FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Guard RFID Solutions/
  3. VZKAT

VZKATACTIVE RFID TAG USED FOR LOCATION AND PERIMETER PROTECTION OF ASSETS

Guard RFID Solutions
ACTIVE RFID TAG USED FOR LOCATION AND PERIMETER PROTECTION OF ASSETS - FCC ID VZKAT - Guard RFID Solutions
Click to zoom

Application Details

Equipment Class
DSR - Part 15 Remote Control/Security Device Transceiver
Date of Grant
Oct 23, 2011
Application Purpose
Original Equipment
Date of Application
Oct 03, 2011
Equipment Note
ACTIVE RFID TAG USED FOR LOCATION AND PERIMETER PROTECTION OF ASSETS
Frequency Range
433.92000000 - 433.92000000
Company
Guard RFID Solutions
Country
Canada

Documents & Files

Select a file to view

Users Manual

Cover Letter(s)

↗

External Photos

↗

ID Label/Location Info

↗
↗

Test Report

↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Cover Letter(s)

#140 – 760 Cliveden Place Delta, BC Canada V3M 6C7 T: 604.998.4018 F: 604.524.4018 www.guardrfid.com August 31, 2011 Federal Communications Commission Authorization and Evaluation Division Confidentiality Request regarding application for certification of FCC ID: (VZKAT). Pursuant to Sections 0.457 and 0.459 of the Commission’s Rules, we hereby request confidential treatment of information accompanying this application as outlined below: Exhibit Type File Name Schematic Theory of Operation Block Diagram Internal photos AT_SCH..pdf AT_Theory of Operation.pdf AT_Block Diagram.pdf AT_Internal.jpg The above materials contain trade secrets and proprietary information not customarily released to the public. The public disclosure of these materials may be harmful to the applicant and provide unjustified benefits to its competitors. This device is fully sealed by means of PCB encapsulation into potting compound and outside enclosure gluing. It cannot be disassembled without product destruction. Even if the enclosure is forcefully opened, the PCBA is still encapsulated into potting compound which is at the same time embedded into enclosure side ribs (to prevent separation of PCBA and enclosure). Also, potting compound is applied not only over the components, but also under some of the components where this is possible. Separation of potting compound and PCBA is not possible without damaging the PCBA. The applicant understands that pursuant to Section 0.457 of the Rules, disclosure of this application and all accompanying documentation will not be made before the date of the Grant for this application. Sincerely, Dalibor Pokrajac VP of Engineering Guard RFID Solutions Inc. 604-282-7584 #140 – 760 Cliveden Place Delta, BC Canada V3M 6C7 T: 604.998.4018 F: 604.524.4018 www.guardrfid.com

Test Report

REPORT For Guard RFID Solutions Inc. #140 – 766 Cliveden Place Delta, British Columbia V3M 6C7, Canada Date: June 28, 2011 Report No.: 10385-2E Revision No.: 0 Project No.: 10385 Equipment: RFID TAG Model No.: ARTICLE TAG FCC ID: VZKAT ONE STOP GLOBAL CERTIFICATION SOLUTIONS 3133-20800 Westminster Hwy, Richmond, BC V6V 2W3, Canada Phone: 604-247-0444 Fax: 604-247-0442 www.labtestcert.com Prepared by: LabTest Certification Inc. Client:Guard RFID Solutions Inc. Date Issued: June 28, 2011 Report No.: 10385-2E Project No.: 10385 Revision No.: 0 Page 2 of 42 This document shall not be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from LabTest Certification Inc. DCN: 1034, Rev 2 TABLE OF CONTENTS TEST REPORT ................................................................................................................................................ 3 FCC Part 15.231/IC RSS 210 .......................................................................................................................... 3 General product information: ............................................................................................................................ 5 Frequencies...................................................................................................................................................... 6 List of auxiliary and/or support equipment provided by the applicant .............................................................. 6 Software and Firmware .................................................................................................................................... 6 Worst-case configuration and mode of operation during testing...................................................................... 6 Modifications Required for Compliance............................................................................................................ 6 Test Equipment Verified for function ................................................................................................................ 6 Measurement Uncertainty ................................................................................................................................ 7 Markings ........................................................................................................................................................... 8 Test Summary .................................................................................................................................................. 9 Summary of the operation of RF Transmission.............................................................................................. 10 Test Limits................................................................................................................................................... 10 Reviewed Results: ...................................................................................................................................... 10 Field Strength of Fundamental ....................................................................................................................... 13 Test Limits................................................................................................................................................... 13 Test Setup................................................................................................................................................... 14 Test Results: ............................................................................................................................................... 14 Field Strength of Spurious Emission .............................................................................................................. 17 Test Limits................................................................................................................................................... 17 Test Setup................................................................................................................................................... 18 Test Results: ............................................................................................................................................... 19 Radiated Emission; Unintentional Radiators .................................................................................................. 26 Test Limits................................................................................................................................................... 26 Test Setup for Pre-scan .............................................................................................................................. 26 Test Setup for Open Area Test Site(OATS) ............................................................................................... 27 Test Results: ............................................................................................................................................... 27 The Bandwidth of the emission ...................................................................................................................... 30 Test Limits................................................................................................................................................... 30 Test Setup................................................................................................................................................... 30 Test Results: ............................................................................................................................................... 30 Conducted Emission ...................................................................................................................................... 33 Test Limits................................................................…

Text truncated - open the document above for the full version.

Test Setup Photos

Prepared by: LabTest Certification Inc. Client:Guard RFID Solutions Inc. Date Issued: June 28, 2011 Report No.: 10385-2E Project No.: 10385 Revision No.: 0 Page 35 of 41 This document shall not be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from LabTest Certification Inc. DCN: 1034, Rev 2 APPENDIX C: Test setup photos - Test configuration for Field Strength measurement at OATS #1 Prepared by: LabTest Certification Inc. Client:Guard RFID Solutions Inc. Date Issued: June 28, 2011 Report No.: 10385-2E Project No.: 10385 Revision No.: 0 Page 36 of 41 This document shall not be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from LabTest Certification Inc. DCN: 1034, Rev 2 - Test configuration for Field Strength measurement at OATS #2 Prepared by: LabTest Certification Inc. Client:Guard RFID Solutions Inc. Date Issued: June 28, 2011 Report No.: 10385-2E Project No.: 10385 Revision No.: 0 Page 37 of 41 This document shall not be reproduced or utilized in any form or by any means, electronic or mechanical, including photocopying and microfilm, without permission in writing from LabTest Certification Inc. DCN: 1034, Rev 2 - Set-up for Orthogonal X - Set-up for Orthogonal Y - Set-up for Orthogonal Z

Contact Information

Applicant

Dalibor Pokrajac(VP of Engineering)
[email protected]604.282-7584Fax: 604.524.4018

Test Firm

LabTest Certification Inc.Kavinder Dhillon
[email protected]604-247-0444Fax: 604-247-0442

Technical Specifications

#Rule PartsFrequency RangePower Output
115.231433.92 MHz - 433.92 MHz-
Confidentiality
Long Term

Other Applications from Guard RFID Solutions

Guard RFID WiFi staff/employee tag - FCC ID VZKST4 - Guard RFID Solutions
VZKST4

Guard RFID WiFi staff/employee tag

Jan 03, 2023

Equipment Class

DTS - Digital Transmission System
ACTIVE RFID TAG USED FOR PROTECTION OF ASSETS - FCC ID VZKAT4 - Guard RFID Solutions
VZKAT4

ACTIVE RFID TAG USED FOR PROTECTION OF ASSETS

Dec 08, 2013

Equipment Class

DSR - Part 15 Remote Control/Security Device Transceiver
ACTIVE RFID TAG USED FOR LOCATION AND PERIMETER PROTECTION OF PEOPLE - FCC ID VZKPPT - Guard RFID Solutions
VZKPPT

ACTIVE RFID TAG USED FOR LOCATION AND PERIMETER PROTECTION OF PEOPLE

Oct 24, 2012

Equipment Class

DSR - Part 15 Remote Control/Security Device Transceiver
GENERATOR OF LOW FREQUENCY FILED USED FOR DETECTION OF ACTIVE TAGS AT THE PORTAL - FCC ID VZKTE - Guard RFID Solutions
VZKTE

GENERATOR OF LOW FREQUENCY FILED USED FOR DETECTION OF ACTIVE TAGS AT THE PORTAL

Aug 12, 2012

Equipment Class

DCD - Part 15 Low Power Transmitter Below 1705 kHz
ACTIVE RFID TAG USED FOR LOCATION AND PERIMETER PROTECTION OF PEOPLE AND ASSETS - FCC ID VZKST - Guard RFID Solutions
VZKST

ACTIVE RFID TAG USED FOR LOCATION AND PERIMETER PROTECTION OF PEOPLE AND ASSETS

Jan 26, 2012

Equipment Class

DSR - Part 15 Remote Control/Security Device Transceiver