FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. ShenZhen AZW Technology CO.,LTD./
  3. 2A4J2-MATEPRO

2A4J2-MATEPRODocking station

ShenZhen AZW Technology CO.,LTD.

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Apr 21, 2026
Application Purpose
Original Equipment
Equipment Note
Docking station
Frequency Range
2402.00000000 - 2480.00000000
Company
ShenZhen AZW Technology CO.,LTD.
Country
China

Documents & Files

Select a file to view

Attestation Statements

↗
↗
↗

Cover Letter(s)

↗
↗
↗

ID Label/Location Info

↗

RF Exposure Info

↗

Test Report

↗
↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Attestation Statements

Shenzhen AZW Technology Co., Ltd. Attestation Statements Not Covered Entity Applicant & Not Covered Equipment To: Federal Communications Commission Date: Apr. 16, 26 7435 Oakland Mills Road, Columbia, MD 21046, USA Ref: Information Required by Section 2.911(d)(5)(i) & (ii) FCC ID: 2A4J2-MATEPRO Shenzhen AZW Technology Co., Ltd. (“the applicant”) certifies that, as of the date of the filing of the application, the applicant is not identified on the Covered List, established pursuant to § 1.50002 of reference chapter, as an entity producing “covered” communication equipment. The equipment for which authorization is sought is not “covered” telecommunications equipment and video surveillance equipment produced by entities identified on the Commission’s Covered List that prohibited from receiving an equipment authorization pursuant to section § 2.903 of the FCC rules. Sincerely yours, Applicant Signature Printed Name: Shenzhen AZW Technology Co., Ltd. Title: manager Address: 701, Building 8, Hengda Shishang Huigu, next to Fulong Road, Shanghenglang Community,Dalang Street, Longhua District, ShenZhen, China Tel.: 13425140941 Email: [email protected]

Attestation Statements

Shenzhen AZW Technology Co., Ltd. 1 | P a g e Attestation Statements To: Federal Communications Commission Date: Apr. 16, 26 7435 Oakland Mills Road, Columbia, MD 21046, USA Subject: Attestation of Compliance with FCC Covered List Software Requirements FCC ID: [2A4J2-MATEPRO] Product Name: [Docking station] This letter serves as an attestation that the equipment identified above ☐ is / ☒ is not (select one) "covered" software as defined under the Federal Communications Commission (FCC) Covered List requirements, as outlined in FCC 22-84 and KDB 986446. Specifically, the undersigned certifies that the equipment for which authorization is sought: 1. Does not contain cybersecurity or anti-virus software produced or provided by Kaspersky Lab, Inc. or any of its successors, assignees, parents, subsidiaries, affiliates, or any entity that has rebranded or relabeled software produced by the aforementioned entities. 2. Does not have the capability to store, run, or deliver any software identified on the FCC Covered List, including but not limited to cybersecurity and anti-virus software. To support this attestation, the appendix evaluation documentation has been prepared and is included in the certification filing. This attestation is based on a thorough evaluation of the device's design, functionality, and software environment. The undersigned affirms that the information provided is accurate and complete to the best of their knowledge. Sincerely yours, Applicant Signature Printed Name: Shenzhen AZW Technology Co., Ltd. Title: manager Address: 701, Building 8, Hengda Shishang Huigu, next to Fulong Road, Shanghenglang Community,Dalang Street, Longhua District, ShenZhen, China Tel.: 13425140941 Email: [email protected] Shenzhen AZW Technology Co., Ltd. 2 | P a g e Evaluation regarding to the Covered List Software: Compliance Methodology Evaluation Process Results Device is Inherent compliance ☒ The Chipset(s) used is limited to run the Cybersecurity or anti-virus software. Compliance ☒ The Memory used is limited to run the Cybersecurity or anti-virus software. Compliance ☒ There is storage capacity limitation for store or install the Cybersecurity or anti-virus software. Compliance ☒ Operating system used is limited to run, install or deliver the Cybersecurity or anti-virus software. Compliance Device is not Inherent compliance ☐ Evaluation Based on Software Bill of Materials (SBoM) See attached “SBoM“ Note:The SBoM content is limited to the scope of covered list software (e.g. antivirus and cybersecurity software). ☐ Evaluation Based on Scan for Software on the device ☐ Evaluation Based on Filesystem scan ☐ Evaluation Based on Running software check SBOM (Software Bill of Materials) Section Component Name Version Supplier 1

Attestation Statements

1/1 US Agent for Service of Process LETTER OF ATTESTATION TO: Office of Engineering Technology Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 US Agent for Service of Process: Company name: HOPEK CORPORATION INC FRN: 0034562900 Contact Name: Yangyang Xu Address: 16755 Coyote Bush Dr Unit 84, San Diego, CA 92127 United States Telephone No: 561-875-9826 Email: [email protected] Applicant: Company name: Shenzhen AZW Technology Co., Ltd. Grantee Code: 2A4J2 FCC ID: 2A4J2-MATEPRO FRN: 0031976178 Contact Name: Jerry Huang Address: 701, Building 8, Hengda Shishang Huigu, next to Fulong Road, Shanghenglang Community,Dalang Street, Longhua District, ShenZhen, China Telephone No: 13425140941 Fax No: / Email: [email protected] Shenzhen AZW Technology Co., Ltd. certifies that, as of the date of this filing of the application with the TCB, [HOPEK CORPORATION INC] is our designated US agent for service of process for the above referenced FCC ID. Shenzhen AZW Technology Co., Ltd. accepts to maintain an agent for no less than one year after the grantee has terminated all marketing and importation or the conclusion of any commission related proceeding involving equipment. [HOPEK CORPORATION INC] accepts, as of the date of the filing of the application, the obligation of the designated US agent for service of process for the above reference FCC ID. The US Agent for Service of Process is aware of and agrees to comply with the requirements outlined in the FCC Equipment Authorization Program, Report and Order FCC 22-84, and clause § 2.911. The Applicant is aware of and agrees to comply with the requirements outlined in the FCC Equipment Authorization Program, Report and Order FCC 22-84, and clause § 2.911. Date: 2026-04-16 Applicant’s Name: Jerry Huang US Agent’s Name: Yangyang Xu Title: manager Title: manager Signature: Signature:

Cover Letter(s)

Shenzhen AZW Technology Co., Ltd. Family models declaration letter. Date: April 16, 2026 We Shenzhen AZW Technology Co., Ltd. Of 701, Building 8, Hengda Shishang Huigu, next to Fulong Road, Shanghenglang Community,Dalang Street, Longhua District, ShenZhen, China Product: Docking station FCC ID: 2A4J2-MATEPRO Model Name: Mate Pro Serial:Mate Pro X Difference description of series models: Except for the model name, color, and sales area, all models have the same circuit and RF module Thanks Sincerely Signature Name: Jerry Huang Date: 04.16, 2026 Title: manager

Cover Letter(s)

Shenzhen AZW Technology Co., Ltd. Apr 16, 2026 Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Subject: Confidentiality Request for: 2A4J2-MATEPRO Pursuant to Sections 0.457 and 0.459 of the Commission’s Rules, we hereby request permanent confidential treatment of the exhibits accompanying this certification application as outlined below : Block Diagram Schematics Operational Description The above exhibits contain trade secrets and/or proprietary information that are not publicly available and materials that the Applicant has spent considerable efforts in developing. Public disclosure of these may be harmful to the Applicant and give an unfair advantage to competitors on the market. Pursuant to DA 04-1705, the applicant also requests temporary confidential treatment of the exhibits outlined below for a period of (up to 180) days from the date of equipment authorization and prior to marketing in the United States to prevent the premature release of any sensitive information. Applicant is aware of their responsibility to notify DERYCOM in the event information regarding the product or the product is made available to the public before the requested period has expired. User Manual Internal Photos External Photos Test Setup Photos Sincerely, Title: manager Address: 701, Building 8, Hengda Shishang Huigu, next to Fulong Road, Shanghenglang Community,Dalang Street, Longhua District, ShenZhen, China Tel.: 13425140941 Email: [email protected]

Cover Letter(s)

Shenzhen AZW Technology Co., Ltd. Apr 16, 2026 Federal Communications Commission Authorization and Evaluation Division 7435 Oakland Mills Road Columbia, MD 21046 Subject: Agent Authorization for FCC ID: 2A4J2-MATEPRO I, the undersigned, hereby authorize Shenzhen ETR Standard Technology Co., Ltd. to act on our behalf in all matters relating to this application for equipment certification. Any act carried out by Shenzhen ETR Standard Technology Co., Ltd. shall have the same effect as our own and I acknowledge that all responsibility for complying with the terms and conditions of certification, as specified by DERYCOM CERTIFICATION SERVICES, INC., still resides with Shenzhen AZW Technology Co., Ltd. We certify that we are not subject to a denial of federal benefits that includes FCC benefits pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. §862, and that no party to the application, as defined in 47 CFR §1.2002(b), is subject to a denial of federal benefits that includes FCC benefits pursuant to that section. Sincerely, Title:manager Tel: 13425140941 Fax: / Email: [email protected]

ID Label/Location Info

50mm*30mm

RF Exposure Info

FCC ID: 2A4J2-MATEPRO RF Exposure Evaluation Limits According to47 CFR Part 2.1091 and 447498 D01 General RF Exposure Guidance v06 The criteria listed in the following table shall be used to evaluate the environment impact of human exposure to radio frequency (RF) radiation as specified in 1.1307(b) Limits for Maximum Permissible Exposure (MPE) Frequency range (MHz) Electric field strength (V/m) Magnetic field strength (A/m) Power density (mW/cm 2 ) Averaging time (minutes) (A) Limits for Occupational/Controlled Exposures 0.3–3.0 614 1.63 *(100) 6 3.0–30 1842/f 4.89/f *(900/f 2 ) 6 30–300 61.4 0.163 1.0 6 300–1500 f/300 6 1500–100,000 5 6 (B) Limits for General Population/Uncontrolled Exposure 0.3–1.34 614 1.63 *(100) 30 1.34–30 824/f 2.19/f *(180/f 2 ) 30 30–300 27.5 0.073 0.2 30 300–1500 f/1500 30 1500–100,000 1.0 30 f = frequency in MHz Friis transmission formula: Pd = (Pout*G)/(4*pi*r 2 ) Where Pd = power density in mW/cm 2 , Pout = output power to antenna in mW; G = gain of antenna in linear scale, Pi = 3.1416; R = distance between observation point and center of the radiator in cm Pd id the limit of MPE, 1 mW/cm 2 . If we know the maximum gain of the antenna and the total power input to the antenna, through the calculation, we will know the distance r where the MPE limit is reached. Test Procedure Software provided by client enabled the EUT to transmit and receive data at lowest, middle and highest channel individually. FCC ID: 2A4J2-MATEPRO Test Result of RF Exposure Evaluation The source of the evaluation data results is based on the test report ET-26030927E01/02 BLE/BT Antenna gain=-1.14dBi FOR BLE Mode Output power (dBm) Tune-up power (dBm) Max Tune-up (dBm) Max Tune-up (mW) Numeric antenna gain Power Density at R=20cm (mW/cm2) Limit (mW/cm2) Result GFSK 1.19 1±1 2 1.58 0.77 0.0002 1.0 PASS FOR BT Mode Output power (dBm) Tune-up power (dBm) Max Tune-up (dBm) Max Tune-up (mW) Numeric antenna gain Power Density at R=20cm (mW/cm2) Limit (mW/cm2) Result GFSK 1.14 1±1 2 1.58 0.77 0.0002 1.0 PASS π/4-DQPSK 1.89 2±1 3 2.00 0.77 0.0003 1.0 PASS Maximum power density=0.0003<1. Then SAR evaluation is not require .

Test Report

Passive parameters of antenna Dimensional Test Report A ntenna size diagram This document is a confidential d ocument of Dongguan Meijin Communication Technology Co., Ltd. and cannot be disclosed. Dongguan Meijin Communication Technology Co., Ltd. has full interpretation rights over the content of the document

Test Report

Report No.: ET-26030927E01 This test report is valid for the tested samples only. It cannot be reproduced except in full without prior written consent of Shenzhen ETR Standard Technology Co., Ltd. TEST REPORT Applicant: Shenzhen AZW Technology Co., Ltd. Address of Applicant: 701, Building 8, Hengda Shishang Huigu, next to Fulong Road, Shanghenglang Community,Dalang Street, Longhua District, ShenZhen, China Manufacturer: Shenzhen AZW Technology Co., Ltd. Address of Manufacturer: 701, Building 8, Hengda Shishang Huigu, next to Fulong Road, Shanghenglang Community,Dalang Street, Longhua District, ShenZhen, China Product Name: Docking station Model No.: Mate Pro, Mate Pro X Trade Mark: Beelink FCC ID: 2A4J2-MATEPRO Applicable standards: CFR Title 47 Part 15.247 Date of Test: Mar.18, 202- Apr.14, 2026 Date of report issued: Apr.15, 2026 Remark: The results shown in this test report refer only to the sample(s) tested, this test report cannot be reproduced, except in full without prior written permission of the company. The report would be invalid without specific stamp of test institute and the signatures of compiler and approver Prepared By Shenzhen ETR Standard Technology Co., Ltd. Address: No.103, No.10, Phase I, Zone 3, Xinxing Industrial Park, Xinhe, Fuhai Street, Bao'an District, Shenzhen, Guangdong, China Compiled by: Reviewed by: Approved by: Project Engineer Project Manager Authorized Signature - Page 2 of 33 - Report No.: ET-26030927E01 Tel:(86-755) 85259392 Email:[email protected] Web: www.etrlab.cn No.103, No.10, Phase I, Zone 3, Xinxing Industrial Park, Xinhe, Fuhai Street, Bao'an District, Shenzhen, Guangdong, China Report Revision History Report No. Description Issue Date ET-26030927E01 Original Apr.15, 2026 - Page 3 of 33 - Report No.: ET-26030927E01 Tel:(86-755) 85259392 Email:[email protected] Web: www.etrlab.cn No.103, No.10, Phase I, Zone 3, Xinxing Industrial Park, Xinhe, Fuhai Street, Bao'an District, Shenzhen, Guangdong, China Contents Page 1. TEST SUMMARY ......................................................................................................................................4 2. GENERAL INFORMATION .......................................................................................................................5 2.1 GENERAL DESCRIPTION OF EUT .................................................................................................................5 2.2 TEST MODE ................................................................................................................................................7 2.3 DESCRIPTION OF SUPPORT UNITS ...............................................................................................................7 2.4 TEST FACILITY ............................................................................................................................................7 2.5 ADDITIONAL INSTRUCTIONS .........................................................................................................................7 3. TEST INSTRUMENTS LIST ......................................................................................................................8 4. TEST RESULTS AND MEASUREMENT DATA .......................................................................................9 4.1 ANTENNA REQUIREMENT .............................................................................................................................9 4.2 CONDUCTED EMISSIONS ...........................................................................................................................10 4.3 DUTY CYCLE .............................................................................................................................................13 4.4 CONDUCTED OUTPUT POWER ...................................................................................................................15 4.5 6DB BANDWIDTH ......................................................................................................................................16 4.6 POWER SPECTRAL DENSITY ......................................................................................................................18 4.7 BAND EDGES ............................................................................................................................................20 Conducted Emission Method ...................................................................................................................20 Radiated Emission Method ......................................................................................................................22 4.8 SPURIOUS EMISSION .................................................................................................................................24 Conducted Emission Method ...................................................................................................................24 Radiated Emission Method ......................................................................................................................26 5. TEST SETUP PHOTO .............................................................................................................................33 6. EUT CONSTRUCTIONAL DETAILS .......................................................................................................33 - Page 4 of 33 - Report No.: ET-26030927E01 Tel:(86-755) 85259392 Email:[email protected] Web: www.etrlab.cn No.103, No.10, Phase I, Zone 3, Xinxing Industrial Park, Xinhe, Fuhai Street, Bao'an District, Shenzhen, Guangdong, China 1. Test Summary Test Item Section Result Test by Antenna requirement 47CFR part 15.203/15.247 (b)(4) Pass / AC Power Line Conducted Emission 47CFR part 15.207 Pass Jason Huang Conducted Peak Output Power 47CFR part 15.247 (b)(3) Pass Kara Wu 6dB Bandwidth 47CFR part 15.247 (a)(2) Pass Kara Wu Power Spectral Density 47CFR part 15.247 (e) Pass Kara Wu Band Edg…

Text truncated - open the document above for the full version.

Contact Information

Applicant

Jerry Huang
[email protected]Fax: 13528413123

Technical Contact

HOPEK CORPORATION INCYangyang Xu
[email protected]

16755 Coyote Bush Dr Unit 84 · San Diego, California, 92127 · United States

Test Firm

Shenzhen ETR Standard Technology Co., Ltd.Smith Chen
[email protected]

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.40 GHz - 2.48 GHz900.00 µW
Confidentiality
Long Term
Grant Notes
Output power listed is conducted power. The antenna used with this transmitter must be installed to provide a minimum separation distance of at least 20 cm from all persons and must not be co-located or operating in conjunction with any other antenna or transmitter, except in accordance with FCC multi- transmitter product procedures. End-users must be provided with operating procedures for satisfying RF exposure compliance.

Other Applications from ShenZhen AZW Technology CO.,LTD.

2A4J2-GTI

Mini PC

Sep 11, 2024

Equipment Class

DTS - Digital Transmission System
Mini PC - FCC ID 2A4J2-EQ - ShenZhen AZW Technology CO.,LTD.
2A4J2-EQ

Mini PC

Apr 22, 2023

Equipment Class

DTS - Digital Transmission System
mini PC - FCC ID 2A4J2-IPCA - ShenZhen AZW Technology CO.,LTD.
2A4J2-IPCA

mini PC

Feb 13, 2023

Equipment Class

NII - Unlicensed National Information Infrastructure TX
2A4J2-MINIS

Mini PC

Jun 04, 2022

Equipment Class

DTS - Digital Transmission System
Mini PC - FCC ID 2A4J2-S3 - ShenZhen AZW Technology CO.,LTD.
2A4J2-S3

Mini PC

Mar 04, 2022

Equipment Class

NII - Unlicensed National Information Infrastructure TX