
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
DATE : Sep 06, 2013 Nemko Canada Inc 303 River Road Ottawa, Ontario, Canada K1V 1H2 Attn: Director of Certification Authority to Act as Agent On our behalf, I appoint _ Shenzhen BATT Testing Technology Co., Ltd. 11F, Bldg.B, Xinbaoyuan, Xinanhu Commercial city, Bao’an District, Shenzhen, Guangdong, China _, to act as our agent in the preparation of this application for equipment certification. I certify that submitted documents properly describe the device or system for which equipment certification is sought. I also certify that each unit manufactured, imported or marketed, as defined in the Federal Communications Commission’s regulations will have affixed to it a label identical to that submitted for approval with this application. For instances where our authorized agent signs the application for certification on our behalf, I acknowledge that all responsibility for complying with the terms and conditions for certification, as specified by Nemko Canada Inc, still resides with ZMODO Technology Corp. Ltd./ 17F, Finance Technology Building, 11 Keyuan Road, Hi-Tech Park, Nanshan District, Shenzhen, China Dated this Sep 06, 2013 Agency agreement expiration date: Usually Give 8 - 12 Months By: Aaron Yang Signature Printed Title: Manager On behalf of : ZMODO Technology Corp. Ltd. Telephone: 86-755-33926029
DATE : Sep 06, 2013 Equipment Autorisation Division Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 FCC ID: ZK8-IBI13-W Product Name: IP-CAM Request for Confidentiality Pursuant to Sections 0.457 and 0.459 of the commissions rules, we hereby request that the following documents be held confidential: • Schematics • Block diagram • Operational Description These materials contain trade secrets and proprietary information and are not customarily released to the public. The public disclosure of this information might be harmful to the company and provide unjustified benefits to our competitors. Dated this Sep 06, 2013 Agency agreement expiration date: Usually Give 8 - 12 Months By: Aaron Yang Signature Printed Title: Manager On behalf of : ZMODO Technology Corp. Ltd. Telephone: 86-755-33926029
ZMODO Technology Corp. Ltd. 17F, Finance Technology Building, 11 Keyuan Road, Hi-Tech Park, Nanshan District, Shenzhen, P.R.China Statement We ZMODO Technology Corp. Ltd. Hereby that The product IP-CAM, Models No. ZP-IBI13-W, ZP-IBH13-W, ZP-IBI03-W, ZP-IDP1D-W are all identical in interior structure, electrical circuits and components, and just model names are different for the marketing requirement. Your assistance on this matter is highly appreciated. Yours sincerely, Signature: Company Name: ZMODO Technology Corp. Ltd.
Photo 1 Photo 2 Photo 3 Photo 4 Photo 5 Photo 6 Page 4 of 14 Photo 24 (Power Supply) Photo 26 (Power Supply) Photo 27 (Power Supply)
Mark Location: FCC ID Label Location
Photo 7 Photo 8 Photo 9 Photo 10 Photo 11 Photo 12 Photo 13 Photo 14 Photo 15 Photo 16 Photo 17 Photo 18 Photo 19 Photo 20 Photo 21 Photo 22 Photo 23
Maximum Permissible Exposure Applicable Standard Systems operating under the provisions of this section shall be operated in a manner that ensures that the public is not exposed to radio frequency energy level in excess limit for maximum permissible exposure. In accordance with 47 CFR FCC Part 2 Subpart J, section 2.1091 this device has been defined as a mobile device whereby a distance of 0.2m normally can be maintained between the user and the device. (a) Limits for Occupational / Controlled Exposure Frequency Range (MHz) Electric Field Strength (E) (V/m) Magnetic Field Strength (H) (A/m) Power Density (S) (mW/cm 2 ) Averaging Times︱E︱ 2 , ︱H︱ 2 or S (minutes) 0.3-3.0 614 1.63 (100)* 6 3.0-30 1842/f 4.89/f (900/f)* 6 30-300 61.4 0.163 1.0 6 300-1500 F/300 6 1500-100000 5 6 (b) Limits for General Population / Uncontrolled Exposure Frequency Range (MHz) Electric Field Strength (E) (V/m) Magnetic Field Strength (H) (A/m) Power Density (S) (mW/cm 2 ) Averaging Times︱E︱ 2 , ︱H︱ 2 or S (minutes) 0.3-1.34 614 1.63 (100)* 30 1.34-30 824/f 2.19/f (180/f)* 30 30-300 27.5 0.073 0.2 30 300-1500 F/1500 30 1500-100000 1.0 30 Note: f=frequency in MHz; *Plane-wave equivalent power density MPE Calculation Method E (V/m) = (30*P*G) 0.5 /d Power Density: Pd (W/m 2 ) = E 2 /377 E = Electric Field (V/m) P = Peak RF output Power (W) G = EUT Antenna numeric gain (numeric) d = Separation distance between radiator and human body (m) The formula can be changed to Pd = (30*P*G) / (377*d 2 ) From the peak EUT RF output power, the minimum mobile separation distance, d=0.2m, as well as the gain of the used antenna, the RF power density can be obtained. Calculated Result and Limit Antenna Gain: 2.5dBi Antenna Gain (Numeric) Peak Output Power (dBm) Peak Output Power (mW) Power Density (S) (mW/cm 2 ) Limit of Power Density (S) (mW/cm 2 ) Test Result 1.778 15.64 36.64 0.013 1 Compiles Note: the worse case was recorded.
Shenzhen BATT Testing Technology Co., Ltd. Report No.: BATT201309050 FCC Page 1 of 104 FCC TEST REPORT Prepared For : ZMODO Technology Corp. Ltd. Product Name: IP-CAM Model : ZP-IBI13-W, ZP-IBH13-W, ZP-IBI03-W, ZP-IDP1D-W Prepared By : Shenzhen BATT Testing Technology Co., Ltd. 11F, Bldg.B, Xinbaoyuan, Xinanhu Commercial city, Bao’an District, Shenzhen, Guangdong, China. Tel: 86-755-27753991 Fax: 86-755-27754182 Test Date: August 26 to Sep 09, 2013 Date of Report : Sep 11, 2013 Report No.: BATT201309050FCC Note: This report shall not be reproduced except in full, without the written approval of Shenzhen BATT Testing Technology Co., Ltd. This document may be altered or revised by Shenzhen BATT Testing Technology Co., Ltd. personnel only, and shall be noted in the revision section of the document. The test results in the report only apply to the tested sample Shenzhen BATT Testing Technology Co., Ltd. Report No.: BATT201309050FCC Page 2 of 104 TABLE OF CONTENTS 1.0 TEST CERTIFICATION............................................................................... 3 2.0 Test Equipment......................................................................................... 5 3.0 Technical Details........................................................................................ 6 4.0 Test Lab Details......................................................................................... 6 5.0 Power Line Conducted Emission Test............................................................ 7 5.1 Schematics of the Test................................................................................ 7 5.2 Test Method and Test Procedure................................................................... 7 5.3 Configuration of the EUT............................................................................ 7 5.4 EUT Operating Condition............................................................................ 8 5.5 Conducted Emission Limit........................................................................... 8 5.6 Test Result................................................................................................ 8 6.0 Radiated Emission test................................................................................ 11 6.1 Test Method and Test Procedure................................................................... 11 6.2 Configuration of the EUT............................................................................. 11 6.3 EUT Operation Condition............................................................................ 11 6.4 Radiated Emission Limit.............................................................................. 12 7.0 6dB Bandwidth Measurement....................................................................... 36 8.0 Maximum Peak Output Power...................................................................... 54 9.0 Power Spectral Density Measurement........................................................... 57 10.0 Out of Band Measurement.......................................................................... 76 11.0 Antenna Requirement................................................................................ 87 12.0 FCC ID Label............................................................................................ 88 13.0 Photo of Test Setup and EUT View................................................................ 89 Shenzhen BATT Testing Technology Co., Ltd. Report No.: BATT201309050FCC Page 3 of 104 1 TEST CERTIFICATION Product: IP-CAM Model:ZP-IBI13-W, ZP-IBH13-W, ZP-IBI03-W, ZP-IDP1D-W Applicant: ZMODO Technology Corp. Ltd. 1201 Sangda Building High Technology Park Shenzhen, P.R.China Factory: ZMODO Technology Corp. Ltd. 1201 Sangda Building High Technology Park Shenzhen, P.R.China Trade Mark: ZMODO Tested:August 26 to Sep 09, 2013 Test Voltage: DC12V Powered by power supply Operational Frequency Range: EEE 802.11b/g, 802.11n HT20: 2412-2462MHz IEEE 802.11n HT40 : 2422MHz-2452MHz Modulation Type: IEEE 802.11b : DSSS (CCK, DQPSK, DBPSK) IEEE 802.11g : OFDM (64QAM, 16AQM, QPSK, BPSK) IEEE 802.11n HT20/40 : OFDM (64QAM, 16QAM, QPSK, BPSK) Channel Spacing IEEE 802.11b/g/n: 5MHz Air Data Rate IEEE 802.11b : 11, 5.5, 2, 1 Mbps IEEE 802.11g : 54, 48, 36, 24, 18, 12, 9, 6 Mbps IEEE 802.11n HT20 : 150, 117 ,104, 78, 65, 58.5, 52, 39, 26, 19.5, 13, 6 Mbps IEEE 802.11n HT40 : 150, 117 ,104, 78, 65, 58.5, 52, 39, 26, 19.5, 13, 6 Mbps Frequency Selection By software Channel Number IEEE 802.11b/g ,802.11n HT20 : 11 Channels IEEE 802.11n HT40 : 7 Channels Antenna: Dipole antenna with Gain 2.5 dBi Power Supply: Model No.: GEO151UB-1215 Input: AC100-240V, 50/60Hz, 0.3A; Output: DC12V, 1.5A FCC ID: ZK8-IBI13-W Applicable Standards: FCC Part 15.247 The test report was prepared by Shenzhen BATT Testing Technology Co., Ltd.and found compliance with the requirements set forth in the technical standards mentioned above. The results of testing in this report apply only to the product/system, which was tested. Other similar equipment will not necessarily produce the same results due to production tolerance and measurement uncertainties. IEEE Shenzhen BATT Testing Technology Co., Ltd. Report No.: BATT201309050FCC Page 4 of 104 Prepared by : Hellen XiaoAssistant Reviewer : Mike Yong/Supervisor Approved & Authorized Signer : Jones Song/ Manager Shenzhen BATT Testing Technology Co., Ltd. Report No.: BATT201309050FCC Page 5 of 104 2.0 Test Equipments Instrument Type Manufacturer Model Serial No. Date of Cal. Due Date ESPI Test Receiver ROHDE&SCHWA RZ ESPI 3 100379 2013-05-27 2014-05-26 EMI Test Receiver Rohde & Schwarz ESU 1302.6005.26 2013-05-27 2014-05-26 Impuls-Begrenzer ROHDE&SCHWA RZ ESH3-Z2 100281 2013-05-27 2014-05-26 Loop Antenna EMCO 6502 00042960 2013-05-27 2014-05-26 ESPI Test Receiver ROHDE&SCHWA RZ ESI26 838786/013 2013-05-27 2014-05-26 3m OATS -- -- N/A 2013-05-27 2014-05-26 Horn Antenna SCHWARZBECK BBHA 9170 BBHA9170399 2013-05-27 2014-0…
Text truncated - open the document above for the full version.
Conducted Emissions Radiated Emissions
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.41 GHz - 2.46 GHz | 36.64 mW |
Hubbell SpectraSAFE
Equipment Class
DTS - Digital Transmission System
Smart doorbell
Equipment Class
DTS - Digital Transmission System
NVR
Equipment Class
DTS - Digital Transmission System
IPC
Equipment Class
DTS - Digital Transmission System
IP-CAM
Equipment Class
DTS - Digital Transmission System