
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
Wireless Broadband Router User manual Page 1 of 54 Wireless Broadband Router User’s Manual Wireless Broadband Router User manual Page 2 of 54 This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference. (2) This device must accept any interference received, including interference that may cause undesired operation. This equipment has been tested and found to comply with the limits for a class B digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference in a residential installation. This equipment generates, uses and can radiate radio frequency energy and, if not installed and used in accordance with the instructions, may cause harmful interference to radio communications. However, there is no guarantee that interference will not occur in a particular installation. If this equipment does cause harmful interference to radio or television reception, which can be determined by turning the equipment off and on, the user is encouraged to try to correct the interference by one or more of the following measures: ---Reorient or relocate the receiving antenna. ---Increase the separation between the equipment and receiver. ---Connect the equipment into an outlet on a circuit different from that to which the receiver is connected. ---Consult the dealer or an experienced radio/TV technician for help. Changes or modifications not expressly approved by the party responsible for compliance could void the user's authority to operate the equipment. FCC RF Radiation Exposure Statement: This equipment complies with FCC RF radiation exposure limits set forth for an uncontrolled environment. This device and its antenna must not be co-located or operating in conjunction with any other antenna or transmitter. Wireless Broadband Router User manual Page 3 of 54 Table of Contents Chapter 1 Introduction ...................................................................... 5 1.1 Welcome ..................................................................................5 1.2 About This Guide .......................................................................5 1.3 Copyright statement ..................................................................5 Chapter 2 Designing Your Wireless Network ..................................... 6 2.1 System Requirements ................................................................6 Chapter 3 Getting to Know the Wireless-G Broadband Router ........... 7 3.1 Back Panel................................................................................7 3.2 LED Description.........................................................................8 Chapter 4 hardware connection....................................................... 10 4.1 Connecting the Wireless Broadband Router .................................10 Chapter 5 Configuring Local PC to Access the Wireless Router ........ 11 5.1Setting up TCP/IP .....................................................................11 5.1.1 Windows 98/Me...............................................................11 5.1.2 Windows 2000 ................................................................11 5.1.3 Windows XP....................................................................14 5.2 Additional Settings for Wireless Client.........................................17 5.3 Checking PC’s IP and Connection with the Router .........................18 Chapter 6 Web Configuration .......................................................... 20 6.1 Logging In ..............................................................................20 6.2 Quick Setup Wizard .................................................................21 6.3 Status....................................................................................24 6.3.1 System Status ................................................................24 6.3.2 Statistics ........................................................................27 6.4 WAN Setup .............................................................................28 6.4.1 Dynamic IP Address .........................................................28 6.4.2 PPPoE ............................................................................29 6.4.3 Static IP .........................................................................31 6.5 LAN Setup ..............................................................................32 6.5.1Lan Setup........................................................................32 6.5.2 DHCP Info ......................................................................33 6.6 Wireless Settings.....................................................................33 6.6.1 Basic Wireless Settings.....................................................33 6.6.2 Advanced Wireless Settings ..............................................34 6.6.3 Wireless Security.............................................................35 6.6.4 Wireless MAC Filter ..........................................................39 6.6.5 Active Clients ..................................................................40 6.6.6 WDS Set ........................................................................40 6.7 Routing ..................................................................................41 6.8 NAT .......................................................................................41 6.8.1 DMZ Host Setup ..............................................................41 6.8.2 FTP Private Port...............................................................42 6.8.3 Virtual Server Setup ........................................................42 6.8.4 Port Tiger .......................................................................44 6.9 Fire Wall.................................................................................45 Wireless Broadband …
Text truncated - open the document above for the full version.
NETCORE TECHNOLOGY INC.________________________________________________ 9F, B BLOCK, RESEARCH&DEVELOPMENT BUILDING, TSING HUA INFORMATION PARK, HIGH-TECH INDUSTRIAL PARK NORTH SECTION, NANSHAN, SHENZHEN, CHINA Date: 2006/4/30 Compliance Certification Services Certification Division 561F Monterey Road Morgan Hill, CA 95037 To whom it may concern: We, the undersigned, hereby authorize the Shenzhen office of Compliance Engineering Services, Inc., d.b.a. Compliance Certification Services and hereafter referred to as CCS SZ, to act on our behalf in all manners relating to application for equipment authorization, including signing of all documents relating to these matters. Any and all acts carried out by CCS SZ on our behalf shall have the same effect as acts of our own. In authorizing CCS SZ as our agent, we still recognize that we are responsible to: a) comply with the relevant provisions of the certification program; b) make all necessary arrangements for the conduct of the evaluation, including provision for examining documentation and access to all areas, records (including internal audit reports) and personnel for the purposes of evaluation (e.g. testing, inspection, assessment, surveillance, reassessment) and resolution of complaints; c) make claims regarding certification only in respect of the scope for which certification has been granted; d) do not use our product certification in such a manner as to bring the Certification Division into disrepute and not make any statement regarding our product certification which the Certification Division may consider misleading or unauthorized; e) upon suspension or cancellation of certification, discontinue use of all advertising matter that contains any reference thereto and return any certification documents as required by the Certification Division; f) use certification only to indicate the products are certified as being in conformity with specified standards; g) endeavor to ensure that no certificate or report nor any part thereof is used in a misleading manner; h) ensure that any reference to our product certification in communication media such as documents, brochures or advertising, complies with the requirements of the Certification Division; i) keep a record of all complaints made known to the us relating to the product’s compliance with requirements of the relevant standard and to make these records available to the Certification Division when requested; j) take appropriate action with respect to such complaints and any deficiencies found in products or services that affect compliance with the requirements for certification; k) document the actions taken. This authorization is valid until further written notice from the applicant.
LABEL LOCATION & FORMAT This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) this device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation.
Antenna description 310GC uses microstrip antenna,max gain is 0dB 320GP use omni antenna with R-SMA connector, max gain is 2dB. 605GR user omni integral antenna, max gain is 2dB.
Compliance Certification Services (Shenzhen) Inc. Report No: SZ060417B10-RP FCC ID: T58605GR2006M1 Date of Issue: May 11, 2006 Note: This report shall not be reproduced except in full, without the written approval of Compliance Certification Services Inc. This document may be altered or revised by Compliance Certification Services Inc. personnel only, and shall be noted in the revision section of the document. Page 1 of 64 FCC 47 CFR PART 15 SUBPART C TEST REPORT For WIRELESS BROADBAND ROUTER Model: 605GR / NC-605GRM1 / NE-605GRM1 Trade Name: N/A Prepared for NETCORE TECHNOLOGY INC. 9F, B BLOCK, RESEARCH&DEVELOPMENT BUILDING, TSING HUA INFORMATION PARK, HIGH-TECH INDUSTRIAL PARK NORTH SECTION, NANSHAN, SHENZHEN, CHINA Prepared by COMPLIANCE CERTIFICATION SERVICES (SHENZHEN) INC. NO. 5, JINAO INDUSTRIAL PARK, NO. 35 JUKENG ROAD, DASHUIKENG VILLAGE, GUANLAN TOWN, BAOAN DISTRICT, SHENZHEN, CHINA TEL: 86-755-28055000 FAX: 86-755-28055221 LAB CODE:200577-0 Compliance Certification Services (Shenzhen) Inc. Report No: SZ060417B10-RP FCC ID: T58605GR2006M1 Date of Issue: May 11, 2006 Page 2 TABLE OF CONTENTS 1. TEST RESULT CERTIFICATION............................................................................................. 3 2. EUT DESCRIPTION .................................................................................................................... 4 3. TEST METHODOLOGY ............................................................................................................. 5 3.1 EUT CONFIGURATION........................................................................................................................5 3.2 EUT EXERCISE....................................................................................................................................5 3.3 GENERAL TEST PROCEDURES.............................................................................................................5 3.4 FCC PART 15.205 RESTRICTED BANDS OF OPERATIONS.........................................................6 3.5 DESCRIPTION OF TEST MODES...........................................................................................................6 4. INSTRUMENT CALIBRATION................................................................................................. 7 5. FACILITIES AND ACCREDITATIONS ................................................................................... 8 5.1 FACILITIES 8 5.2 EQUIPMENT........................................................................................................................................8 5.3 LABORATORY ACCREDITATIONS AND LISTING..................................................................................8 6. SETUP OF EQUIPMENT UNDER TEST .................................................................................. 9 6.1 SETUP CONFIGURATION OF EUT.........................................................................................................9 6.2 SUPPORT EQUIPMENT .................................................................................................................9 7. FCC PART 15.247 REQUIREMENTS...................................................................................... 10 7.1 6DB BANDWIDTH.............................................................................................................................10 7.2 PEAK POWER....................................................................................................................................16 7.3 BAND EDGES MEASUREMENT ................................................................................................22 7.4 PEAK POWER SPECTRAL DENSITY....................................................................................................31 7.5 SPURIOUS EMISSIONS.................................................................................................................37 7.6 POWERLINE CONDUCTED EMISSIONS..............................................................................................59 APPENDIX 1 PHOTOGRPHS OF TEST SETUP .......................................................................... 63 Compliance Certification Services (Shenzhen) Inc. Report No: SZ060417B10-RP FCC ID: T58605GR2006M1 Date of Issue: May 11, 2006 Page 3 1. TEST RESULT CERTIFICATION Applicant: NETCORE TECHNOLOGY INC. 9F, B BLOCK, RESEARCH&DEVELOPMENT BUILDING, TSING HUA INFORMATION PARK, HIGH-TECH INDUSTRIAL PARK NORTH SECTION, NANSHAN, SHENZHEN, CHINA Equipment Under Test: WIRELESS BROADBAND ROUTER Trade Name: N/A Model: 605GR / NC-605GRM1 / NE-605GRM1 Date of Test: April 17-May 11, 2006 APPLICABLE STANDARDS STANDARD TEST RESULT FCC Part 15 Subpart C No non-compliance noted We hereby certify that: The above equipment was tested by Compliance Certification Services (Shenzhen) Inc. The test data, data evaluation, test procedures, and equipment configurations shown in this report were made in accordance with the procedures given in ANSI C63.4: 2003 and the energy emitted by the sample EUT tested as described in this report is in compliance with the requirements of FCC Rules Part 15.207, 15.209, 15.247. The test results of this report relate only to the tested sample EUT identified in this report. Approved by: Tested By: Henry Ding / Engineer Reviewed By: Clinton Kao / EMC Manager Eric Wong / Assistant manager COMPLIANCE CERTIFICATION COMPLIANCE CERTIFICATION SERVICES (SHENZHEN) INC. SERVICES (SHENZHEN) INC. Compliance Certification Services (Shenzhen) Inc. Report No: SZ060417B10-RP FCC ID: T58605GR2006M1 Date of Issue: May 11, 2006 Page 4 2. EUT DESCRIPTION Product WIRELESS BROADBAND ROUTER Trade Name N/A Model Number 605GR / NC-605GRM1 / NE-605GRM1 Model Difference Based on the same products Power Supply Powered from the adapter Trade name / Model number: Dong Xiong / OH-48344DT I/P: AC220V/50Hz O/P: DC 9V, 1000mA Frequency Range 802.11b mode: 2412 ~ 2462 MHz 802.11g mode: 2412 ~ 2462 MHz Transmit Power 802.11b m…
Text truncated - open the document above for the full version.
Compliance Certification Services (Shenzhen) Inc. Report No: SZ060417B10-RP FCC ID: T58605GR2006M1 Date of Issue: May 11, 2006 Page 63 APPENDIX 1 PHOTOGRPHS OF TEST SETUP LINE CONDUCTED EMISSION TEST Compliance Certification Services (Shenzhen) Inc. Report No: SZ060417B10-RP FCC ID: T58605GR2006M1 Date of Issue: May 11, 2006 Page 64 RADIATED EMISSION TEST
| # | Rule Parts | Frequency Range | Power Output |
|---|---|---|---|
| 1 | 15C | 2.41 GHz - 2.46 GHz | 19.20 mW |

AX3000 Wireless Dual-Band WiFi6 Router
Equipment Class
DTS - Digital Transmission System
AX1800 Whole Home Mesh WiFi 6 System
Equipment Class
NII - Unlicensed National Information Infrastructure TX
AX1800 Dual-Band Wireless Router
Equipment Class
DTS - Digital Transmission System
AC1200 Wireless Dual Band Gigabit Router
Equipment Class
NII - Unlicensed National Information Infrastructure TX
AC1200 Dual Band WiFi Repeater
Equipment Class
DTS - Digital Transmission System