3HP in total Operation Temperature: FCC ID: PUU-CPLGOD2BLG2 IC : 10798A-CPLGOD2BLG2 HVIN: CPLGOD2BLG2 IP64 Rainproof Type 3R Enclosure -20°C ~ 50°C Wifi MAC (12^_)MAC 15mm. See marking under the bracket↓ 6pt 5.5mm E514900 Designed in U.S.A. Made in China YYDDDLS gelighting.com/cync WARNING SUITABLE FOR OUTDOOR AND DAMP LOCATIONS. DO NOT IMMERSE IN WATER. INSTALL ABOVE GROUND LEVEL AT MIN. 1FT/0.3M WITH RECEPTACLE POINTED DOWN WHEN OUTDOOR. 65mm AVERTISSEMENT ADAPTÉ AUX ENDROITS EXTÉRIEURS ET HUMIDES. NE PAS PLONGER DANS L'EAU. INSTALLER AU-DESSUS DU SOL À MIN. 1FT / 0.3M AVEC RÉCEPTACLE POINTÉ VERS LE BAS À L'EXTÉRIEUR.
Internal Photographs Page 2 of 5 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. . Internal View of EUT-1 Internal View of EUT-2 Page 3 of 5 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. . Internal View of EUT-3 Internal View of EUT-4 Page 4 of 5 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. . Internal View of EUT-5 Internal View of EUT-6 Antenna Page 5 of 5 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. . Internal View of EUT-7 Internal View of EUT-8
The results reported herein have been performed in accordance with the laboratory’s terms of accreditation. This report shall not be reproduced except in full without the written approval of the Laboratory. The results in this report apply to the test sample(s) mentioned above at the time of the testing period only and are not to be used to indicate applicability to other similar products. FCC RF EXPOSURE REPORT CERTIFICATION TEST REPORT For Outdoor Plug TCO MODEL NUMBER: CPLGOD2BLG1 FCC ID: PUU-CPLGOD2BLG2 REPORT NUMBER: 4790448291-1-RF-3 ISSUE DATE: June 23, 2022 Prepared for Savant Technologies LLC, dba GE Lighting, a Savant Company 1975 Noble Road Cleveland, Ohio 44112 United States Prepared by UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch Building 10, Innovation Technology Park, No. 1, Li Bin Road, Song Shan Lake Hi- Tech Development Zone Dongguan, 523808, People’s Republic of China Tel: +86 769 22038881 Fax: +86 769 33244054 Website: www.ul.com REPORT NO.: 4790448291-1-RF-3 Page 2 of 7 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Revision History Rev. Issue Date Revisions Revised By V0 6/23/2022 Initial Issue REPORT NO.: 4790448291-1-RF-3 Page 3 of 7 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. TABLE OF CONTENTS 1. ATTESTATION OF TEST RESULTS ................................................................................. 4 2. TEST METHODOLOGY ..................................................................................................... 5 3. FACILITIES AND ACCREDITATION ................................................................................. 5 4. REQUIREMENT ................................................................................................................. 6 REPORT NO.: 4790448291-1-RF-3 Page 4 of 7 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. 1. ATTESTATION OF TEST RESULTS Applicant Information Company Name: Savant Technologies LLC, dba GE Lighting, a Savant Company Address: 1975 Noble Road Cleveland, Ohio 44112 United States Manufacturer Information Company Name: Savant Technologies LLC, dba GE Lighting, a Savant Company Address: 1975 Noble Road Cleveland, Ohio 44112 United States EUT Information EUT Name: Outdoor Plug TCO Model: CPLGOD2BLG1 Sample Received Date: June 13, 2022 Sample Status: Normal Sample ID: 5051105 Date of Tested: June 13, 2022 to June 23, 2022 APPLICABLE STANDARDS STANDARD TEST RESULTS FCC 47CFR§2.1091 PASS Prepared By: Checked By: Kebo Zhang Shawn Wen Project Engineer Laboratory Leader Approved By: Stephen Guo Laboratory Manager REPORT NO.: 4790448291-1-RF-3 Page 5 of 7 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. 2. TEST METHODOLOGY The tests documented in this report were performed in accordance with 47 CFR FCC Part 2 Subpart J, section 2.1091. 3. FACILITIES AND ACCREDITATION Accreditation Certificate A2LA (Certificate No.: 4102.01) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. has been assessed and proved to be in compliance with A2LA. FCC (FCC Designation No.: CN1187) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. Has been recognized to perform compliance testing on equipment subject to the Commission's Delcaration of Conformity (DoC) and Certification rules ISED (Company No.: 21320) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. has been registered and fully described in a report filed with ISED. The Company Number is 21320 and the test lab Conformity Assessment Body Identifier (CABID) is CN0046. VCCI (Registration No.: G-20019, R-20004, C-20012 and T-20011) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. has been assessed and proved to be in compliance with VCCI, the Membership No. is 3793. Facility Name: Chamber D, the VCCI registration No. is G-20019 and R-20004 Shielding Room B , the VCCI registration No. is C-20012 and T-20011 Note: All tests measurement facilities use to collect the measurement data are located at Building 10, Innovation Technology Park, Song Shan Lake Hi tech Development Zone, Dongguan, 523808, China. REPORT NO.: 4790448291-1-RF-3 Page 6 of 7 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. 4. REQUIREMENT LIMIT AND CALCULATION METHOD Systems operating under the provisions of FCC 47 CFR section shall be operated in a manner that ensures that the public is not exposed to radio frequency energy level in excess of the Commission’s guidelines. In accordance with 47 CFR FCC Part 2 Subpart J, section 2.1091 this device has been defined as mobile device whereby a distance of 0.2m normally can be maintained between the user and the device, and below RF Permissible Exposure limit shall comply with. Limits for General Population/Uncontrolled Exposure RF EXPOSURE LIMIT Frequency Range (MHz) E-field Strength (E) (V/m) Magnetic Field Strength (H) (A/m) Power Density (S) (mW/cm 2 ) Averaging Time |E| 2 , |H| 2 or S (Minutes) 0.3 -- 1.34 614 1.63 (100)* 30 1.34 -- 30 824/f 2.19/f (180/f 2 )* 30 30 -- 300 27.5 0.073 0.2 30 300 …
Text truncated - open the document above for the full version.
The results reported herein have been performed in accordance with the laboratory’s terms of accreditation. This report shall not be reproduced except in full without the written approval of the Laboratory. The results in this report apply to the test sample(s) mentioned above at the time of the testing period only and are not to be used to indicate applicability to other similar products. CFR 47 FCC PART 15 SUBPART C ISED RSS-247 ISSUE 2 TEST REPORT For Outdoor Plug TCO MODEL NUMBER: CPLGOD2BLG1 HVIN: CPLGOD2BLG2 REPORT NUMBER: 4790448291-1-RF-2 ISSUE DATE: June 23, 2022 FCC ID:PUU-CPLGOD2BLG2 IC:10798A-CPLGOD2BLG2 Prepared for GE Lighting 1975 Noble Road Cleveland, Ohio 44112 United States Prepared by UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch Building 10, Innovation Technology Park, No. 1, Li Bin Road, Song Shan Lake Hi- Tech Development Zone Dongguan, 523808, People’s Republic of China Tel: +86 769 22038881 Fax: +86 769 33244054 Website: www.ul.com REPORT NO.: 4790448291-1-RF-2 Page 2 of 104 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0035 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Revision History Rev. Issue Date Revisions Revised By V0 June 23, 2022 Initial Issue REPORT NO.: 4790448291-1-RF-2 Page 3 of 104 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0035 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Summary of Test Results Summary of Test Results Test Item Clause Limit/Requirement Result Antenna Requirement N/A FCC Part 15.203/15.247 (c) RSS-GEN Clause 6.8 Pass AC Power Line Conducted Emission ANSI C63.10-2013, Clause 6.2 FCC Part 15.207 RSS-GEN Clause 8.8 Pass Conducted Output Power ANSI C63.10-2013, Clause 11.9.1.3 FCC Part 15.247 (b)(3) RSS-247 Clause 5.4 (d) Pass 6dB Bandwidth and 99% Occupied Bandwidth ANSI C63.10-2013, Clause 11.8.1 FCC Part 15.247 (a)(2) RSS-247 Clause 5.2 (a) ISED RSS-Gen Clause 6.7 Pass Power Spectral Density ANSI C63.10-2013, Clause 11.10.2 FCC Part 15.247 (e) RSS-247 Clause 5.2 (b) Pass Conducted Band edge and spurious emission ANSI C63.10-2013, Clause 11.11 FCC Part 15.247(d) RSS-247 Clause 5.5 Pass Radiated Band edge and Spurious Emission ANSI C63.10-2013, Clause 11.12 & Clause 11.13 FCC Part 15.247 (d) FCC Part 15.205/15.209 RSS-247 Clause 5.5 RSS-GEN Clause 8.9 Pass Duty Cycle ANSI C63.10-2013, Clause 11.6 None; for reporting purposes only. Pass *This test report is only published to and used by the applicant, and it is not for evidence purpose in China. *The measurement result for the sample received is <Pass> according to <CFR 47 FCC PART 15 SUBPART C ISED RSS-247 ISSUE 2> when <Accuracy Method> decision rule is applied. REPORT NO.: 4790448291-1-RF-2 Page 4 of 104 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0035 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. CONTENTS 1. ATTESTATION OF TEST RESULTS ...................................................................................... 6 2. TEST METHODOLOGY .......................................................................................................... 7 3. FACILITIES AND ACCREDITATION ...................................................................................... 7 4. CALIBRATION AND UNCERTAINTY ..................................................................................... 8 4.1. MEASURING INSTRUMENT CALIBRATION ............................................................ 8 4.2. MEASUREMENT UNCERTAINTY ............................................................................. 8 5. EQUIPMENT UNDER TEST .................................................................................................... 9 5.1. DESCRIPTION OF EUT ............................................................................................. 9 5.2. CHANNEL LIST .......................................................................................................... 9 5.3. MAXIMUM AVERAGE EIRP ...................................................................................... 9 5.4. TEST CHANNEL CONFIGURATION ......................................................................... 9 5.5. THE WORSE CASE POWER SETTING PARAMETER .......................................... 10 5.6. DESCRIPTION OF AVAILABLE ANTENNAS .......................................................... 11 5.7. SUPPORT UNITS FOR SYSTEM TEST .................................................................. 12 5.8. SETUP DIAGRAM .................................................................................................... 12 6. MEASURING EQUIPMENT AND SOFTWARE USED ......................................................... 13 7. ANTENNA PORT TEST RESULTS ...................................................................................... 16 7.1. CONDUCTED OUTPUT POWER ............................................................................ 16 7.2. 6DB BANDWIDTH AND 99% OCCUPIED BANDWIDTH ........................................ 18 7.3. POWER SPECTRAL DENSITY ............................................................................... 20 7.4. CONDUCTED BAND EDGE AND SPURIOUS EMISSION...................................... 21 7.5. DUTY CYCLE ........................................................................................................... 23 8. RADIATED TEST RESULTS ................................................................................................ 24 8.1. RESTRICTED BANDEDGE ..................................................................................... 31 8.2. SPURIOUS EMISSIONS(1 GHZ~3 GHZ) .................................…
Text truncated - open the document above for the full version.
1、 Test Environment 2、 Antenna Spec X Y Parameter Value Frequency Range 2.4 ~ 2.49 GHz BLE & Wi-Fi Antenna Peak Gain 1.64 dBi Antenna Type PIFA Antenna Actual Form PCB 3、 Test Result
The results reported herein have been performed in accordance with the laboratory’s terms of accreditation. This report shall not be reproduced except in full without the written approval of the Laboratory. The results in this report apply to the test sample(s) mentioned above at the time of the testing period only and are not to be used to indicate applicability to other similar products. CFR 47 FCC PART 15 SUBPART C ISED RSS-247 ISSUE 2 TEST REPORT For Outdoor Plug TCO MODEL NUMBER: CPLGOD2BLG1 HVIN: CPLGOD2BLG2 REPORT NUMBER: 4790448291-1-RF-1 ISSUE DATE: June 23, 2022 FCC ID:PUU-CPLGOD2BLG2 IC:10798A-CPLGOD2BLG2 Prepared for Savant Technologies LLC, dba GE Lighting, a Savant Company 1975 Noble Road Cleveland, Ohio 44112 United States Prepared by UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch Building 10, Innovation Technology Park, No. 1, Li Bin Road, Song Shan Lake Hi- Tech Development Zone Dongguan, 523808, People’s Republic of China Tel: +86 769 22038881 Fax: +86 769 33244054 Website: www.ul.com REPORT NO.: 4790448291-1-RF-1 Page 2 of 69 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0035 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Revision History Rev. Issue Date Revisions Revised By V0 June 23, 2022 Initial Issue REPORT NO.: 4790448291-1-RF-1 Page 3 of 69 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0035 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Summary of Test Results Summary of Test Results Test Item Clause Limit/Requirement Result Antenna Requirement N/A FCC Part 15.203/15.247 (c) RSS-GEN Clause 6.8 Complianc e AC Power Line Conducted Emission ANSI C63.10-2013, Clause 6.2 FCC Part 15.207 RSS-GEN Clause 8.8 Pass Conducted Output Power ANSI C63.10-2013, Clause 11.9.1.3 FCC Part 15.247 (b)(3) RSS-247 Clause 5.4 (d) Pass 6dB Bandwidth and 99% Occupied Bandwidth ANSI C63.10-2013, Clause 11.8.1 FCC Part 15.247 (a)(2) RSS-247 Clause 5.2 (a) ISED RSS-Gen Clause 6.7 Pass Power Spectral Density ANSI C63.10-2013, Clause 11.10.2 FCC Part 15.247 (e) RSS-247 Clause 5.2 (b) Pass Conducted Band edge and spurious emission ANSI C63.10-2013, Clause 11.11 FCC Part 15.247(d) RSS-247 Clause 5.5 Pass Radiated Band edge and Spurious Emission ANSI C63.10-2013, Clause 11.12 & Clause 11.13 FCC Part 15.247 (d) FCC Part 15.205/15.209 RSS-247 Clause 5.5 RSS-GEN Clause 8.9 Pass Duty Cycle ANSI C63.10-2013, Clause 11.6 None; for reporting purposes only. Pass *This test report is only published to and used by the applicant, and it is not for evidence purpose in China. *The measurement result for the sample received is <Pass> according to <CFR 47 FCC PART 15 SUBPART C ISED RSS-247 ISSUE 2> when <Accuracy Method> decision rule is applied. REPORT NO.: 4790448291-1-RF-1 Page 4 of 69 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM NO: 10-SL-F0035 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. CONTENTS 1. ATTESTATION OF TEST RESULTS ..................................................................................... 6 2. TEST METHODOLOGY ......................................................................................................... 7 3. FACILITIES AND ACCREDITATION ..................................................................................... 7 4. CALIBRATION AND UNCERTAINTY ................................................................................... 8 4.1. MEASURING INSTRUMENT CALIBRATION ........................................................... 8 4.2. MEASUREMENT UNCERTAINTY ............................................................................ 8 5. EQUIPMENT UNDER TEST .................................................................................................. 9 5.1. DESCRIPTION OF EUT ........................................................................................... 9 5.2. CHANNEL LIST ........................................................................................................ 9 5.3. MAXIMUM AVERAGE EIRP ..................................................................................... 9 5.4. TEST CHANNEL CONFIGURATION ...................................................................... 10 5.5. THE WORSE CASE POWER SETTING PARAMETER .......................................... 10 5.6. DESCRIPTION OF AVAILABLE ANTENNAS ......................................................... 10 5.7. SUPPORT UNITS FOR SYSTEM TEST ................................................................. 11 5.8. SETUP DIAGRAM .................................................................................................. 11 6. MEASURING EQUIPMENT AND SOFTWARE USED......................................................... 12 7. ANTENNA PORT TEST RESULTS ..................................................................................... 15 7.1. CONDUCTED OUTPUT POWER ........................................................................... 15 7.2. 6DB BANDWIDTH AND 99% OCCUPIED BANDWIDTH ........................................ 16 7.3. POWER SPECTRAL DENSITY .............................................................................. 18 7.4. CONDUCTED BAND EDGE AND SPURIOUS EMISSION ..................................... 19 7.5. DUTY CYCLE ......................................................................................................... 21 8. RADIATED TEST RESULTS ............................................................................................... 22 8.1. RESTRICTED BANDEDGE .................................................................................... 29 8.2. SPURIOUS EMISSIONS(1 GHZ~3 GHZ) ..........…
Text truncated - open the document above for the full version.
Appendix II Setup Photographs RADIATED RF MEASUREMENT SETUP (ABOVE 1 GHz) MEASUREMENT POSITION MEASUREMENT POSITION (X axis) MEASUREMENT POSITION (Y axis) MEASUREMENT POSITION (Z axis) RADIATED RF MEASUREMENT SETUP (30MHz~1GHz) RADIATED RF MEASUREMENT SETUP (Below 30MHz) POWERLINE CONDUCTED EMISSIONS MEASUREMENT SETUP
Building 10, Innovation Technology Park, No. 1, Li · dongguan · China
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 2 | 15C | 2.41 GHz - 2.46 GHz | 29.00 mW |

Dual sockets indoor plug
Equipment Class
DTS - Digital Transmission System
CYNC Shoplight
Equipment Class
DTS - Digital Transmission SystemCync Direct Connect Strip
Equipment Class
DTS - Digital Transmission SystemPROSEO Sage LF module
Equipment Class
DTS - Digital Transmission System
Fan Switch
Equipment Class
DTS - Digital Transmission System