
Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.
BTS3900(A) GSM V300R008 Commissioning Guide Issue02 Date2009-04-20 Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Huawei Technologies Co., Ltd. provides customers with comprehensive technical support and service. For any assistance, please contact our local office or company headquarters. Huawei Technologies Co., Ltd. Address:Huawei Industrial Base Bantian, Longgang Shenzhen 518129 People's Republic of China Website:http://www.huawei.com Email:[email protected] Copyright © Huawei Technologies Co., Ltd. 2009. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd. Trademarks and Permissions and other Huawei trademarks are the property of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this document are the property of their respective holders. Notice The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but the statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied. Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. Contents About This Document.....................................................................................................................1 1 Changes in BTS3900(A) GSM Commissioning Guide.......................................................1-1 2 General Requirements for the Commissioning...................................................................2-1 2.1 Commissioning Resources..............................................................................................................................2-2 2.2 Commissioning Prerequisites..........................................................................................................................2-3 3 Commissioning Procedure.......................................................................................................3-1 4 Commissioning the BTS (Transmission Available)............................................................4-1 4.1 Starting the LMT.............................................................................................................................................4-2 4.2 Checking the Transmission and Networking..................................................................................................4-4 4.2.1 Checking the Transmission Between the RRU and the BBU or Between the BBU and the BSC on the LMT................................................................................................................................................................4-5 4.2.2 Checking the Transmission Between Cascaded BTSs...........................................................................4-6 4.2.3 Checking the Transmission Between BTSs in Ring Topology..............................................................4-8 4.3 Checking Software Version and Data Configuration....................................................................................4-11 4.3.1 Checking the Board Configuration and Status on the LMT.................................................................4-11 4.3.2 Checking the Current Software Version on the LMT..........................................................................4-13 4.3.3 Checking the Consistency Between Hardware Installation and Data Configuration...........................4-14 4.4 Checking the Alarm Information of the BTS (on the LMT).........................................................................4-19 4.5 Commissioning the BTS Services.................................................................................................................4-22 4.5.1 Testing the CS Services........................................................................................................................4-23 4.5.2 Commissioning PS Services.................................................................................................................4-25 4.6 Checking the BTS Environment Alarms.......................................................................................................4-26 4.6.1 BTS Environment Alarm Types...........................................................................................................4-26 4.6.2 Checking the Environment Monitoring Alarms on the LMT..............................................................4-28 5 Commissioning the BTS (Transmission Unavailable).......................................................5-1 5.1 Starting the Site Maintenance Terminal..........................................................................................................5-2 5.1.1 Setting the IP Address of the Site Maintenance Terminal PC...............................................................5-2 5.1.2 Locally Connecting the SMT PC to the BTS.........................................................................................5-3 5.1.3 Logging in to the BTS at the Local End.................................................................................................5-3 5.2 Configuring the Basic Data of the BTS..........................................................................................................5-5 5.2.1 Obtaining the Site Management Rights.................................................................................................5-6 BTS3900(A) GSM Commissioning GuideContents Issue 02 (2009-04-20)Huawei Proprietary and Confidential Copyright © Huawei Technologies Co., Ltd. i 5.2.2 Configuring the Boards of the BTS on the SMT...................................................................................5-7 5.2.3 Configuring Logical Objects of the BTS on the SMT.........................................................................5-11 5.3 Checki…
Text truncated - open the document above for the full version.
Huawei Technologies Co., Ltd. Address: Huawei Industrial Base,Bantian Longgang,Shenzhen 518129, Post ZIP: 518129 P.R China To: CETECOM Fax: NULL From:Zhang Xinghai Fax:0086-755-89652518 Tel:0086-755-89650863 Email address: [email protected] Web:www.huawei.com Subject: Letter of Confidentiality Federal Communications Commission 7435 Oakland Mills Road Columbia, MD 21046 Gentlemen: This letter is to comply with the Code of Federal Regulations Title 47 Section 0.457 and 0.459 pertaining to confidential material. Huawei Technologies Co., Ltd. would like the following documents regarding this submission for FCC ID: QISGRFU-1900 to be kept confidential: 1 Schematic diagram 2 Block Diagram. 3 Parts list (BOM) Information. 4 Operational description. 5. Tune-up procedure The above material contains trade secrets or technical data, which would customarily be guarded from competitors. We do not want these documents to be accessible to the general public. Sincerely, For and Behalf of: Huawei Technologies Co., Ltd. Zhang Xinghai EMC Laboratory Manager
Huawei Technologies Co., Ltd. Administration Building, Huawei Base, Bantian, Longgang District, Shenzhen 518129 P.R.C. +86 755 28780808 www.huawei.com Huawei internal reference RCT-US-01-01 USA FCC Short Term Confidentiality Request template Effective date: 2007-01-06 Version 1.1 Short Term Confidentiality Request 2010-07-23 Federal Communications Commission Office of Engineering and Technology Equipment Authorization Division 7345 Oakland Mills Road Columbia, Maryland 21046 Subject: SHORT-TERM Confidentiality Request for FCC ID: QISGRFU-1900 Product Name: GSM Radio Frequency Unit Product Model: GRFU-1900 To whom maybe concern: Pursuant to sections 0.457 and 0.459 of CFR 47 and to avoid premature release of sensitive information prior to marketing or release of the product to the public, Huawei Technologies Co., Ltd requests the following documents contained in this certification application be temporarily withheld from public disclosure for an initial period of 45days: 1. External Photos 2. Internal Photos 3. Test Setup Photos 4. Users Manual The applicant also acknowledges that they will also provide appropriate notice to CETECOM should either of the following occur: A) If the applicant requires additional 45 day extension periods they will notify CETECOM with a new request letter at least 7 days prior to the short-term confidentiality expiration date-[Note: up to maximum of 3 extensions only are allowed], or b) Immediately notify CETECOM in the event the information regarding the product of the product is made available to the public. CETECOM will then release the documents listed above for public disclosure pursuant to FCC Public Notice DA 04-1705. Sincerely, Zhang Xingwei Regulation Compliance Manager Print name Signature Title
文档名称 文档密级: 2010-9-3 华为机密,未经许可不得扩散 第1页, 共2页 Fig.1-GRFU V1 module top side 文档名称 文档密级: 2010-9-3 华为机密,未经许可不得扩散 第2页, 共2页 Fig.2-GRFU V1 module bottom side
文档名称 文档密级: 2010-9-3 华为机密,未经许可不得扩散 第1页, 共1页 Fig.1-board component side of GRFU V1 module
Maximum Permissible Exposure (MPE) Estimation Report Product Name: GSM Radio Frequency Unit Model Number: GRFU-1900 Report No: SYBH (R) 006052010EB-2 FCC ID: QISGRFU-1900 Reliability Laboratory of Huawei Technologies Co., Ltd. Huawei Base, Bantian, Longgang District, Shenzhen 518129, P.R. China Tel: +86 755 28780808 Fax: +86 755 89652518 MPE Estimation Report of GRFU-1900 FCC ID: QISGRFU-1900; Security Level: Public Report No: SYBH (R) 006052010EB-2 Confidential Information of Huawei. No Distribution without Written Permission Page2, Total12 Notice 1. The laboratory has obtained the accreditation of China National Accreditation Service for Conformity Assessment (CNAS), and accreditation number: L0310. 2. The laboratory has obtained the accreditation of THE AMERICAN ASSOCIATION FOR LABORATORY ACCREDITATION (A2LA), and Accreditation Council Certificate Number: 2174.01. 3. The laboratory has been listed on the US Federal Communications Commission list of test facilities recognized to perform electromagnetic emissions measurements. The site recognition number is 97456. 4. The laboratory has been listed by industry Canada to perform electromagnetic emission measurement. The site recognition number is 6369A-1. 5. The laboratory also has been listed by the VCCI to perform EMC measurements. The accreditation number is R2364, C2583, and T256. 6. The test report is invalid if not marked with "exclusive stamp for the test report". 7. The test report is invalid if not marked with the stamps or the signatures of the persons responsible for performing, revising and approving the test report. 8. The test report is invalid if there is any evidence of erasure and/or falsification. 9. If there is any dissidence for the test report, please file objection to the test centre within 15 days from the date of receiving the test report. 10. Normally, the test report is only responsible for the samples that have undergone the test. 11. Context of the test report cannot be used partially or in full for publicity and/or promotional purposes without previous written approval of the laboratory. MPE Estimation Report of GRFU-1900 FCC ID: QISGRFU-1900; Security Level: Public Report No: SYBH (R) 006052010EB-2 Confidential Information of Huawei. No Distribution without Written Permission Page3, Total12 REPORT ON Maximum Permissible Exposure (MPE) Estimation of GSM Radio Frequency Unit Model Number: GRFU-1900 Report No: SYBH (R) 006052010EB-2 FCC ID: QISGRFU-1900 REGULATION FCC 47CFR Part 1 (10-1-07 Edition) OET Bulletin 65 (Edition 97-01) CONCLUSION COMPLIANT General Manager 2010-07-21 Date (y-m-d) Name Signature Technical Responsibility For Area of Testing 2010-07-21 Date (y-m-d) Name Signature Test Lab Engineer 2010-07-21 Date (y-m-d) Name Signature MPE Estimation Report of GRFU-1900 FCC ID: QISGRFU-1900; Security Level: Public Report No: SYBH (R) 006052010EB-2 Confidential Information of Huawei. No Distribution without Written Permission Page4, Total12 Contents 1 EUT Information...............................................................................................................................5 1.1 PRODUCT DESCRIPTION...............................................................................................................5 1.2 TECHNICAL DESCRIPTION OF EUT................................................................................................5 2 RF Exposure Requirements............................................................................................................6 2.1 FCC ROUTINE ENVIRONMENTAL EVALUATION...............................................................................6 2.2 MAXIMUM PERMISSIBLE EXPOSURE (MPE)...................................................................................8 3 RF Exposure Evaluation..................................................................................................................9 3.1 PREDICTION OF THE EXPOSURE TO ELECTROMAGNETIC FIELDS.....................................................9 3.2 CALCULATION OF THE SAFE DISTANCE..........................................................................................9 4 Location of BTS Antennas............................................................................................................11 4.1 EXCLUSIONS ZONES...................................................................................................................11 4.2 GUIDELINES ON ARRANGING ANTENNA SITES..............................................................................11 MPE Estimation Report of GRFU-1900 FCC ID: QISGRFU-1900; Security Level: Public Report No: SYBH (R) 006052010EB-2 Confidential Information of Huawei. No Distribution without Written Permission Page5, Total12 1 EUT Information 1.1 Product Description The GRFU-1900 is a new generation outdoor GSM distributed macro RF Unit Cabinet. Designed on the basis of industry-leading design where multiple products use uniform modules, it is small sized and easy to be installed. In addition, it has large capacity while low power consumption. 1.2 Technical Description of EUT Table 1. Service and Test Mode List Operating frequency band: PCS Band: Uplink (RX): 1850MHz~1915MHz Downlink (TX): 1930MHz~1990MHz Maximum power input to the antenna: PCS Band: Rated max.: 49 dBm Measured max.: 49.3 dBm (Note: refer to RF test report for the measured output power) Antenna Information: PCS Band: Antenna type: Directional Antenna Antenna gain (typical): 18 dBi Feed line loss (length variable): 13 dB per 100 m MPE Estimation Report of GRFU-1900 FCC ID: QISGRFU-1900; Security Level: Public Report No: SYBH (R) 006052010EB-2 Confidential Information of Huawei. No Distribution without Written Permission Page6, Total12 2 RF Exposure Requirements 2.1 FCC Routine Environmental Evaluation Base Transceiver Station (BTS) emit RF radiation (Radiation Hazard). Although there is no scientific evidence of possible health risks to persons living near to BTSs some recom…
Text truncated - open the document above for the full version.
FCC Test Report Product Name: GSM Radio Frequency Unit Model Number: GRFU-1900 Report No: SYBH(R)006052010EB-1 FCC ID: QISGRFU-1900 Reliability Laboratory of Huawei Technologies Co., Ltd. Huawei Base, Bantian, Longgang District, Shenzhen 518129, P.R. China Tel: +86 755 28780808 Fax: +86 755 89652518 FCC Test Report of GRFU-1900 FCC ID: QISGRFU-1900; Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page2, Total34 Notice 1. The laboratory has obtained the accreditation of China National Accreditation Service for Conformity Assessment (CNAS), and accreditation number: L0310. 2. The laboratory has obtained the accreditation of THE AMERICAN ASSOCIATION FOR LABORATORY ACCREDITATION (A2LA), and Accreditation Council Certificate Number: 2174.01. 3. The laboratory has been listed on the US Federal Communications Commission list of test facilities recognized to perform electromagnetic emissions measurements. The site recognition number is 97456. 4. The laboratory has been listed by industry Canada to perform electromagnetic emission measurement. The site recognition number is 6369A-1. 5. The laboratory also has been listed by the VCCI to perform EMC measurements. The accreditation number is R2364, C2583, and T256. 6. The test report is invalid if not marked with "exclusive stamp for the test report". 7. The test report is invalid if not marked with the stamps or the signatures of the persons responsible for performing, revising and approving the test report. 8. The test report is invalid if there is any evidence of erasure and/or falsification. 9. If there is any dissidence for the test report, please file objection to the test centre within 15 days from the date of receiving the test report. 10. Normally, the test report is only responsible for the samples that have undergone the test. 11. Context of the test report cannot be used partially or in full for publicity and/or promotional purposes without previous written approval of the laboratory. FCC Test Report of GRFU-1900 FCC ID: QISGRFU-1900; Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page3, Total34 REPORT ON FCC Test of GSM Radio Frequency Unit Model Name: GRFU-1900 Report No: SYBH(R)006052010EB-1 FCC ID: QISGRFU-1900 REGULATION 47 CFR FCC Part 2, Subpart J 47 CFR FCC Part 24, Subpart E CONCLUSION PASSED General Manager 2010-07-20 Date (y-m-d) Name Signature Technical Responsibility For Area of Testing 2010-07-20 Date (y-m-d) Name Signature Test Lab Engineer 2010-07-20 Date (y-m-d) Name Signature FCC Test Report of GRFU-1900 FCC ID: QISGRFU-1900; Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page4, Total34 Contents 1 SUMMARY........................................................................................................................................5 1.1 RESULTS SUMMARY.....................................................................................................................5 1.2 SUPPORTING STANDARDS.............................................................................................................5 2 Product Description.........................................................................................................................6 2.1 PRODUCTION INFORMATION OF EUT.............................................................................................6 2.2 MODIFICATION INFORMATION........................................................................................................6 3 Test Site Description.......................................................................................................................7 3.1 TESTING PERIOD..........................................................................................................................7 4 Product Description.........................................................................................................................8 4.1 TECHNICAL CHARACTERISTICS......................................................................................................8 4.2 EUT IDENTIFICATION LIST...........................................................................................................10 5 Main Test Instruments...................................................................................................................11 6 Transmitter & Receiver Measurements........................................................................................12 6.1 MAXIMUM CHANNEL POWER.......................................................................................................13 6.2 MODULATION CHARACTERISTICS.................................................................................................16 6.3 OCCUPIED BANDWIDTH...............................................................................................................18 6.4 BAND EDGES COMPLIANCE.........................................................................................................20 6.5 SPURIOUS EMISSION AT ANTENNA TERMINAL..............................................................................23 6.6 RADIATED SPURIOUS EMISSION..................................................................................................25 6.7 FREQUENCY STABILITY...............................................................................................................29 7 System Measurement Uncertainty...............................................................................................33 8 Appendices.....................................................................................................................................34 FCC Test Report of GRFU-1900 FCC ID: QISGRFU-1900; Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Informatio…
Text truncated - open the document above for the full version.
FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page1, Total50 CONTENTS 1 APPENDIX A- PEAK-TO-AVERAGE RATIO MEASUREMENT ................................................................ 2 2 APPENDIX B- MODULATION CHARACTERISTIC MEASUREMENT ................................................... 5 3 APPENDIX C-OCCUPIED BANDWIDTH MEASUREMENT ...................................................................... 8 4 APPENDIX D-BAND EDGE MEASUREMENT ............................................................................................ 13 5 APPENDIX E-SPURIOUS EMISSION AT ANTENNA TERMINAL MEASUREMENT......................... 38 6 APPENDIX F-FIELD STRENGTH OF SPURIOUS RADIATION MEASUREMENT ............................. 47 FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page2, Total50 1 APPENDIX A- PEAK-TO-AVERAGE RATIO MEASUREMENT FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page3, Total50 TM1: Ref 46.9 dBmAtt 0 dB * Offset 41.9 dB 1 SA CLRWR A LVL Center 1.96 GHz 2 dB/Mean Pwr + 20 dB 3DB RBW 10 MHz AQT 6.25 ms EXT 1E-5 1E-4 1E-3 0.01 0.1 Complementary Cumulative Distribution Function NOF samples: 100000, Usable BW: 11.2MHz Trace 1 Mean 47.2 0 dBm Peak 47.5 0 dBm Crest 0.3 0 dB 10 % 0.2 9 dB 1 % 0.3 2 dB .1 % 0.3 2 dB .01 % 0.3 2 dB Date: 28.MAY.2010 17:16:29 FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page4, Total50 TM2: Offset 41.9 dB 1 SA CLRWR A LVL 3DB RBW 10 MHz AQT 6.25 ms Ref 50 dBmAtt 35 dB Center 1.96 GHz 2 dB/Mean Pwr + 20 dB EXT 1E-5 1E-4 1E-3 0.01 0.1 Complementary Cumulative Distribution Function NOF samples: 100000, Usable BW: 11.2MHz Trace 1 Mean 45.5 6 dBm Peak 48.9 2 dBm Crest 3.3 6 dB 10 % 2.7 2 dB 1 % 3.2 1 dB .1 % 3.3 0 dB .01 % 3.3 0 dB Date: 28.MAY.2010 17:18:44 FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page5, Total50 2 APPENDIX B- MODULATION CHARACTERISTIC MEASUREMENT FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page6, Total50 TM1: Single Carrier No 661 1960MHz Ref 50.8 dBmAtt 20 dB Phase/Frequency Error Offset 41.9 dB Center 1.96 GHz54.28 μs/ 1 SA CLRWR LVL 3DB SWT 542.77 μs deg deg 2 PK MAXH 3 MI MINH EXT -25 -20 -15 -10 -5 0 5 10 15 20 25 1 Marker 1 [T1 ] 2.61 deg -44.673000 μs SUMMARY [T1] PEAK HLD 4.58 deg PEAK AVG 3.07 deg RMS HLD 1.32 deg RMS AVG 1.04 deg FREQ HLD -30.91 Hz FREQ AVG 4.20 Hz IQOF HLD 0.524 % IQOF AVG 0.181 % IQIM HLD 0.382 % IQIM AVG 0.107 % Date: 26.MAY.2010 15:21:23 FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page7, Total50 TM2 Single Carrier No 661 1960MHz Ref 49.1 dBmAtt 20 dB Modulation Accuracy Offset 41.9 dB Center 1.96 GHz52.43 μs/ 1 SA CLRWR LVL 3DB SWT 524.31 μs % % 2 PK MAXH 3 MI MINH EXT SGL 0 4 8 12 16 20 24 28 32 36 40 SWP 20 of 20 1 Marker 1 [T1 ] 1.434 % -35.596100 μs SUMMARY [T1] PEAK HLD 10.974 % PEAK AVG 8.210 % RMS HLD 3.202 % RMS AVG 2.641 % FREQ HLD 24.34 Hz FREQ AVG 7.14 Hz OOS HLD 42.55 dB OOS AVG 51.41 dB PERC HLD 5.880 % PERC AVG 5.010 % IQOF HLD 0.746 % IQOF AVG 0.313 % IQIM HLD 0.700 % IQIM AVG 0.389 % Date: 26.MAY.2010 15:25:11 FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page8, Total50 3 APPENDIX C-OCCUPIED BANDWIDTH MEASUREMENT FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page9, Total50 TM1: Single Carrier No.513 1930.4MHz A Offset 41.9 dB LVL Ref 50 dBmAtt 10 dB * Center 1.9304 GHzSpan 2 MHz200 kHz/ * 3DB RBW 2 kHz VBW 5 kHz SWT 500 ms 1 PK MAXH -50 -40 -30 -20 -10 0 10 20 30 40 50 1 Marker 1 [T1 ] 37.36 dBm 1.930393590 GHz OBW250.000000000 kHz T1 Temp 1 [T1 OBW] 25.22 dBm 1.930275000 GHz T2 Temp 2 [T1 OBW] 24.74 dBm 1.930525000 GHz Date: 26.MAY.2010 11:31:40 FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page10, Total50 No.661 1960MHz B Offset 41.9 dB LVL Ref 50 dBm Center 1.96 GHzSpan 2 MHz200 kHz/ EXT 1 PK MAXH Att 15 dB * 3DB RBW 2 kHz VBW 5 kHz SWT 500 ms -50 -40 -30 -20 -10 0 10 20 30 40 50 1 Marker 1 [T1 ] 38.79 dBm 1.959987179 GHz OBW246.794871795 kHz T1 Temp 1 [T1 OBW] 25.08 dBm 1.959878205 GHz T2 Temp 2 [T1 OBW] 23.21 dBm 1.960125000 GHz Date: 26.MAY.2010 16:27:28 No .809 1989.6MHz Offset 41.9 dB A LVL Ref 45 dBm Center 1.9896 GHzSpan 2 MHz200 kHz/ EXT Att 10 dB * 3DB RBW 2 kHz VBW 5 kHz SWT 500 ms 1 PK MAXH -50 -40 -30 -20 -10 0 10 20 30 40 1 Marker 1 [T1 ] 37.08 dBm 1.989600000 GHz OBW246.794871795 kHz T1 Temp 1 [T1 OBW] 24.27 dBm 1.989478205 GHz T2 Temp 2 [T1 OBW] 23.69 dBm 1.989725000 GHz Date: 27.MAY.2010 16:08:56 FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page11, Total50 TM2: Single Carrier No.513 1930.4MHz A Offset 41.9 dB LVL Ref 50 dBmAtt 10 dB * 1 PK MAXH Center 1.9304 GHzSpan 2 MHz200…
Text truncated - open the document above for the full version.
FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page1, Total3 CONTENTS 1 APPENDIX G-PHOTOS OF TEST SETUP ...................................................................................................... 2 FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page2, Total3 1 APPENDIX G-PHOTOS OF TEST SETUP FCC Test Report of GRFU-1900 FCC ID:QISGRFU-1900 Security Level: Public Report No: SYBH (R) 006052010EB-1 Confidential Information of Huawei. No Distribution without Written Permission Page3, Total3 Radiated Spurious Emissions: Radiated Spurious Disturbance (below 1GHz) Radiated Spurious Disturbance (above 1GHz) ----- END OF APPENDIXES -----
| # | Rule Parts | Frequency Range | Power Output | Emission | Tolerance |
|---|---|---|---|---|---|
| 2 | 24E | 1.93 GHz - 1.99 GHz | 40.1 W | 300KG7W | 0.02 ppm |

Solar Inverter
Equipment Class
DTS - Digital Transmission System
Watch Wireless Charger
Equipment Class
DCD - Part 15 Low Power Transmitter Below 1705 kHz
Remote Radio Unit
Equipment Class
CBD - Citizens Band Category A and B Devices
Indoor Router
Equipment Class
DTS - Digital Transmission System
Solar Smart Monitor & Data Logger
Equipment Class
DTS - Digital Transmission System