FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Legrand AV Inc./
  3. W59VAD50909

W59VAD50909Venture VideoBAR

Legrand AV Inc.

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Sep 04, 2024
Application Purpose
Original Equipment
Date of Application
Sep 04, 2024
Equipment Note
Venture VideoBAR
Frequency Range
2402.00000000 - 2480.00000000
Company
Legrand AV Inc.
Country
United States

Documents & Files

Select a file to view

Attestation Statements

↗
↗

Cover Letter(s)

↗
↗

ID Label/Location Info

↗

RF Exposure Info

↗

Test Report

↗
↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Attestation Statements

1/1 US Agent for Service of Process LETTER OF ATTESTATION TO: Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 US Agent for Service of Process: Company Name: Legrand AV Inc. FRN: 0018526590 Contact Name: Vaughn Staheli Address: 6436 City West Pkwy, Eden Prairie MN 55344, United States Telephone No: 801-822-5465 Email: [email protected] Applicant: Company name: Legrand AV Inc. Product Description: Venture VideoBAR Grantee code: W59 FCC ID: W59VAD50909 FRN: 0018526590 Contact Name: Vaughn Staheli Address: 6436 City West Pkwy, Eden Prairie MN 55344, United States Telephone No: 801-822-5450 Email: [email protected] Legrand AV Inc. certifies that, as of the date of this filing of the application with the TCB, Legrand AV Inc. is our designated US agent for service of process for the above referenced FCC ID. Legrand AV Inc. accepts to maintain an agent for no less than one year after the grantee has terminated all marketing and importation or the conclusion of any commission related proceeding involving equipment. Legrand AV Inc. accepts, as of the date of the filing of the application, the obligation of the designated US agent for service of process for the above reference FCC ID. The US Agent for Service of Process is aware of and agrees to comply with the requirements outlined in the FCC Equipment Authorization Program, Report and Order FCC 22-84, and clause § 2.911. The Applicant is aware of and agrees to comply with the requirements outlined in the FCC Equipment Authorization Program, Report and Order FCC 22-84, and clause § 2.911. 1/1 Date: 06/08/2024 Applicant’s Name: Vaughn Staheli US Agent’s Name: Vaughn Staheli Title: Senior Director of Engineering Title: Senior Director of Engineering Signature Signature

Attestation Statements

C5266091_X24_Ed.2 1/1 “Attestation Statements” TO: Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 The Commission adopted rules that prohibit equipment authorization for “covered” telecommunications equipment and video surveillance equipment produced by entities identified on the Commission’s Covered List 1 , which is periodically updated. See the Covered List for more details. This Attestation Statement is to confirm that we follow the Section 2.911(d)(5)(i)-(ii) Applicant Company name: Legrand AV Inc. W59 Grantee code: FCC ID: FRN: Contact Name: Address: Telephone No: Fax No: Email: W59VAD50909 0018526590 Vaughn Staheli 6436 City West Pkwy, Eden Prairie MN 55344, United States 801-822-5450 801-822-5460 [email protected] i.[Legrand AV Inc.] (“the applicant”) certifies that the equipment for which authorization is sought is not “covered” equipment prohibited from receiving an equipment authorization pursuant to section 2.903 of the FCC rules. The applicant must sign this certification. ii.[Legrand AV Inc.] (“the applicant”) certifies that, as of the date of the filing of the application, the applicant is not (as a specifically named entity or any of its subsidiaries or affiliates) identified on the Covered List as an entity producing “covered” equipment. The applicant must sign this certification. Legrand AV Inc. dcertifies that, as of the date of the filing of the application, the applicant is not identified on the Covered List as an entity producing “covered” equipment. Date: 06/08/2024 Applicant’s Name: Vaughn Staheli Title: Sr Director Engineering Signature 1 The Commission’s Covered List is published by the Public Safety and Homeland Security Bureau and posted on the Commission’s website. This Covered List, which is periodically updated, identifies particular equipment, produced by particular entities, that constitutes “covered” equipment. https://www.fcc.gov/supplychain/coveredlist

Cover Letter(s)

C5266091_X8_Ed.1 1/1 Letter of Authorization < Legrand AV Inc.> Company: Legrand AV Inc. Address: 6436 City West Pkwy, Eden Prairie MN 55344, United States Product Name: Venture VideoBAR Model Number: 999-50909-000 FCC Identifier: W59VAD50909 We authorize LGAI Technological Center S.A., Ronda de la Font delCarme, s/n, 08193 Bellaterra, Spain, to act on our behalf on all matters concerning the above named equipment. Any individual within LGAI Technological Center S.A. is authorized to act on our behalf and take action on the application. We declare that authorize LGAI Technological Center S.A., Ronda de la Font del Carme, s/n, 08193 Bellaterra, Spain, is allowed to forward all information related to the approval project to the Federal Communication Commission and to discuss any issues concerning the approval application. Any and all acts carried out by LGAI Technological Center S.A. on our behalf shall have the same effect as acts of our own. Name: Vaughn Staheli Date: 06/08/2024 Title: Senior Director of Engineering Signature of applicant:

Cover Letter(s)

C5266091_X10_Ed.2 1/1 < Legrand AV Inc. > Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046Date: 06/08/2024 Subject: Request for Confidentiality FCC ID: W59VAD50909 To Whom It May Concern, Pursuant to the provisions of Sections 0.457 and 0.459 of Commission's rules (47CFR0.457, 0.459), we are requesting the Commission to withhold the following attachment(s) as confidential document from public disclosure. Exhibits Long-Term Confidentiality Short-Term Confidentiality NOTE 2 ID Label/Location No No Attestation Statement No No External Photos No Block Diagram ☐ Schematics ☐ Test Report No No Test Setup Photos No User’s Manual ☐ NOTE 1 Internal Photos ☐ NOTE 1 Parts List / Tune Up / BOM List ☐ RF Exposure Info No No Operational Description ☐ Cover Letter(s) No No SOFTWARE SECURITY REQUIREMENTS FOR U- NII DEVICES No No NOTE 1: Long-Term Confidentiality may be permitted under special conditions (See II. LONG-TERM CONFIDENTIALITY, Section 3 of KDB 726920, use last in force) NOTE 2: Short-Term Confidentiality can be requested for a maximum of 180 days from the date of the grant. Above mentioned document contains detailed system and equipment description are considered as proprietary information in operation of the equipment. The public disclosure of above documents might be harmful to our company and would give competitor an unfair advantage in the market. In case of short-term Confidentiality, the applicant requests the exhibits selected above are withheld from public view for a period of _180_ days from the date of the Grant of Equipment Authorization and prior to marketing. C5266091_X10_Ed.2 1/1 It is our understanding that all measurement test reports, FCC ID label format and correspondent during certification review process cannot be granted as confidential documents and those information will be available for public review once the grant of equipment authorization is issued. Sincerely, Signature: Name: Vaughn Staheli Title: Senior Director of Engineering

ID Label/Location Info

Length: 52.5mm Width: 36mm

RF Exposure Info

FCC ID: W59VAD50909 KDB447498 D01 General RF Exposure Guidance v06 Maximum Permissible Exposure (MPE) According to FCC 1.1310: The criteria listed in the following table shall be used to evaluate the environment impact of human exposure to radio frequency(RF) Radiation as specified in §1.1307(b) Limits for Maximum Permissible Exposure (MPE) MPE Calculation Method E (V/m) = d GP**30 Power Density: Pd (W/m²) = 377 2 E E = Electric field (V/m) P = Average RF output power (W) G = EUT Antenna numeric gain (numeric) d = Separation distance between radiator and human body (m) The formula can be changed to Pd = 2 *377 **30 D GP From the EUT RF output power, the minimum mobile separation distance, d=0.2m, as well as the gain of the used antenna, the RF power density can be obtained. BT: Measurement Result Operation Frequency: 2402MHz~2480MHz Power density limited: 1mW/ cm 2 Antenna Type:PCB antenna Antenna gain: 2dBi; R=20cm mW=10^(dBm/10) antenna gain Numeric=10^(dBi/10)= 10^(2/10)=1.58 Channel Freq. (MHz) modulation conducted pow er Tune-up pow er (dBm) MaxAntenna Evaluation result Pow er density Limits (dBm) tune-up pow erGain (mW/cm2 )(mW/cm2) (dBm)(mW)(dBi)Numeric 2.2912.001.58 0.00071 2.2912.001.58 0.00071 2.2912.001.58 0.00071 3.5482.001.58 0.00111 3.5482.001.58 0.00111 3.5482.001.58 0.00111 3.9812.001.58 0.00131 3.9812.001.58 0.00131 3.9812.001.58 0.00131 2402 DH5 3.583.6 24412.843.6 24801.653.6 2402 2DH5 5.35.5 24414.865.5 24803.565.5 2402 3DH5 5.765±16 24415.345±16 24804.295±16 2.6±1 2.6±1 2.6±1 4.5±1 4.5±1 4.5±1 BLE: Measurement Result Operation Frequency: 2402MHz~2480MHz Power density limited: 1mW/ cm 2 Antenna Type:PCB antenna Antenna gain: 2dBi; R=20cm mW=10^(dBm/10) antenna gain Numeric=10^(dBi/10)= 10^(2/10)=1.58 Channel Freq. (MHz) modulation conducted pow er Tune-up pow er (dBm) MaxAntenna Evaluation result Pow er density Limits (dBm) tune-up pow erGain (mW/cm2 )(mW/cm2) (dBm)(mW)(dBi)Numeric 1.5852.001.58 0.00051 1.5852.001.58 0.00051 1.5852.001.58 0.00051 1.5852.001.58 0.00051 1.5852.001.58 0.00051 1.2592.001.58 0.00041 2402 BLE1M 2 24402 24802 2402 BLE2M 2 24402 24801 1.041±1 0.41±1 1.571±1 1.141±1 0.61±1 -0.640±1 Conclusion: For the max result : 0.0013≤ 1.0 for Max Power Density, compliance RF exposure.. Signature: Date: 2024-06- 07 NAME AND TITLE (Please print or type): alex li/Manager COMPANY (Please print or type): Shenzhen NTEK Testing Technology Co., Ltd./ 1/F, Building E, Fenda Science Park, Sanwei Community, Xixiang Street Bao’an District, Shenzhen P.R. China.

Test Report

ShenZhen Feasycom Technology Co.,Ltd www.feasycom.com -1- Bluetooth antenna specification 1,Index Item Content Page Remark 1 Index 1 2 Spec Drawing 2 3 Specification 2 4 Antenna On Test Board 3 5 Return Loss 3 6 Radiation Pattern 3 Document Type: 2.4GHZ PCB antenna Document Version: V1.0 Release Date: 2019-10-21 ShenZhen Feasycom Technology Co.,Ltd Telephone: 86-755-27924639 www.feasycom.com ShenZhen Feasycom Technology Co.,Ltd www.feasycom.com -2- 2,Spec Drawing Unit:mm ShenZhen Feasycom Technology Co.,Ltd www.feasycom.com -3- 3,Specification Product Number: 2.4GHZ FPC antenna Sample Photo: A. Electrical Characteristics Frequency 2400 ~ 2500 MHz S.W.R. <=2.0 Gain 2.0 dBi Efficiency ~ 40% Polarization Linear Impedance 50 Ohm B. Material & Mechanical Characteristics Material of Radiator copper C. Environmental Operation Temperature - 40°C ~ + 85°C Storage Temperature - 40°C ~ + 105°C 4,Antenna On Test Board ShenZhen Feasycom Technology Co.,Ltd www.feasycom.com -4- 5, Return Loss 6,Radiation Pattern Radiation Pattern and Gain were dependent on measurement board design. The specification of coil antenna was measur ed based on the PCB size and installation position as shown in the below figure Test Board. ShenZhen Feasycom Technology Co.,Ltd www.feasycom.com -5- Vertical Horizontal Y -ZPlane Average Gain=1.86dBi Peak Gain= -1.37 dBi Average Gain= - 4 Peak Gain = 1.98dBi Average Gain = 0.71 dBi.6 dBi X - Z Plane Average Gain=-2.91dBi Peak Gain= -3.76 dBi Average Gain= -8.72dBi Peak Gain= -0.25 dBi Average Gain= -4.24 dBi X - Y Plane Average Gain=-0.95 dBi Peak Gain= 0.76 dBi Average Gain= -5.81dBi Peak Gain= 1.37 dBi Average Gain= -2.67 dBi 2450 2450 2450

Test Report

Report No.: S24030703504002 Version.1.3 Page 1 of 79 RADIO TEST REPORT FCC ID: W59VAD50909 Product: Venture VideoBAR Trade Mark: Model No.: 999-50909-000 Family Model: N/A Report No.: S24030703504002 Issue Date: Jun 07, 2024 Prepared for Legrand AV Inc. 6436 City West Pkwy, Eden Prairie MN 55344, United States Prepared by Shenzhen NTEK Testing Technology Co., Ltd. 1/F, Building E, Fenda Science Park, Sanwei Community, Xixiang Street Bao’an District, Shenzhen 518126 P.R. China Tel. 400-800-6106, 0755-2320 0050, 0755-2320 0090 Website: http://www.ntek.org.cn Report No.: S24030703504002 Version.1.3 Page 2 of 79 TABLE OF CONTENTS 1 TEST RESULT CERTIFICATION ...................................................................................................................... 4 2 SUMMARY OF TEST RESULTS ......................................................................................................................... 5 3 FACILITIES AND ACCREDITATIONS ............................................................................................................. 6 3.1 FACILITIES..................................................................................................................................................... 6 3.2 LABORATORY ACCREDITATIONS AND LISTINGS ................................................................................. 6 3.3 MEASUREMENT UNCERTAINTY ............................................................................................................... 6 4 GENERAL DESCRIPTION OF EUT .................................................................................................................. 7 5 DESCRIPTION OF TEST MODES ..................................................................................................................... 9 6 SETUP OF EQUIPMENT UNDER TEST ......................................................................................................... 10 6.1 BLOCK DIAGRAM CONFIGURATION OF TEST SYSTEM ..................................................................... 10 6.2 SUPPORT EQUIPMENT ............................................................................................................................... 12 6.3 EQUIPMENTS LIST FOR ALL TEST ITEMS .............................................................................................. 13 7 TEST REQUIREMENTS .................................................................................................................................... 15 7.1 CONDUCTED EMISSIONS TEST ............................................................................................................... 15 7.1.1 Applicable Standard .................................................................................................................................. 15 7.1.2 Conformance Limit ................................................................................................................................... 15 7.1.3 Measuring Instruments ............................................................................................................................. 15 7.1.4 Test Configuration .................................................................................................................................... 15 7.1.5 Test Procedure ........................................................................................................................................... 15 7.1.6 Test Results ................................................................................................................................................ 16 7.2 RADIATED SPURIOUS EMISSION ............................................................................................................ 18 7.2.1 Applicable Standard .................................................................................................................................. 18 7.2.2 Conformance Limit ................................................................................................................................... 18 7.2.3 Measuring Instruments ............................................................................................................................. 19 7.2.4 Test Configuration .................................................................................................................................... 19 7.2.5 Test Procedure ........................................................................................................................................... 20 7.2.6 Test Results ................................................................................................................................................ 21 7.3 6DB BANDWIDTH ....................................................................................................................................... 27 7.3.1 Applicable Standard .................................................................................................................................. 27 7.3.2 Conformance Limit ................................................................................................................................... 27 7.3.3 Measuring Instruments ............................................................................................................................. 27 7.3.4 Test Setup .................................................................................................................................................. 27 7.3.5 Test Procedure ........................................................................................................................................... 27 7.3.6 Test Results ................................................................................................................................................ 27 7.4 DUTY CYCLE ......................................................................................................................…

Text truncated - open the document above for the full version.

Contact Information

Applicant

Vaughn Staheli(Senior Director, Engineering)
[email protected]801-822-5465Fax: 801-822-5460

Technical Contact

Shenzhen NTEK Testing Technology Co., Ltd.Alex Li
[email protected]+86-755-6115 6588

Shenzhen · China

Non-Technical Contact

Shenzhen NTEK Testing Technology Co., Ltd.Alex Li
[email protected]+86-755-6115 6588

Test Firm

Shenzhen NTEK Testing Technology Co., Ltd.Alex Li
[email protected]+86-755-6115-9384

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.40 GHz - 2.48 GHz1.44 mW
Confidentiality
Long Term
Grant Notes
Output power listed is conducted.The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 20 cm from all persons. End-users must be provided with operating procedures for satisfying RF exposure compliance.

Other Applications from Legrand AV Inc.

AC1300 Dual-Band Outdoor Wireless Access Point - FCC ID W59AP3025 - Legrand AV Inc.
W59AP3025

AC1300 Dual-Band Outdoor Wireless Access Point

Jan 08, 2023

Equipment Class

DTS - Digital Transmission System
Epic Mesh Node - FCC ID W59MN10 - Legrand AV Inc.
W59MN10

Epic Mesh Node

Mar 05, 2020

Equipment Class

DSS - Part 15 Spread Spectrum Transmitter
High Power AC1900 Dual-Band Wireless AP - FCC ID W59XAP1510 - Legrand AV Inc.
W59XAP1510

High Power AC1900 Dual-Band Wireless AP

Sep 24, 2015

Equipment Class

NII - Unlicensed National Information Infrastructure TX
High Power Wireless 300N Outdoor AP - FCC ID W59XAP1240 - Legrand AV Inc.
W59XAP1240

High Power Wireless 300N Outdoor AP

Aug 20, 2015

Equipment Class

DTS - Digital Transmission System
Standard Power Wireless 300N Low Profile Access Point - FCC ID W59XAP310 - Legrand AV Inc.
W59XAP310

Standard Power Wireless 300N Low Profile Access Point

Feb 09, 2015

Equipment Class

DTS - Digital Transmission System