
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
Versus Information System Hardware and Wiring Installation Guide VERSUS TECHNOLOGY, INC. 2600 MILLER CREEK ROAD TRAVERSE CITY, MI 49684 (231) 946-5868 www.versustech.com i Copyright 1991 – 2002 Versus Technology, Inc., all rights reserved. This document contains user’s information on technology that is proprietary to Versus Technology, Inc. Permitted transmittal, receipt, or possession of this document does not express license or imply any rights to use, sell, design, or manufacture this information. No reproduction, publication or disclosure of this information, in whole or in part, shall be made without prior written authorization from an officer of Versus Technology, Inc. WARNING! This product is not designed, intended, authorized or warranted for use in any life support or other application where product failure could cause or contribute to personal injury, death, or severe property damage. This product or its systems are covered by one or more of the following U.S. Patents: 4,906,853; 5,017,794; 5,027,314; 5,119,104; 5,276,496; 5,355,222; 5,387,993; 5,548,637; 5,572,195, 6,104,295, 6154139. FCC STATEMENT: Components complying with part 15 of the FCC Rules. Operation is subject to the following two conditions: 1) This device may not cause harmful interference, and 2) this device must accept any interference received, including interference that may cause undesired operation. Modifying or tampering with the transceiver’s or receiver’s internal components can cause a malfunction, invalidate the warranty, and will void your FCC authorization to use these products. Revision date: 8/10/01 iii Contents 1. INTRODUCTION.....................................................................................................................................................1 1.1 Purpose of This Guide...................................................................................................................................1 1.2 Computer System Requirements.................................................................................................................1 1.3 Terms and Definitions....................................................................................................................................1 1.4 Parts List..........................................................................................................................................................2 2. SYSTEM DESCRIPTION.......................................................................................................................................3 2.1 Infrared (IR) Tracking.....................................................................................................................................3 2.2 Radio Frequency (RF) Signals.....................................................................................................................3 2.3 System Hardware Components...................................................................................................................4 3. PLANNING THE INSTALLATION.......................................................................................................................7 3.1 General Steps for Installing a Versus System...........................................................................................8 3.2 Collector and Concentrator Location Planning........................................................................................10 3.3 Sensor Location Planning...........................................................................................................................11 3.4 Use of Unauthorized Components.............................................................................................................14 3.5 List of Materials.............................................................................................................................................15 3.6 List of Tools...................................................................................................................................................15 3.7 Safety and Code Considerations...............................................................................................................15 4. SYSTEM HARDWARE INSTALLATION..........................................................................................................17 4.1 Cable Installation..........................................................................................................................................17 4.2 Sensor Installation........................................................................................................................................18 4.3 Collector and Concentrator Installation.....................................................................................................19 4.4 Connecting Sensors to Collectors..............................................................................................................20 4.5 Communication Room Check.....................................................................................................................21 4.6 Testing RF Sensors......................................................................................................................................26 5. TROUBLESHOOTING GUIDE...........................................................................................................................27 5.1 Badge Battery Replacement.......................................................................................................................28 6. INSTALLATION FORMS.....................................................................................................................................32 Hardware and Wiring Installation Guide 1 1. Introduction 1.1 Purpose of This Guide This document is intended to provide the information required to install the hardware and wiring components of a VIS system. Read this en…
Text truncated - open the document above for the full version.
Versus Technology, Inc. would like product description, block diagram and the schematic held confidential for model number VER-4052. Regards, Robert Wiser Emerging Products Engineer
Test report #0100444F FCC,Subpart C for Model Call Button Tested July 18, 2001 AHD EMC Lab, 92723 M152, Dowagiac, MI 49047, (616) 424-7014 Page 8 of 32 CALL BUTTON/BADGE - COVER VIEW CALL BUTTON/BADGE - UTILITY BOX VIEW Deleted: 1 Inserted: 1 Deleted: 22 Test report #0100444F FCC,Subpart C for Model Call Button Tested July 18, 2001 AHD EMC Lab, 92723 M152, Dowagiac, MI 49047, (616) 424-7014 Page 9 of 32 CALL BUTTON/BADGE - TRANSMIT BOARD UNCOVERED Deleted: 1 Inserted: 1 Deleted: 22
A H D EMC Laboratory 92723 M-152, Dowagiac, MI 49047 USA Phone: (616) 424-7014 www.ahde.com This Report will be on file with AHD to July 18, 2006 Page 1 of 1 EMC Test Report #0100444FE Issued 08/16/01 REGARDING THE FCC PART 15, SUBPART C [15.231E] TRANSMITTER MODEL: CALLBUTTON/BADGE Prepared for: Mr. Bob Wiser VERSUS Technology 2600 Miller Creek Rd. Traverse City, MI 49684 Test Date(s): July 18, 2001 data recorded by witnessed by Ted Chaffee, NCE Bob Wiser Deleted: 28 Inserted: 28 Deleted: 1 Test report #0100444F FCC,Subpart C for Model Call Button Tested July 18, 2001 AHD EMC Lab, 92723 M152, Dowagiac, MI 49047, (616) 424-7014 Page 2 of 32 This report prepared by: Ted Chaffee, NCE Lab Manager/Test Engineer, AHD Deleted: 1 Inserted: 1 Deleted: 22 Test report #0100444F FCC,Subpart C for Model Call Button Tested July 18, 2001 AHD EMC Lab, 92723 M152, Dowagiac, MI 49047, (616) 424-7014 Page 3 of 32 TABLE OF CONTENTS TABLE OF CONTENTS........................................................................................................................3 Statements Concerning this Report.......................................................................................................4 Statement Attesting to the Accuracy of the Data.............................................................................5 Statement relating to FCC Public Notice 22504...............................................................................5 Measurement/Test Site Facility & Equipment.........................................................................................6 Test Site [2.948, 2.1033(b6)]......................................................................................................6 Measurement Equipment Used [2.947(d), 15.31(b)]........................................................................6 EUT Description..................................................................................................................................7 EUT Pictures...............................................................................................................................7 Tested Configuration /Setup: [2.1033(b8)]............................................................................................10 Support Equipment & Cabling......................................................................................................10 Setup Pictures...........................................................................................................................10 Test Methodology: [2.1033(b6)]...........................................................................................................13 Standards Applied to Test: [2.1033(b6)]........................................................................................13 Variance from Test Procedure..............................................................................................14 Formulas and Sample Calculations:.............................................................................................15 Measurement Results........................................................................................................................17 Summary:.................................................................................................................................17 Changes made to achieve compliance..................................................................................17 Test Data [2.1033(b6)]................................................................................................................18 Occupied Bandwidth [15.231(c)]...........................................................................................18 Restricted Bands: [15.205]..................................................................................................19 Field Strength Measurements......................................................................................................20 Radiated Field Strength Measurements: [15.231(b), 15.205]..................................................20 Radiated Field Strength Measurements.................................................................................21 Modulation Characteristics and Duty Cycle Calculations.........................................................22 APPENDIX A....................................................................................................................................26 General Measurement Procedures...............................................................................................26 Line Conducted...................................................................................................................26 Radiated............................................................................................................................27 Cable Loss................................................................................................................................29 AHD Accreditation......................................................................................................................31 Deleted: 2 Deleted: 3 Deleted: 4 Deleted: 4 Deleted: 5 Deleted: 5 Deleted: 5 Deleted: 6 Deleted: 6 Deleted: 9 Deleted: 9 Deleted: 9 Deleted: 12 Deleted: 12 Deleted: 13 Deleted: 14 Deleted: 15 Deleted: 15 Deleted: 15 Deleted: 16 Deleted: 16 Deleted: 17 Deleted: 18 Deleted: 18 Deleted: 19 Deleted: 20 Deleted: 23 Deleted: 23 Deleted: 23 Deleted: 24 Deleted: 25 Deleted: 27 Deleted: 1 Inserted: 1 Deleted: 22 Test report #0100444F FCC,Subpart C for Model Call Button Tested July 18, 2001 AHD EMC Lab, 92723 M152, Dowagiac, MI 49047, (616) 424-7014 Page 4 of 32 STATEMENTS CONCERNING THIS REPORT Test Traceability: The calibration of all measuring and test equipment and the measured data using this equipment are traceable to the National Institute for Standards and Technology (NIST). Limitations on results: The test results contained in this report rel…
Text truncated - open the document above for the full version.
Test report #0100444F FCC,Subpart C for Model Call Button Tested July 18, 2001 AHD EMC Lab, 92723 M152, Dowagiac, MI 49047, (616) 424-7014 Page 11 of 32 RADIATED SETUP END POSITION FLAT POSITION Deleted: 1 Inserted: 1 Deleted: 22 Test report #0100444F FCC,Subpart C for Model Call Button Tested July 18, 2001 AHD EMC Lab, 92723 M152, Dowagiac, MI 49047, (616) 424-7014 Page 12 of 32 SIDE POSITION Deleted: 1 Inserted: 1 Deleted: 22
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15.231(e) | 434 MHz - 434 MHz | - |

BLE Dual band plug-in sensor
Equipment Class
NII - Unlicensed National Information Infrastructure TX
Clearview BLE/IR Badge
Equipment Class
DTS - Digital Transmission System
BLE Badge
Equipment Class
DTS - Digital Transmission System
Event Tag
Equipment Class
DSC - Part 15 Security/Remote Control Transmitter
MiniAssetTag
Equipment Class
DSC - Part 15 Security/Remote Control Transmitter