FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Andrew Wireless System/
  3. XS5-IONM7785P

XS5-IONM7785PLTE MIMO 850MHz CDMA/WCDMA multi-operator Remote Unit

Andrew Wireless System
LTE MIMO 850MHz CDMA/WCDMA multi-operator Remote Unit - FCC ID XS5-IONM7785P - Andrew Wireless System
Click to zoom

Application Details

Equipment Class
TNB - Licensed Non-Broadcast Station Transmitter
Date of Grant
Feb 24, 2011
Application Purpose
Original Equipment
Date of Application
Feb 24, 2011
Equipment Note
LTE MIMO 850MHz CDMA/WCDMA multi-operator Remote Unit
Frequency Range
746.00000000 - 757.00000000
Company
Andrew Wireless System
Country
Germany

Documents & Files

Select a file to view

Cover Letter(s)

↗
↗
↗

External Photos

↗

ID Label/Location Info

↗

RF Exposure Info

↗

Test Report

↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Cover Letter(s)

Installation instruction The Remote and the Master Unit has to be mounted by a professional/ special trained installer.

External Photos

External Pictures

ID Label/Location Info

Label location

RF Exposure Info

RF Exposure Info / MPE Sample Calculation Model: ION‐M7P/7P/85P FCC‐ID: XS5‐IONM7785P The ION‐M7P/7P/85P is a fibre optic based RF repeater for wireless applications. A RF signal is converted to an optical signal by directly modulation a laser. The optical signal of the two 700MHz path is converted back to RF, double converted, amplified and broadcast from an antenna or into a passive RF distribution system, such as radiating cable. The optical signal of the 850MHz path is converted back to RF, amplified and broadcast from an antenna or into a passive RF distribution system, such as radiating cable. The incoming RF signal gets the same way back: 700MHz ‐> DPx ‐> Amplifier ‐> DFC (Conve rsion Module) ‐> optical signal 850MHz ‐> DPx ‐> Amplifier –> optical signal The System includes a double frequency conversion through a conversion module. The specific device generally will be professionally installed. Hereby the gain of the finally installed antenna(s), cable attenuation and antenna height will be defined site specific at the time of licensing with the appropriate FCC Bureau(s). The maximum permissible exposure limit is defined in 47 CFR 1.1310 (B). Limits for General Population / Uncontrolled Exposures Frequency Range (MHz) Power Density (mW/cm 2 ) 300 – 1500 f/1500 The Repeater operates in the frequency range of 728 – 757 MHz and 869 – 894MHz, so that the worst case Power Density Limit is 728/1500 = 0,48533 W/m 2 . The max measured conducted output power is: ‐ max composite output power based on one carrier (rated) per path: 20W (43.0dBm) The maximum permitted level is to be calculated using general equation: S = P*G/4πR 2 P = 20W; G = antenna‐cable attenuation to be defined (numeric gain); π = 3,1416 The min separation distance between the antenna and any human body is to be calculated (solving for R in cm) with the final actual antenna gain/cable attenuation where the limit of 0,48533 mW/cm 2 is kept. The antenna(s) used with device must be fixed‐mounted on permanent structures with a distance to any human body to comply with the RF Exposure limit.

Test Report

Test Site: FCC Test Site No.: 96997 IC OATS No.: IC3475A-1 The test report shall not be reproduced except in full ECL-EMC Test Report No.: 11-037 Equipment under test: ION-M7P/7P/85P 700MHz Path 2 XS5-IONM7785P FCC ID: 2237E-IONM7785P IC ID: FCC 47 CFR Part 27 Subpart H, F, :2009 Miscellaneous Wireless Communication Services IC RSS-131:2003 Zone Enhancers for the Land Mobile Service Type of test: Measurement Procedures: 47 CFR Parts 2:2009 (Frequency Allocations and Radio Treaty Matters; General Rules and Regulations), Part 27:2009 (Miscellaneous Wireless Communication Services), ANSI/TIA-603-C:2004, Land Mobile FM or PM Communications Equipment Measurement and Performance Standards IC-GEN:2007 General Requirements and Information for the Certification of Radiocommunication Equipment Test result: Passed Date of issue: 10.02.11 Signature: Issue-No.: 01 Author: T. Zahlmann Test engineer Date of delivery: 10.02.11 Checked: M. Lehmann EMV-Leiter Head of EMC without the written approval of the testing laboratory. ECL-EMC-TR-11-037-V01.00 Page 1 of 31 Test dates: 09.02.11 Pages: 31 Test Report No.: FCC ID: XS5-IONM7785P IC ID: 2237E-IONM7785P The test report shall not be reproduced except in full ANDREW Wireless Systems GmbH Manufacturer: Industriering 10 D-86675 Buchdorf Tel.: +49 (0)9099 69 0 Fax: +49 (0)9099 69 140 Test Location: TEMPTON Service Plus GmbH European Compliance Laboratory (ECL) Thurn-und-Taxis-Straße 18 D-90411 Nürnberg Tel.: +49 (0) 911 59835 0 Fax: +49 (0) 911 59835 90 General: General: The purpose of this report is to show compliance to the FCC regulations for devices operating under Part 27 of the Code of Federal Regulations title 47. The purpose of this report is to show compliance to the FCC regulations for devices operating under Part 27 of the Code of Federal Regulations title 47. This report informs about the results of the EMC tests, it only refers to the equipment under test. No part of this report may be reproduced in any form, without written permission. This report informs about the results of the EMC tests, it only refers to the equipment under test. No part of this report may be reproduced in any form, without written permission. without the written approval of the testing laboratory. ECL-EMC-TR-11-037-V01.00 Page 2 of 31 Test Report No.: FCC ID: XS5-IONM7785P IC ID: 2237E-IONM7785P The test report shall not be reproduced except in full without the written approval of the testing laboratory. ECL-EMC-TR-11-037-V01.00 Page 3 of 31 Table of contents 1 TEST RESULTS SUMMARY .................................................................................................................5 2 EQUIPMENT UNDER TEST (E.U.T.) ....................................................................................................6 2.1 DESCRIPTION....................................................................................................................................6 2.1.1 DOWNLINK.................................................................................................................................6 2.1.2 UPLINK......................................................................................................................................6 2.1.3 DESCRIPTION OF EUT ................................................................................................................6 2.1.4 SYSTEM DIAGRAM OF EUT .........................................................................................................7 2.1.5 BLOCK DIAGRAM OF MEASUREMENT REFERENCE POINTS..............................................................8 3 TEST SITE (ANDREW BUCHDORF) ....................................................................................................9 3.1 TEST ENVIRONMENT..........................................................................................................................9 3.2 TEST EQUIPMENT..............................................................................................................................9 3.3 INPUT AND OUTPUT LOSSES...............................................................................................................9 3.4 MEASUREMENT UNCERTAINTY............................................................................................................9 4 TEST SITE (TEMPTON) ......................................................................................................................10 5 RF POWER OUT: §27.50, §2.1046; RSS-131, RSS-GEN ..................................................................11 5.1 LIMIT...............................................................................................................................................11 5.2 TEST METHOD.................................................................................................................................11 5.3 TEST RESULTS................................................................................................................................12 5.3.1 DOWNLINK...............................................................................................................................12 5.3.1.1 LTE 728 – 746MHz, MAIN..............................................................................................13 5.3.1.2 LTE 746 – 757MHz, MAIN..............................................................................................13 5.3.2 UPLINK....................................................................................................................................14 5.4 SUMMARY TEST RESULT...................................................................................................................14 6 OCCUPIED BANDWIDTH: §90.210, §2.1049; RSS-GEN...................................................................15 6.1 LIMIT...............................................................................................................................................15 6.2 TEST ME…

Text truncated - open the document above for the full version.

Test Report

Test Site: FCC Test Site No.: 96997 IC OATS No.: IC3475A-1 The test report shall not be reproduced except in full ECL-EMC Test Report No.: 11-038 Equipment under test: ION-M7P/7P/85P 850MHz Path XS5-IONM7785P FCC ID: 2237E-IONM7785P IC ID: FCC 47 CFR Part 22 Subpart H:2009 Cellular Radiotelephone Service RSS-Gen:2007, RSS-131:2005 Cellular Telephones Employing New Technologies Operating in the Bands 824-849 MHz and 869-894 MHz Type of test: Measurement Procedures: 47 CFR Parts 2:2009 (Frequency Allocations and Radio Treaty Matters; General Rules and Regulations), Part 22:2009 (Miscellaneous Wireless Communication Services), ANSI/TIA-603-C:2004, Land Mobile FM or PM Communications Equipment Measurement and Performance Standards IC-GEN:2007 General Requirements and Information for the Certification of Radiocommunication Equipment Test result: Passed Date of issue: 10.02.11 Signature: Issue-No.: 01 Author: T. Zahlmann Test engineer Date of delivery: 10.02.11 Checked: M. Lehmann EMV-Leiter Head of EMC without the written approval of the testing laboratory. ECL-EMC-TR-11-038-V01.00 Page 1 of 38 Test dates: 09.02.11 Pages: 38 Test Report No.: FCC ID: XS5-IONM7785P IC ID: 2237E-IONM7785P The test report shall not be reproduced except in full ANDREW Wireless Systems GmbH Manufacturer: Industriering 10 D-86675 Buchdorf Tel.: +49 (0)9099 69 0 Fax: +49 (0)9099 69 140 Test Location: TEMPTON Service Plus GmbH European Compliance Laboratory (ECL) Thurn-und-Taxis-Straße 18 D-90411 Nürnberg Tel.: +49 (0) 911 59835 0 Fax: +49 (0) 911 59835 90 General: General: The purpose of this report is to show compliance to the FCC regulations for devices operating under Part 22 of the Code of Federal Regulations title 47. The purpose of this report is to show compliance to the FCC regulations for devices operating under Part 22 of the Code of Federal Regulations title 47. This report informs about the results of the EMC tests, it only refers to the equipment under test. No part of this report may be reproduced in any form, without written permission. This report informs about the results of the EMC tests, it only refers to the equipment under test. No part of this report may be reproduced in any form, without written permission. without the written approval of the testing laboratory. ECL-EMC-TR-11-038-V01.00 Page 2 of 38 Test Report No.: FCC ID: XS5-IONM7785P IC ID: 2237E-IONM7785P The test report shall not be reproduced except in full without the written approval of the testing laboratory. ECL-EMC-TR-11-038-V01.00 Page 3 of 38 Table of contents 1 TEST RESULTS SUMMARY .................................................................................................................5 2 EQUIPMENT UNDER TEST (E.U.T.) ....................................................................................................6 2.1 DESCRIPTION....................................................................................................................................6 2.1.1 DOWNLINK.................................................................................................................................6 2.1.2 UPLINK......................................................................................................................................6 2.1.3 DESCRIPTION OF EUT ................................................................................................................6 2.1.4 SYSTEM DIAGRAM OF EUT .........................................................................................................7 2.1.5 BLOCK DIAGRAM OF MEASUREMENT REFERENCE POINTS..............................................................8 3 TEST SITE (ANDREW BUCHDORF) ....................................................................................................9 3.1 TEST ENVIRONMENT..........................................................................................................................9 3.2 TEST EQUIPMENT..............................................................................................................................9 3.3 INPUT AND OUTPUT LOSSES...............................................................................................................9 3.4 MEASUREMENT UNCERTAINTY............................................................................................................9 4 TEST SITE (TEMPTON) ......................................................................................................................10 5 RF POWER OUT: §22.913, §2.1046; RSS-131, RSS-GEN ................................................................11 5.1 LIMIT...............................................................................................................................................11 5.2 TEST METHOD.................................................................................................................................11 5.3 TEST RESULTS................................................................................................................................12 5.3.1 DOWNLINK...............................................................................................................................13 5.3.1.1 GSM................................................................................................................................14 5.3.1.2 EDGE..............................................................................................................................14 5.3.1.3 CDMA .............................................................................................................................15 5.3.1.4 W-CDMA.........................................................................................................................15 5.3.2 UPLINK....................................................................................................................................16 5.4 SUMMARY TEST RESULT.................................................…

Text truncated - open the document above for the full version.

Test Setup Photos

External Pictures Figure 1. EUT ION-M7P/7P Figure 2. Measurement Equipment and Remote Unit Figure 3. Test setup: Field Strength Emission <1 GHz @3m in the FAC Figure 3. Test setup: Field Strength Emission >1 GHz @3m in the FAC

Contact Information

Applicant

Jiri Cecka(Manager Quality)
[email protected]+420606620263Fax: +49-9099-69930

Test Firm

Bureau Veritas Consumer Products Services GermanyMario Lehmann
[email protected]49-40-74041-2702Fax: 49-175-575-4778

Technical Specifications

#Rule PartsFrequency RangePower OutputEmissionTolerance
527746 MHz - 757 MHz20.42 WG7DAmp
Confidentiality
Long Term
Grant Notes
The antenna(s)used for this transmitter (repeater) must be fixed-mounted on indoor or outdoor permanent structures. RF exposure compliance is addressed at the time of licensing, as required by the responsible FCC Bureau(s), including antenna co-location requirements of �1.1307(b)(3).

Other Applications from Andrew Wireless System

CAP H2 34T/37T F-AC-F1, CAP H2 34T/37T F-DC-F1 - FCC ID XS5-H23437HP - Andrew Wireless System
XS5-H23437HP

CAP H2 34T/37T F-AC-F1, CAP H2 34T/37T F-DC-F1

Apr 10, 2026

Equipment Class

B2I - Part 20 Industrial Booster (CMRS)
Era Repeater for cellular systems - FCC ID XS5-CAPM2343737 - Andrew Wireless System
XS5-CAPM2343737

Era Repeater for cellular systems

Dec 14, 2023

Equipment Class

B2I - Part 20 Industrial Booster (CMRS)
ERA L2 Radio Module - FCC ID XS5-RML2BDOD - Andrew Wireless System
XS5-RML2BDOD

ERA L2 Radio Module

Oct 25, 2023

Equipment Class

B2I - Part 20 Industrial Booster (CMRS)
Era Repeater for cellular systems (DAS - Remote Unit) - FCC ID XS5-CAPL2CBAND - Andrew Wireless System
XS5-CAPL2CBAND

Era Repeater for cellular systems (DAS - Remote Unit)

Dec 14, 2022

Equipment Class

B2I - Part 20 Industrial Booster (CMRS)
ERA L2 Radio Module - FCC ID XS5-RML2B25 - Andrew Wireless System
XS5-RML2B25

ERA L2 Radio Module

Sep 28, 2022

Equipment Class

B2I - Part 20 Industrial Booster (CMRS)