Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
Razer Inc. Doc nr. CERTIFICATIONS CONCERNING “COVERED” EQUIPMENT Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, Maryland 21046 2026.05.07 FCC ID: RWO-RZ010569 To Whom It May Concern: As required by section 2.911(d)(5)(i), [Razer Inc.] (“the applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. Razer Inc. certifies that the equipment for which authorization is sought does not include cybersecurity or anti-virus software produced or provided by Kaspersky Lab, Inc. or any of its successors and assignees, including equipment with integrated Kaspersky Lab, Inc. (or any of its successors and assignees) cybersecurity or anti-virus software pursuant to DA-24-886 and KDB 986446 D01 Covered Equipment Guidance section B(2a). As required by section 2.911(d)(5)(ii), [Razer Inc.] (“the applicant”) certifies that, as of the date of the filing of the application, the applicant [is not] identified on the Covered List (as a specifically named entity or any of its subsidiaries or affiliates) as an entity producing “covered” equipment. Thank you for your attention to this matter. Sincerely yours, Signature Printed Name: Johnsen Tia Company: Razer Inc. Job Title: Assoicate VP, Regulatory & Compliance Email: [email protected] Telephone: 760 579 0180
Rev 1/26/2023 Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 USA Date: 16-Apr--2025 Ref: Attestation Statements Part 2.911(d)(7) Filing Grantee Code: RWO Razer Inc. (“the applicant”) certifies that, as of the date of the filing of the application, we designate ourselves as the U.S. agent for service of process. Designated U.S. Agent Information: FRN: 0022386734 Name: Address: Contact Person: Email: Tel.: Razer Inc. 9 Pasteur, Irvine, California, United States Johnsen Tia [email protected] 760 579 0180 Sincerely, ________________ Johnsen Tia Associate VP, Regulatory & Compliance
Razer Inc. Declaration of Authorization We Name: Razer Inc. Address: 9 Pasteur City: Irvine State: California Country: United States Declare that: Name Representative of agent: Ms. Rose Liu Agent Company name: BTL Inc. Address: No.3 Jinshagang 1st Road, Shixia, Dalang Town City: Dong Guan Country: China is authorized to apply for Certification and signing related documents of the following product(s), including 731 form(s): Product description: Wireless Mouse Type designation: RZ01-0569, RZ01-0569XXXX-XXXX (X can be 0-9 or A-Z) Trademark: RAZER FCC ID : RWO-RZ010569 on our behalf. Date: 2026.06.07 City: Irvine Name: Johnsen Tia Function: Associate VP, Regulatory & Compliance Signature: . Notes: (1): Required for FCC application (2): For FCC it must be the Grantee Code “owner” or the authorized agent.
FCC, Request for non-disclosure Date: 02-01-2022 RF_501, Issue 10 Company Name: Razer Inc. Address: 9 Pasteur City: Irvine, CA92618 Country: United States To: Kiwa Netherlands B.V., Dept. FCC TCB Wilmersdorf 50 7327 AC Apeldoorn The Netherlands Subject: Request for confidentiality FCC ID: RWO-RZ010569 Reference number: ###### Dear FCC TCB, 1. Long-Term Confidentiality Pursuant to 47 CFR Section 0.459(a) & (b), we hereby requests non-disclosure and confidential treatment of the following materials submitted in support of FCC certification application: Bill(s) of Material Block Diagrams Operational Description Schematic Diagrams Tune-up Procedure Above materials contain secrets, proprietary and technical information, which would customarily be guarded from competitors under 47 CFR, section 0.457(d)(2). Disclosure or publication or any portion of this company confidential material to other parties could cause substantial competitive harm and provide unjustified benefits for competitors. 2. Short-Term Confidentiality (STC) Pursuant to Public Notice DA 04-1705 of the Commission’s policy, in order to comply with the marketing regulations in 47 CFR §2.803 and the importation rules in 47 CFR §2.1204, applicant hereby requests Short-Term Confidential treatment of the following materials (See notes below): Internal Photos User’s Manual Test Set-up Photos External Photos Justification: This document contains detailed system and equipment description are considered as proprietary information in operation of the equipment. The public disclosure of above documents might be harmful to our company and would give competitor unfair advantage in the market. Planned Release Date STC: 180 days from date of grant (notes 2, 3, 4, 5) Date: 2026.05.07 Name and signature of applicant: Johnsen Tia Notes: 1) A document or type of document can only have ONE type of confidentiality! 2) Short-Term confidentiality is in principle for 45 days from date of grant; it can be extended max 3 times (total time 180 days max.)! The planned date should state in the RF731 application form. 3) FCC must be informed when marketing begins earlier. 4) Release takes place automatically thus extension must be requested in time. Telefication does not remind you of this! 5) Request for extension or for release must be received by Kiwa NL B.V. at least 7 days before date of actual marketing or before expiration of the STC period
Model Declaration Letter We, the undersigning company Company Name: Razer Inc. Address: 9 Pasteur, Irvine, CA 92618, USA Hereby confirm that the following products: Product description: Wireless Mouse Type designation: RZ01-0569, RZ01-0569XXXX-XXXX (X can be 0-9 or A-Z) Trademark: RAZER That All versions of the Model RZ01-0569, RZ01-0569XXXX-XXXX, are electrically equal except the following difference: Only differ in the model name. X can be 0-9 or A-Z Date: 2026.05.07 Name: Johnsen Tia Telephone: 65 6571 6828 E-mail: [email protected] Signature:
NASA (Black) - Phase 1 (MITH) Model No. : RZ01 -0569 Wireless Mouse P/No.: RZ01 -056901 00 Rati n g: 1 .5V 25mA Serial No.: PM26WW H400XXXXX DUMMY © RAZER INC. Razer Inc. 9 Pasteur Irvine, CA92618 USA O FF 2.4BT FCC ID: RWO-RZ010569 IC: 8092D-RZ010569 CAN ICES (B) / NMB (B) MADE IN THAILAND/ FABRIQUÉ EN THAÏLANDE label location
Report No.: BTL-FCCP-3-2510C297 Report Version: R00 Page 1 of 4 FCC RF EXPOSURE REPORT FCC ID: RWO-RZ010569 Project No. : 2510C297 Equipment : Wireless Mouse Brand Name : RAZER, Test Model : RZ01-0569 Model Name : RZ01-0569, RZ01-0569XXXX-XXXX (X can be 0-9 or A-Z) Hardware Version : DVT Software Version : V1.0 Applicant : Razer Inc. Address : 9 Pasteur, Irvine, CA 92618, USA Manufacturer : RAZER (ASIA-PACIFIC) PTE. LTD. Address : Razer SEA HQ, 1 One-north Crescent, #02-01, Singapore 138538 Factory : RAZER TECHNOLOGY AND DEVELOPMENT (SHENZHEN) CO., LTD Address : East Wing, 3rd Floor, Block 2, Phase 1 of Vision Shenzhen Business Park Keji South Road, Hi-Tech Industrial Park, Shenzhen 518057, China Date of Receipt : Oct. 30, 2025 Date of Test : Oct. 31, 2025 ~ Jan. 20, 2026 Issued Date : Jan. 29, 2026 Test Sample : Engineering Sample No.: DG92025122351 Standard(s) : FCC Guidelines for Human Exposure IEEE C95.1 & KDB447498 D01 The above equipment has been tested and found compliance with the requirement of the relative standards by BTL Inc. (Dongguan). Prepared by : Chella Zheng Approved by : Chay Cai No.3, Jinshagang 1st Road, Dalang, Dongguan, Guangdong People’s Republic of China Te l : + 8 6-769-8318-3000 Web: www.newbtl.com Service mail: [email protected] Report No.: BTL-FCCP-3-2510C297 Report Version: R00 Page 2 of 4 REVISION HISTORY Report No. Version Description Issued Date Note BTL-FCCP-3-2510C297 R00 Original Report. Jan. 29, 2026 Valid Report No.: BTL-FCCP-3-2510C297 Report Version: R00 Page 3 of 4 1. GENERAL CONCULUSION According to FCC KDB447498 D01, Appendix A, SAR Test Exclusion Thresholds for 100 MHz – 6 GHz and ≤ 50 mm, the 1-g and 10-g SAR test exclusion thresholds are determined by the following: [(max. power of channel, including tune-up tolerance, mW) / (min. test separation distance, mm)] · [√f(GHz)] ≤ 3.0 for 1-g SAR, and ≤ 7.5 for 10-g extremity SAR, where f(GHz) is the RF channel transmit frequency in GHz Power and distance are rounded to the nearest mW and mm before calculation The result is rounded to one decimal place for comparison Appendix A - SAR Test Exclusion Thresholds for 100 MHz - 6 GHz and < 50 mm MHz 5 10 15 20 25 30 35 40 45 50 mm 150 39 77 116 155 194 232 271 310 349 387 SAR Test Exclusion Thresholds (mW) 300 27 55 82 110 137 164 192 219 246 274 450 22 45 67 89 112 134 157 179 201 224 835 16 33 49 66 82 98 115 131 148 164 900 16 32 47 63 79 95 111 126 142 158 1500 12 24 37 49 61 73 86 98 110 122 1900 11 22 33 44 54 65 76 87 98 109 2450 10 19 29 38 48 57 67 77 86 96 3600 8 16 24 32 40 47 55 63 71 79 5200 7 13 20 26 33 39 46 53 59 66 5400 6 13 19 26 32 39 45 52 58 65 5800 6 12 19 25 31 37 44 50 56 62 Report No.: BTL-FCCP-3-2510C297 Report Version: R00 Page 4 of 4 2. TABLE FOR FILED ANTENNA Ant. Brand Model Name Antenna Type Connector Gain (dBi) 1 RAZER RZ01-0569 chip N/A 4.75 Note: The antenna gain is provided by the manufacturer. 3. TEST RESULTS Function Frequency (MHz) Max. Output Power (dBm) Max. Tune-up Power (dBm) Max. Tune-up Power (mW) Exclusion Thresholds Limit Result BLE 2402 3.15 3.15 2.0654 0.6402 7.5 SAR Test Exclusion 2.4G SRD 2404 2.99 2.99 1.9907 0.6173 7.5 SAR Test Exclusion Note: 1. No SAR evaluation required since transmitter power is below FCC threshold. 2. 2.4G SRD and LE can not simultaneous transmission. 3. This product is for use on the limbs only. End of Test Report
Report No.: BTL-OTA-1-2510C297 Report Version: R00 Page 1 of 15 ANT Test Report Antenna Type: Chip antenna Report No.: BTL-OTA-1-2510C297 Report Version: R00 Page 2 of 15 Project No. : 2510C297 Product Type : Wireless Mouse Brand Name : RAZER, Test Model : RZ01-0569 Date of Receipt : 2026-01-04 Date of Test : 2026-01-04 Issued Date : 2026-01-08 Applicant : Razer Inc. Address : 9 Pasteur, Irvine, CA 92618, USA Manufacturer : RAZER (ASIA-PACIFIC) PTE. LTD. Address : Razer SEA HQ, 1 One-north Crescent, #02-01, Singapore 138538 The above equipment has been tested and found compliance with the requirement of the relative standards by BTL Inc. (Dongguan) Prepared by : James Huang Approved by : Steven Lu No.3, Jinshagang 1st Road, Dalang, Dongguan, Guangdong People’s Republic of China. Tel: +86-769-8318-3000 Web: www.newbtl.com Service mail: [email protected] Report No.: BTL-OTA-1-2510C297 Report Version: R00 Page 3 of 15 Table of Contents REVISION HISTORY ....................................................................................................... 4 1 . PHYSICAL LAYOUT AND SITE DESCRIPTION ....................................................... 6 1.1 WIRELESS MOBILE DEVICE TEST LABORATORY .......................................................................... 6 1.2 ANECHOIC CHAMBER ........................................................................................................................ 6 1.3 MULTI AXIS POSITIONING SYSTEM (MAPS™) ................................................................................ 6 1.4 QUIET ZONE ........................................................................................................................................ 7 1.5 EMCO MODEL 3165-01 ABSORBER NESTED DUAL-POLARIZED DUAL-VIVALDI ARRAY ANTENNA 7 1.6 EMCO-3102 CIRCULARLY POLARIZED COMMUNICATION ANTENNAS ....................................... 7 1.7 TEST FACILITY .................................................................................................................................... 7 1.8 TEST EQUIPMENT .............................................................................................................................. 7 1.9 EMQUEST SOFTWARE ....................................................................................................................... 7 2 . TEST EQUIPMENT LIST .......................................................................................... 13 2.1 TEST EQUIPMENT USED FOR MEASURING .................................................................................. 13 3 . PHOTOGRAPH ........................................................................................................ 15 3.1 EUT SETUP PHOTO .......................................................................................................................... 15 Report No.: BTL-OTA-1-2510C297 Report Version: R00 Page 4 of 15 REVISION HISTORY Report No. Version Description Issued Date Note BTL-OTA-1-2510C297 R00 Original Report. 2026-01-08 Valid Report No.: BTL-OTA-1-2510C297 Report Version: R00 Page 5 of 15 Declaration BTL represents to the client that testing is done in accordance with standard procedures as applicable and that test instruments used has been calibrated with standards traceable to international standard(s) and/or national standard(s). BTL's reports apply only to the specific samples tested under conditions. It is manufacture’s responsibility to ensure that additional production units of this model are manufactured with the identical electrical and mechanical components. BTL assumes no responsibility for the data provided by the customer, any statements, inferences or generalizations drawn by the customer or others from the reports issued by BTL. This report is the confidential property of the client. As a mutual protection to the clients, the public and ourselves, the test report shall not be reproduced, except in full, without our written approval. BTL is not responsible for the sampling stage, so the results only apply to the sample as received. The information, data and test plan are provided by manufacturer which may affect the validity of results, so it is manufacturer’s responsibility to ensure that the apparatus meets the essential requirements of applied standards and in all the possible configurations as representative of its intended use. Limitation For the use of the authority's logo is limited unless the Test Standard(s)/Scope(s)/Item(s) mentioned in this test report is (are) included in the conformity assessment authorities acceptance respective. Please note that the measurement uncertainty is provided for informational purpose only and are not use in determining the Pass/Fail results. Report No.: BTL-OTA-1-2510C297 Report Version: R00 Page 6 of 15 1. PHYSICAL LAYOUT AND SITE DESCRIPTION 1.1 WIRELESS MOBILE DEVICE TEST LABORATORY All tests were performed in BTL Inc. state-of-the-art Wireless Mobile Device Test Laboratory consisting of a rectangular anechoic chamber equipped with a multi-axis positioning system (MAPS), a dual polarized quad- ridge waveguide horn, and two EMCO-3102 circularly polarized communication antennas. A base station simulator is used to establish communication with the EUT and place it in the proper mode, and a spectrum analyzer and RF switch combination is used for measuring the signal from the EUT at each position and polarization. BTL Inc.’s EMQuest EMQ-100 Pattern Measurement Software is used for data acquisition, post- processing, and generation of the required output. 1.2 ANECHOIC CHAMBER The anechoic chamber is a rectangular anechoic chamber designed and built by ETS-Lindgren with the following nominal dimensions。 Length: 5.1 m (200 in) Width: 5.1 m (200 in) Height: 5.1 m (200 in) The anechoic chamber consists of a shielded enclosure constructed of rigid, steel-clad, wood core modular panels with steel framing. The chamber is treated with ETS-Lindgren’s microwave absorber, utilizing both pyra…
Text truncated - open the document above for the full version.
Report No.: BTL-OTA-1-2510C297 Report Version: R00 Page 15 of 15 3. PHOTOGRAPH 3.1 EUT SETUP PHOTO Free Space _ Front Face Free Space _ Front Face End of Test Report
Report No.: BTL-FCCP-1-2510C297 Report Version: R00 Page 1 of 60 FCC Radio Test Report FCC ID: RWO-RZ010569 This report concerns: Original Grant Project No. : 2510C297 Equipment : Wireless Mouse Brand Name : RAZER, Model Name : RZ01-0569, RZ01-0569XXXX-XXXX (X can be 0-9 or A-Z) Applicant : Razer Inc. Address : 9 Pasteur, Irvine, CA 92618, USA Manufacturer : RAZER (ASIA-PACIFIC) PTE. LTD. Address : Razer SEA HQ, 1 One-north Crescent, #02-01, Singapore 138538 Factory : RAZER TECHNOLOGY AND DEVELOPMENT (SHENZHEN) CO., LTD Address : East Wing, 3rd Floor, Block 2, Phase 1 of Vision Shenzhen Business Park Keji South Road, Hi-Tech Industrial Park, Shenzhen 518057, China Date of Receipt : Oct. 30, 2025 Date of Test : Oct. 31, 2025 ~ Jan. 20, 2026 Issued Date : Jan. 29, 2026 Test Sample : Engineering Sample No.: DG92025122351 for power, DG920251030152 for conducted, DG92025103151 & DG92025122350 for radiated. Standard(s) : FCC CFR Title 47, Part 15, Subpart C The above equipment has been tested and found compliance with the requirement of the relative standards by BTL Inc. (Dongguan). Prepared by : Chella Zheng Approved by : Chay Cai No.3, Jinshagang 1st Road, Dalang, Dongguan, Guangdong People’s Republic of China Te l : + 8 6-769-8318-3000 Web: www.newbtl.com Service mail: [email protected] Report No.: BTL-FCCP-1-2510C297 Report Version: R00 Page 2 of 60 Declaration BTL represents to the client that testing is done in accordance with standard procedures as applicable and that test instruments used has been calibrated with standards traceable to international standard(s) and/or national standard(s). BTL's reports apply only to the specific samples tested under conditions. It is manufacture’s responsibility to ensure that additional production units of this model are manufactured with the identical electrical and mechanical components. BTL assumes no responsibility for the data provided by the customer, any statements, inferences or generalizations drawn by the customer or others from the reports issued by BTL. The report must not be used by the client to claim product certification, approval, or endorsement by A2LA or any agency of the U.S. Government. This report is the confidential property of the client. As a mutual protection to the clients, the public and ourselves, the test report shall not be reproduced, except in full, without our written approval. BTL’s laboratory quality assurance procedures are in compliance with the ISO/IEC 17025: 2017 requirements, and accredited by the conformity assessment authorities listed in this test report. BTL is not responsible for the sampling stage, so the results only apply to the sample as received. The information, data and test plan are provided by manufacturer which may affect the validity of results, so it is manufacturer’s responsibility to ensure that the apparatus meets the essential requirements of applied standards and in all the possible configurations as representative of its intended use. Limitation For the use of the authority's logo is limited unless the Test Standard(s)/Scope(s)/Item(s) mentioned in this test report is (are) included in the conformity assessment authorities acceptance respective. Please note that the measurement uncertainty is provided for informational purpose only and are not use in determining the Pass/Fail results. Report No.: BTL-FCCP-1-2510C297 Report Version: R00 Page 3 of 60 Table of Contents Page REVISION HISTORY 6 1 . APPLICABLE STANDARDS 7 2 . SUMMARY OF TEST RESULTS 7 2.1 TEST FACILITY 8 2.2 MEASUREMENT UNCERTAINTY 8 2.3 TEST ENVIRONMENT CONDITIONS 9 3 . GENERAL INFORMATION 10 3.1 GENERAL DESCRIPTION OF EUT 10 3.2 DESCRIPTION OF TEST MODES 11 3.3 PARAMETERS OF TEST SOFTWARE 11 3.4 BLOCK DIAGRAM SHOWING THE CONFIGURATION OF SYSTEM TESTED 12 3.5 SUPPORT UNITS 12 3.6 CUSTOMER INFORMATION DESCRIPTION 12 4 . AC POWER LINE CONDUCTED EMISSIONS 13 4.1 LIMIT 13 4.2 TEST PROCEDURE 13 4.3 DEVIATION FROM TEST STANDARD 13 4.4 TEST SETUP 14 4.5 EUT OPERATING CONDITIONS 14 4.6 TEST RESULTS 14 5 . RADIATED EMISSIONS 15 5.1 LIMIT 15 5.2 TEST PROCEDURE 16 5.3 DEVIATION FROM TEST STANDARD 17 5.4 TEST SETUP 17 5.5 EUT OPERATING CONDITIONS 19 5.6 TEST RESULT - 9 KHZ TO 30 MHZ 19 5.7 TEST RESULT - 30 MHZ TO 1000 MHZ 19 5.8 TEST RESULT - ABOVE 1000 MHZ 19 6 . BANDWIDTH 20 6.1 LIMIT 20 Report No.: BTL-FCCP-1-2510C297 Report Version: R00 Page 4 of 60 Table of Contents Page 6.2 TEST PROCEDURE 20 6.3 DEVIATION FROM STANDARD 20 6.4 TEST SETUP 20 6.5 EUT OPERATION CONDITIONS 20 6.6 TEST RESULTS 20 7 . MAXIMUM OUTPUT POWER 21 7.1 LIMIT 21 7.2 TEST PROCEDURE 21 7.3 DEVIATION FROM STANDARD 21 7.4 TEST SETUP 21 7.5 EUT OPERATION CONDITIONS 21 7.6 TEST RESULTS 21 8 . CONDUCTED SPURIOUS EMISSION 22 8.1 LIMIT 22 8.2 TEST PROCEDURE 22 8.3 DEVIATION FROM STANDARD 23 8.4 TEST SETUP 23 8.5 EUT OPERATION CONDITIONS 23 8.6 TEST RESULTS 23 9 . POWER SPECTRAL DENSITY 24 9.1 LIMIT 24 9.2 TEST PROCEDURE 24 9.3 DEVIATION FROM STANDARD 24 9.4 TEST SETUP 24 9.5 EUT OPERATION CONDITIONS 24 9.6 TEST RESULTS 24 10 . MEASUREMENT INSTRUMENTS LIST 25 APPENDIX A - AC POWER LINE CONDUCTED EMISSIONS 27 APPENDIX B - RADIATED EMISSION - 9 KHZ TO 30 MHZ 28 APPENDIX C - RADIATED EMISSION - 30 MHZ TO 1000 MHZ 33 APPENDIX D - RADIATED EMISSION - ABOVE 1000 MHZ 36 APPENDIX E - BANDWIDTH 51 Report No.: BTL-FCCP-1-2510C297 Report Version: R00 Page 5 of 60 Table of Contents Page APPENDIX F - MAXIMUM OUTPUT POWER 54 APPENDIX G - CONDUCTED SPURIOUS EMISSION 56 APPENDIX H - POWER SPECTRAL DENSITY 59 Report No.: BTL-FCCP-1-2510C297 Report Version: R00 Page 6 of 60 REVISION HISTORY Report No. Version Description Issued Date Note BTL-FCCP-1-2510C297 R00 Original Report. Jan. 29, 2026 Valid Report No.: BTL-FCCP-1-2510C297 Report Version: R00 Page 7 of 60 1. APPLICABLE STANDARDS According to the specifications of the manufacturer, the EUT must comply with the requirements of the following standard: ANSI C63.10-2020 The following reference test guidance is not within the scope of accre…
Text truncated - open the document above for the full version.
Report No.: BTL-FCCP-2-2510C297 Report Version: R00 Page 1 of 53 FCC Radio Test Report FCC ID: RWO-RZ010569 This report concerns: Original Grant Project No. : 2510C297 Equipment : Wireless Mouse Brand Name : RAZER, Model Name : RZ01-0569, RZ01-0569XXXX-XXXX (X can be 0-9 or A-Z) Applicant : Razer Inc. Address : 9 Pasteur, Irvine, CA 92618, USA Manufacturer : RAZER (ASIA-PACIFIC) PTE. LTD. Address : Razer SEA HQ, 1 One-north Crescent, #02-01, Singapore 138538 Factory : RAZER TECHNOLOGY AND DEVELOPMENT (SHENZHEN) CO., LTD Address : East Wing, 3rd Floor, Block 2, Phase 1 of Vision Shenzhen Business Park Keji South Road, Hi-Tech Industrial Park, Shenzhen 518057, China Date of Receipt : Oct. 30, 2025 Date of Test : Oct. 31, 2025 ~ Jan. 20, 2026 Issued Date : Jan. 29, 2026 Test Sample : Engineering Sample No.: DG92025122351 for power, DG920251030152 for conducted, DG92025103151 & DG92025122350 for radiated. Standard(s) : FCC CFR Title 47, Part 15, Subpart C The above equipment has been tested and found compliance with the requirement of the relative standards by BTL Inc. (Dongguan). Prepared by : Chella Zheng Approved by : Chay Cai No.3, Jinshagang 1st Road, Dalang, Dongguan, Guangdong People’s Republic of China Te l : + 8 6-769-8318-3000 Web: www.newbtl.com Service mail: [email protected] Report No.: BTL-FCCP-2-2510C297 Report Version: R00 Page 2 of 53 Declaration BTL represents to the client that testing is done in accordance with standard procedures as applicable and that test instruments used has been calibrated with standards traceable to international standard(s) and/or national standard(s). BTL's reports apply only to the specific samples tested under conditions. It is manufacture’s responsibility to ensure that additional production units of this model are manufactured with the identical electrical and mechanical components. BTL assumes no responsibility for the data provided by the customer, any statements, inferences or generalizations drawn by the customer or others from the reports issued by BTL. The report must not be used by the client to claim product certification, approval, or endorsement by A2LA or any agency of the U.S. Government. This report is the confidential property of the client. As a mutual protection to the clients, the public and ourselves, the test report shall not be reproduced, except in full, without our written approval. BTL’s laboratory quality assurance procedures are in compliance with the ISO/IEC 17025: 2017 requirements, and accredited by the conformity assessment authorities listed in this test report. BTL is not responsible for the sampling stage, so the results only apply to the sample as received. The information, data and test plan are provided by manufacturer which may affect the validity of results, so it is manufacturer’s responsibility to ensure that the apparatus meets the essential requirements of applied standards and in all the possible configurations as representative of its intended use. Limitation For the use of the authority's logo is limited unless the Test Standard(s)/Scope(s)/Item(s) mentioned in this test report is (are) included in the conformity assessment authorities acceptance respective. Please note that the measurement uncertainty is provided for informational purpose only and are not use in determining the Pass/Fail results. Report No.: BTL-FCCP-2-2510C297 Report Version: R00 Page 3 of 53 Table of Contents Page REVISION HISTORY 6 1 . APPLICABLE STANDARDS 7 2 . SUMMARY OF TEST RESULTS 7 2.1 TEST FACILITY 8 2.2 MEASUREMENT UNCERTAINTY 8 2.3 TEST ENVIRONMENT CONDITIONS 9 3 . GENERAL INFORMATION 10 3.1 GENERAL DESCRIPTION OF EUT 10 3.2 DESCRIPTION OF TEST MODES 11 3.3 PARAMETERS OF TEST SOFTWARE 11 3.4 BLOCK DIAGRAM SHOWING THE CONFIGURATION OF SYSTEM TESTED 12 3.5 SUPPORT UNITS 12 3.6 CUSTOMER INFORMATION DESCRIPTION 12 4 . AC POWER LINE CONDUCTED EMISSIONS 13 4.1 LIMIT 13 4.2 TEST PROCEDURE 13 4.3 DEVIATION FROM TEST STANDARD 13 4.4 TEST SETUP 14 4.5 EUT OPERATING CONDITIONS 14 4.6 TEST RESULTS 14 5 . RADIATED EMISSIONS 15 5.1 LIMIT 15 5.2 TEST PROCEDURE 16 5.3 DEVIATION FROM TEST STANDARD 17 5.4 TEST SETUP 17 5.5 EUT OPERATING CONDITIONS 19 5.6 TEST RESULT - 9 KHZ TO 30 MHZ 19 5.7 TEST RESULT - 30 MHZ TO 1000 MHZ 19 5.8 TEST RESULT - ABOVE 1000 MHZ 19 6 . BANDWIDTH 20 6.1 LIMIT 20 Report No.: BTL-FCCP-2-2510C297 Report Version: R00 Page 4 of 53 Table of Contents Page 6.2 TEST PROCEDURE 20 6.3 DEVIATION FROM STANDARD 20 6.4 TEST SETUP 20 6.5 EUT OPERATION CONDITIONS 20 6.6 TEST RESULTS 20 7 . MAXIMUM OUTPUT POWER 21 7.1 LIMIT 21 7.2 TEST PROCEDURE 21 7.3 DEVIATION FROM STANDARD 21 7.4 TEST SETUP 21 7.5 EUT OPERATION CONDITIONS 21 7.6 TEST RESULTS 21 8 . CONDUCTED SPURIOUS EMISSION 22 8.1 LIMIT 22 8.2 TEST PROCEDURE 22 8.3 DEVIATION FROM STANDARD 23 8.4 TEST SETUP 23 8.5 EUT OPERATION CONDITIONS 23 8.6 TEST RESULTS 23 9 . POWER SPECTRAL DENSITY 24 9.1 LIMIT 24 9.2 TEST PROCEDURE 24 9.3 DEVIATION FROM STANDARD 24 9.4 TEST SETUP 24 9.5 EUT OPERATION CONDITIONS 24 9.6 TEST RESULTS 24 10 . MEASUREMENT INSTRUMENTS LIST 25 APPENDIX A - AC POWER LINE CONDUCTED EMISSIONS 27 APPENDIX B - RADIATED EMISSION - 9 KHZ TO 30 MHZ 28 APPENDIX C - RADIATED EMISSION - 30 MHZ TO 1000 MHZ 33 APPENDIX D - RADIATED EMISSION - ABOVE 1000 MHZ 36 APPENDIX E - BANDWIDTH 46 Report No.: BTL-FCCP-2-2510C297 Report Version: R00 Page 5 of 53 Table of Contents Page APPENDIX F - MAXIMUM OUTPUT POWER 48 APPENDIX G - CONDUCTED SPURIOUS EMISSION 50 APPENDIX H - POWER SPECTRAL DENSITY 52 Report No.: BTL-FCCP-2-2510C297 Report Version: R00 Page 6 of 53 REVISION HISTORY Report No. Version Description Issued Date Note BTL-FCCP-2-2510C297 R00 Original Report. Jan. 29, 2026 Valid Report No.: BTL-FCCP-2-2510C297 Report Version: R00 Page 7 of 53 1. APPLICABLE STANDARDS According to the specifications of the manufacturer, the EUT must comply with the requirements of the following standard: ANSI C63.10-2020 The following reference test guidance is not within the scope of accre…
Text truncated - open the document above for the full version.
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.40 GHz - 2.48 GHz | 2.10 mW |
| 2 | 15C | 2.40 GHz - 2.48 GHz | 2.00 mW |
Gaming Controller
Equipment Class
DTS - Digital Transmission SystemGaming Mouse
Equipment Class
DTS - Digital Transmission SystemGaming Chair
Equipment Class
DTS - Digital Transmission SystemWireless Dongle
Equipment Class
DTS - Digital Transmission SystemWireless Charger
Equipment Class
DCD - Part 15 Low Power Transmitter Below 1705 kHz