FCCID.CO- FCC ID Database
HomeCompaniesEquipment ClassesSearch

© 2026 FCC ID Database. All rights reserved.

AboutContactData sourced from FCC public records
  1. Home/
  2. Huawei Technologies Co.,Ltd/
  3. QISSUN2000

QISSUN2000Solar Inverter

Huawei Technologies Co.,Ltd
Solar Inverter - FCC ID QISSUN2000 - Huawei Technologies Co.,Ltd
Click to zoom

Application Details

Equipment Class
DTS - Digital Transmission System
Date of Grant
Jun 27, 2021
Application Purpose
Original Equipment
Date of Application
Jun 27, 2021
Equipment Note
Solar Inverter
Frequency Range
2412.00000000 - 2462.00000000
Company
Huawei Technologies Co.,Ltd
Country
China

Documents & Files

Select a file to view

Users Manual

↗
↗

Cover Letter(s)

↗
↗
↗

External Photos

↗

ID Label/Location Info

↗

Internal Photos

↗

RF Exposure Info

↗

Test Report

↗
↗

Test Setup Photos

↗

Document Text

Text extracted from the exhibit documents filed with the FCC. Open a document above to read the original.

Users Manual

Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual Issue 01 Date 2021-04-05 HUAWEI TECHNOLOGIES CO., LTD. Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. i Copyright © Huawei Technologies Co., Ltd. 2021. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means without prior written consent of Huawei Technologies Co., Ltd. Trademarks and Permissions and other Huawei trademarks are trademarks of Huawei Technologies Co., Ltd. All other trademarks and trade names mentioned in this document are the property of their respective holders. Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS" without warranties, guarantees or representations of any kind, either express or implied. The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied. Huawei Technologies Co., Ltd. Address: Huawei Industrial Base Bantian, Longgang Shenzhen 518129 People's Republic of China Website: https://e.huawei.com Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual About this Document Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. ii About this Document Abstract This document describes the SUN2000-(15KTL-50KTL)-M3 series inverters (SUN2000 for short) in terms of installation, electrical connection, commissioning, maintenance, and troubleshooting, in the scenarios where the SUN2000 V100R001, SUN2000 V200R001, and SUN2000 V200R002 are replaced.Before installing and operating the SUN2000, ensure that you are familiar with the features, functions, and safety precautions provided in this document. Intended Audience This document is applicable to:  Installers  Users Symbol Conventions The symbols that may be found in this document are defined as follows. Symbol Remarks Indicates a hazard with a high level of risk which, if not avoided, will result in death or serious injury. Indicates a hazard with a medium level of risk which, if not avoided, could result in death or serious injury. Indicates a hazard with a low level of risk which, if not avoided, could result in minor or moderate injury. Indicates a potentially hazardous situation which, if not avoided, could result in equipment damage, data loss, performance deterioration, or unanticipated results. NOTICE is used to address practices not related to personal injury. Supplements the important information in the main text. Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual About this Document Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. iii Symbol Remarks NOTE is used to address information not related to personal injury, equipment damage, and environment deterioration. Change History Changes between document issues are cumulative. The latest document issue contains all updates made in previous issues. Issue Issue 01 (2021-04-05) This issue is the first official release. Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual Contents Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. iv Contents About this Document ..................................................................................................................... ii 1 Safety Information ........................................................................................................................ 1 1.1 General Safety .............................................................................................................................................................. 1 1.2 Personnel Requirements ............................................................................................................................................... 2 1.3 Electrical Safety ............................................................................................................................................................ 3 1.4 Installation Environment Requirements ....................................................................................................................... 4 1.5 Mechanical Safety ........................................................................................................................................................ 4 1.6 Commissioning ............................................................................................................................................................. 5 1.7 Maintenance and Replacement ..................................................................................................................................... 6 2 Overview ......................................................................................................................................... 7 2.1 Overview ...................................................................................................................................................................... 7 2.2 Appearance ................................................................................................................................................................. 11 2.3 Label Description ........................................................................................................................................................ 12 2.4 Working Principles ......................................................................................…

Text truncated - open the document above for the full version.

Users Manual

Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual 6 Electrical Connections Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. 64 Figure 6-22 Network port signal definition Figure 6-23 Signal cable definitions of the terminal block Figure 6-24 COM port Scenario Where No Signal Cable Is Connected Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual 6 Electrical Connections Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. 65 If no signal cable is connected to the SUN2000, use a waterproof plug to block the cable hole of the signal cable connector and connect the signal cable connector to the communications port on the SUN2000 to improve the waterproof performance. Figure 6-25 Connecting the signal cable connector 6.3.2.1 Communication Modes RS485 Communication Figure 6-26 SmartLogger networking It is recommended that the number of SUN2000s connected to each RS485 route be less than 30. Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual 6 Electrical Connections Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. 66 MBUS communication The MBUS is a communication mode in which communication signals are loaded to power cables through the communications board for transmission. The built-in MBUS module in the SUN2000 does not need to be connected to cables. 6.3.2.2 (Optional) Connecting the RS485 Communications Cable to the SUN2000 Prerequisites If the signal cables are long enough to connect to the communications port on the SUN2000, you do not need to install an AC adapter box. Procedure Step 1 If the original signal cable is connected through RJ45 network ports, cut off the RJ45 connectors. Figure 6-27 Cut off the RJ45 connectors Step 2 Connect the signal cable to the signal cable connector. Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual 6 Electrical Connections Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. 67 Figure 6-28 Connecting the cable Step 3 Connect the signal cable connector to the COM port. Figure 6-29 Securing the signal cable connector ----End 6.3.2.3 (Optional) Connecting the Signal Transfer Cable Prerequisites If the signal cables are not long enough to connect to the inverter communications port, connect a signal transfer cable. Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual 6 Electrical Connections Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. 68 Figure 6-30 Terminal block in the AC adapter box (1)Inverter (2)Customer Table 6-1 Signal definitions of the terminal block in the AC adapter box Port Reser ved RS485-1 RS485-2 Ripple Control Inverter - A1-1 A1-2 A2 DIN1 DIN3 GND - B1-1 B1-2 B2 DIN2 DIN4 - Customer - B-IN B-OUT B2 DIN2 DIN4 - - A-IN A-OUT A2 DIN1 DIN3 GND Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual 6 Electrical Connections Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. 69 Figure 6-31 Pin definitions Pin Definition Function Pin Definition Function 1 485A1_1 RS485 differential signal + 2 485A1_2 RS485 differential signal + 3 485B1_1 RS485 differential signal – 4 485B1_2 RS485 differential signal – 5 - - 6 - - 7 485A2 RS485 differential signal + 8 DIN1 Dry contact for power grid scheduling 9 485B2 RS485 differential signal – 10 DIN2 11 - - 12 DIN3 13 - - 14 DIN4 15 - - 16 GND Procedure Step 1 Remove the two security Torx screws from the maintenance compartment door using a security Torx wrench. Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual 6 Electrical Connections Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. 70 Figure 6-32 Opening the AC adapter box Step 2 Route the signal conversion cable and user-side signal cable through the COM port at the bottom of the AC adapter box. Figure 6-33 Routing the signal cable Step 3 Connect one end of the signal conversion cable to the COM port of the inverter. Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual 6 Electrical Connections Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. 71 Figure 6-34 Connecting the signal conversion cable Step 4 Connect the other end of the signal conversion cable to the terminal block. Figure 6-35 Connecting the signal conversion cable Step 5 Connect the user-side signal cable to the terminal block. Figure 6-36 Connecting the user-side signal cable Step 6 Secure the terminal block in the AC adapter box, and connect the PE wires of the signal conversion cable and the user-side signal cable. Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual 6 Electrical Connections Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. 72 Figure 6-37 Secure the terminal block ----End 6.3.3 Installing the AC Output Power Cable Precautions An AC switch must be installed on the AC side of the SUN2000 to ensure that the SUN2000 can be safely disconnected from the power grid. Do not connect loads between the SUN2000 and the AC switch.  Use a socket wrench and extension rod to connect the AC power cable. The extension rod must be longer than 150 mm.  Do not install third-party devices in the AC connection box. There are two rows of AC terminals in the AC adapter box. The lower row is used to connect the AC transfer cable between the AC adapter box and the SUN2000, and the upper row is used to connect the AC output power cable on the user side. Procedure Step 1 Connect the AC transfer cable to the AC terminals in the lower row of the AC adapter box. Replacing SUN2000-(15KTL-50KTL) Series with SUN2000-(15KTL-50KTL)-M3 Series User Manual 6 Electrical Connections Issue 01 (2021-04-05) Copyright © Huawei Technologies Co., Ltd. 73 Figure 6-38 Connecting the AC transfer cable Step 2 Remove the AC terminal box and install partition boards. Figure 6-39 Remov…

Text truncated - open the document above for the full version.

Cover Letter(s)

053019 – 12 Request for Confidentiality Date: June 25, 2021 Subject: Confidentiality Request for: ______( FCC ID:QISSUN2000;IC:6369A-SUN2000)___ Pursuant to FCC 47 CFR 0.457(d) and 0.459 and IC RSP-100, Section 12.4, the applicant requests that a part of the subject FCC application be held confidential. Type of Confidentiality Requested Exhibit ☐ Short Term ☒ Permanent Block Diagrams ☐ Short Term External Photos ☐ Short Term ☐ Permanent * 2 Internal Photos ☐ Short Term ☒ Permanent Operation Description/Theory of Operation ☐ Short Term ☒ Permanent Parts List & Placement/BOM ☐ Short Term ☐ Permanent Tune-Up Procedure ☐ Short Term ☒ Permanent Schematics ☐ Short Term Test Setup Photos ☐ Short Term ☐ Permanent * 3 User’s Manual ______( Huawei Technologies Co. ,Ltd.)______ has spent substantial effort in developing this product and it is one of the first of its kind in industry. Having the subject information easily available to "competition" would negate the advantage they have achieved by developing this product. Not protecting the details of the design will result in financial hardship. Permanent Confidentiality: The applicant requests the exhibits listed above as permanently confidential be permanently withheld from public review due to materials that contain trade secrets and proprietary information not customarily released to the public. Short-Term Confidentiality: The applicant requests the exhibits selected above as short term confidential be withheld from public view for a period of ___(specify number of days not to exceed 180) 3 ___ days from the date of the Grant of Equipment Authorization and prior to marketing. This is to avoid premature release of sensitive information prior to marketing or release of the product to the public. Applicant is also aware that they are responsible to notify ACB in the event information regarding the product or the product is made available to the public before the requested period has expired. ACB will then release the documents listed above for public disclosure pursuant to FCC Public Notice DA 04-1705. NOTE for Industry Canada Applications: IC currently only distinguishes Permanent Confidentiality exhibits as shown above. Short Term confidentiality is not considered applicable to IC applications. Sincerely, By: __________________________ Zhang Xinghai (Signature/Title 4 ) (Print name) 2 - The asterisked items (*) require further information to be provided to ACB before permanent confidentiality will be extended to these exhibits. Please refer to FCC KDB 726920 and the specific Document link for D01 found at: https://apps.fcc.gov/oetcf/kdb/forms/FTSSearchResultPage.cfm?switch=P&id=41731 and review section II, 3) regarding specific information that must accompany these requests. 3 - Please refer to http://acbcert.com/documents/misc-docs/Memo-Short-Term-Vs-Standard-Confidentiality.pdf for complete details. 4 - Must be signed by applicant contact given for applicant on the FCC site, or by the authorized agent if an appropriate authorized agent letter has been provided. Letters should be placed on appropriate letterhead.

Cover Letter(s)

file: declaration letter-template Page 1 of 1 To: interterk Attention: From: Fax No: Date: Mar 10, 2021 Total Page (Cover Included): 1 Subject: Declaration letter We: Company Name: Huawei Technologies Co., Ltd. Address: Administration Building, Headquarters of Huawei Technologies Co., Ltd., Bantian, Longgang District, 518129 Shenzhen, PEOPLE'S REPUBLIC OF CHINA Officially notify that: << SUN2000-40KTL-NAM3, SUN2000-36KTL-NAM3, SUN2000-33KTL-NAM3, SUN2000-30KTL-NAM3, SUN2000-25KTL-NAM3>> have the same technical construction including circuit diagram, PCB Layout, components and component layout, all electrical construction and mechanical construction, the differences among these models listed as below: All models have different rating powers which are distinguished by software Applicant: Huawei Technologies Co., Ltd. 2021.3.11 ___________ __________________________________________ (Date) (Applicant’s authorized signature and company Chop) Zhang Xinghai

Cover Letter(s)

053019 – 12 Authority to Act as Agent Date: June 1, 2021 American Certification Body, Inc. 6731 Whittier Avenue Suite C110 McLean, VA 22101 To Whom It May Concern: Intertek Shanghai is authorized to act on our behalf, until otherwise notified, for applications to American Certification Body, Inc. (ACB). We certify that we are not subject to denial of federal benefits, that includes FCC benefits, pursuant to Section 5301 of the Anti-Drug Abuse Act of 1988, 21 U.S.C. 862. Further, no party, as defined in 47 CFR 1.2002 (b), to the application is subject to denial of federal benefits, that includes FCC benefits. We also declare that the information provided to the FCC is true and correct to the best of our knowledge (47 CFR 2.911(d)) and we have been informed of the grantee responsibilities (47 CFR 2.909) with regard to certified equipment. Thank you, Agency Agreement Expiration Date: Dec 30, 2021 By: __________________________ Zhang Xinghai (Signature 1 ) (Print name) Title: EMC Laboratory Manager On behalf of: _ Huawei Technologies Co. ,Ltd. _________________________ (Company Name) Telephone: ___ +86-755-2897-0299 _______________________ 1 - Must be signed by applicant contact given for applicant on the FCC site, or by the authorized agent if an appropriate authorized agent letter has been provided. Letters should be placed on appropriate letterhead.

External Photos

FCC ID: QISSUN2000 IC: 6369A-SUN2000 Page 1 of 4 External Picture FCC ID: QISSUN2000 IC: 6369A-SUN2000 Page 2 of 4 FCC ID: QISSUN2000 IC: 6369A-SUN2000 Page 3 of 4 FCC ID: QISSUN2000 IC: 6369A-SUN2000 Page 4 of 4

ID Label/Location Info

FCC ID: QISSUN2000 IC: 6369A-SUN2000 Page 1 of 4 LABLE FCC ID: QISSUN2000 IC: 6369A-SUN2000 Page 2 of 4 Label for 25KTL-NAM3 Label for 30KTL-NAM3 FCC ID: QISSUN2000 IC: 6369A-SUN2000 Page 3 of 4 Label for 33KTL-NAM3 Label for 36KTL-NAM3 FCC ID: QISSUN2000 IC: 6369A-SUN2000 Page 4 of 4 Label for 40KTL-NAM3 Location of Label

Internal Photos

FCC ID: QISSUN2000 Page 1 of 8 Internal Picture FCC ID: QISSUN2000 Page 2 of 8 FCC ID: QISSUN2000 Page 3 of 8 FCC ID: QISSUN2000 Page 4 of 8 FCC ID: QISSUN2000 Page 5 of 8 Wi-Fi board Wi-Fi Board Wi-Fi Antenna Board FCC ID: QISSUN2000 Page 6 of 8 Wi-Fi board Wi-Fi Antenna Board FCC ID: QISSUN2000 Page 7 of 8 Wi-Fi Antenna Board BPL board FCC ID: QISSUN2000 Page 8 of 8 BPL board

RF Exposure Info

The results reported herein have been performed in accordance with the laboratory’s terms of accreditation. This report shall not be reproduced except in full without the written approval of the Laboratory. The results in this report apply to the test sample(s) mentioned above at the time of the testing period only and are not to be used to indicate applicability to other similar products. FCC RF EXPOSURE REPORT For Solar Inverter MODEL NUMBER: SUN2000-25KTL-NAM3, SUN2000-30KTL-NAM3, SUN2000-33KTL-NAM3, SUN2000-36KTL-NAM3, SUN2000-40KTL-NAM3 FCC ID: QISSUN2000 REPORT NUMBER: 4789884617-2 ISSUE DATE: June 5, 2021 Prepared for Huawei Technologies Co., Ltd. Administration Building, Headquarters of Huawei Technologies Co., Ltd., Bantian, Longgang District, Shenzhen, China Prepared by UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch Building 10, Innovation Technology Park, No. 1, Li Bin Road, Song Shan Lake Hi- Tech Development Zone Dongguan, 523808, People’s Republic of China Tel: +86 769 22038881 Fax: +86 769 33244054 Website: www.ul.com REPORT NO.: 4789884617-2 Page 2 of 8 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Revision History Rev. Issue Date Revisions Revised By V0 06/05/2021 Initial Issue REPORT NO.: 4789884617-2 Page 3 of 8 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. TABLE OF CONTENTS 1. ATTESTATION OF TEST RESULTS .................................................................................... 4 2. TEST METHODOLOGY ........................................................................................................ 5 3. FACILITIES AND ACCREDITATION .................................................................................... 5 4. REQUIREMENT .................................................................................................................... 7 REPORT NO.: 4789884617-2 Page 4 of 8 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. 1. ATTESTATION OF TEST RESULTS Applicant Information Company Name: Huawei Technologies Co., Ltd. Address: Administration Building, Headquarters of Huawei Technologies Co., Ltd., Bantian, Longgang District, Shenzhen, China Manufacturer Information Company Name: Huawei Technologies Co., Ltd. Address: Administration Building, Headquarters of Huawei Technologies Co., Ltd., Bantian, Longgang District, Shenzhen, China EUT Information EUT Name: Solar Inverter Model: SUN2000-25KTL-NAM3, SUN2000-30KTL-NAM3, SUN2000-33KTL-NAM3, SUN2000-36KTL-NAM3, SUN2000-40KTL-NAM3 Model differences: Please refer to section 4. Sample Status: Normal Sample Received Date: June 4, 2021 Date of Tested: June 4, 2021 APPLICABLE STANDARDS STANDARD TEST RESULTS FCC 47CFR§2.1091 PASS Prepared By: Checked By: Kebo Zhang Shawn Wen Project Engineer Laboratory Leader Approved By: Stephen Guo Laboratory Manager REPORT NO.: 4789884617-2 Page 5 of 8 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. 2. TEST METHODOLOGY The tests documented in this report were performed in accordance with 47 CFR FCC Part 2 Subpart J, section 2.1091. 3. FACILITIES AND ACCREDITATION Accreditation Certificate A2LA (Certificate No.: 4102.01) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. has been assessed and proved to be in compliance with A2LA. FCC (FCC Designation No.: CN1187) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. Has been recognized to perform compliance testing on equipment subject to the Commission's Delcaration of Conformity (DoC) and Certification rules ISED (Company No.: 21320) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. has been registered and fully described in a report filed with ISED. The Company Number is 21320 and the test lab Conformity Assessment Body Identifier (CABID) is CN0046. VCCI (Registration No.: G-20019, R-20004, C-20012 and T-20011) UL Verification Services (Guangzhou) Co., Ltd. Song Shan Lake Branch. has been assessed and proved to be in compliance with VCCI, the Membership No. is 3793. Facility Name: Chamber D, the VCCI registration No. is G-20019 and R-20004 Shielding Room B , the VCCI registration No. is C-20012 and T-20011 Note: All tests measurement facilities use to collect the measurement data are located at Building 10, Innovation Technology Park, Song Shan Lake Hi tech Development Zone, Dongguan, 523808, China. REPORT NO.: 4789884617-2 Page 6 of 8 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No.: 10-SL-F0112 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. 4. DESCRIPTION OF EUT EUT Name Solar Inverter Model SUN2000-25KTL-NAM3, SUN2000-30KTL-NAM3, SUN2000-33KTL-NAM3, SUN2000-36KTL-NAM3, SUN2000-40KTL-NAM3 Model Difference All the models have the same RF technical construction including circuit diagram, PCB Layout, components, component layout and performance. Radio Technology WLAN (IEEE 802.11b/g/n HT20) Operation frequency IEEE 802.11b: 2412MHz ~ 2462MHz IEEE 802.11g: 2412MHz ~ 2462MHz IEEE 802.11n HT20: 2412MHz ~ 2462MHz Modulation IEEE 802.11b: DSSS (CCK, DQPSK, DBPSK) IEEE 802.11g: OFDM (64QAM, 16QAM, QPSK, BPSK) IEEE 802.11n HT20: OFDM (64QAM,…

Text truncated - open the document above for the full version.

Test Report

The results reported herein have been performed in accordance with the laboratory’s terms of accreditation. This report shall not be reproduced except in full without the written approval of the Laboratory. The results in this report apply to the test sample(s) mentioned above at the time of the testing period only and are not to be used to indicate applicability to other similar products. CFR 47 FCC PART 15 SUBPART C ISED RSS-247 ISSUE 2 CERTIFICATION TEST REPORT For Solar Inverter MODEL NUMBER: SUN2000-25KTL-NAM3, SUN2000-30KTL-NAM3, SUN2000-33KTL-NAM3, SUN2000-36KTL-NAM3, SUN2000-40KTL-NAM3 FCC ID: QISSUN2000 IC: 6369A-SUN2000 REPORT NUMBER: 4789884617-1 ISSUE DATE: June 5, 2021 Prepared for Huawei Technologies Co., Ltd. Administration Building, Headquarters of Huawei Technologies Co., Ltd., Bantian, Longgang District, Shenzhen, China Prepared by UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch Building 10, Innovation Technology Park, No. 1, Li Bin Road, Song Shan Lake Hi- Tech Development Zone Dongguan, 523808, People’s Republic of China Tel: +86 769 22038881 Fax: +86 769 33244054 Website: www.ul.com REPORT NO.: 4789884617-1 Page 2 of 98 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No: 10-SL-F0088 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Revision History Rev. Issue Date Revisions Revised By V0 06/05/2021 Initial Issue REPORT NO.: 4789884617-1 Page 3 of 98 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No: 10-SL-F0088 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. Summary of Test Results Clause Test Items FCC/ISED Rules Test Results 1 6dB Bandwidth and 99% Occupied Bandwidth FCC Part 15.247 (a) (2) RSS-247 Clause 5.2 (a) ISED RSS-Gen Clause 6.7 Pass 2 Conducted Output Power FCC Part 15.247 (b) (3) RSS-247 Clause 5.4 (d) Pass 3 Power Spectral Density FCC Part 15.247 (e) RSS-247 Clause 5.2 (b) Pass 4 Conducted Bandedge and Spurious Emission FCC Part 15.247 (d) RSS-247 Clause 5.5 Pass 5 Radiated Bandedge and Spurious Emission FCC Part 15.247 (d) FCC Part 15.209 FCC Part 15.205 RSS-247 Clause 5.5 RSS-GEN Clause 8.9 Pass 6 Antenna Requirement FCC Part 15.203 RSS-GEN Clause 6.8 Pass Note: 1.This test report is only published to and used by the applicant, and it is not for evidence purpose in China. 2. The measurement result for the sample received is <Pass> according to < CFR 47 FCC PART 15 SUBPART C >< ISED RSS-247 > when <Accuracy Method> decision rule is applied. REPORT NO.: 4789884617-1 Page 4 of 98 UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch FORM No: 10-SL-F0088 This report shall not be reproduced except in full, without the written approval of UL Verification Services (Guangzhou) Co., Ltd, Song Shan Lake Branch. TABLE OF CONTENTS 1. ATTESTATION OF TEST RESULTS .................................................................................... 6 2. TEST METHODOLOGY ........................................................................................................ 7 3. FACILITIES AND ACCREDITATION .................................................................................... 7 4. CALIBRATION AND UNCERTAINTY .................................................................................. 8 4.1. MEASURING INSTRUMENT CALIBRATION ................................................................ 8 4.2. MEASUREMENT UNCERTAINTY ................................................................................. 8 5. EQUIPMENT UNDER TEST ................................................................................................. 9 5.1. DESCRIPTION OF EUT ................................................................................................. 9 5.2. CHANNEL LIST .............................................................................................................. 9 5.3. MAXIMUM OUTPUT POWER ...................................................................................... 10 5.4. TEST CHANNEL CONFIGURATION ........................................................................... 10 5.5. THE WORSE CASE POWER SETTING PARAMETER ............................................... 10 5.6. THE WORSE CASE CONFIGURATIONS.................................................................... 11 5.7. DESCRIPTION OF AVAILABLE ANTENNAS .............................................................. 12 5.8. DESCRIPTION OF TEST SETUP ................................................................................ 13 6. MEASURING INSTRUMENT AND SOFTWARE USED ..................................................... 14 7. ANTENNA PORT TEST RESULTS .................................................................................... 16 7.1. ON TIME AND DUTY CYCLE ...................................................................................... 16 7.2. 6 dB DTS BANDWIDTH AND 99 % OCCUPIED BANDWIDTH ................................... 17 7.3. CONDUCTED OUTPUT POWER ................................................................................ 19 7.4. POWER SPECTRAL DENSITY ................................................................................... 20 7.5. CONDUCTED BANDEDGE AND SPURIOUS EMISSIONS ........................................ 22 8. RADIATED TEST RESULTS .............................................................................................. 24 8.1. RESTRICTED BANDEDGE .....................…

Text truncated - open the document above for the full version.

Contact Information

Applicant

Zhang Xinghai
[email protected]+86-755-2897-0299Fax: +86-755-8965-0226

Technical Contact

Intertek Testing Services ShanghaiWakeyou Wang
[email protected]86-21-61278448

Bl, No,86, 1198 Qinzhou Road(North) · Shanghai · China

Test Firm

UL Verification Services (Guangzhou) Co., Ltd.Stephen Guo
[email protected]+86 0769 33817120

Technical Specifications

#Rule PartsFrequency RangePower Output
115C2.41 GHz - 2.46 GHz47.90 mW
Confidentiality
Long Term
Grant Notes
Power Output listed is conducted. The antenna(s) used for this transmitter must be installed to provide a separation distance of at least 20 cm from all persons and not be co-located with any other transmitters except in accordance with FCC multi-transmitter product procedures. End-users and installers must be provided with antenna installation instructions and transmitter operating conditions for satisfying RF exposure compliance. This device has a 20MHz bandwidth mode, and it contains BPL function.

Other Applications from Huawei Technologies Co.,Ltd

Watch Wireless Charger - FCC ID QISCP81-1 - Huawei Technologies Co.,Ltd
QISCP81-1

Watch Wireless Charger

Oct 22, 2020

Equipment Class

DCD - Part 15 Low Power Transmitter Below 1705 kHz
Remote Radio Unit - FCC ID QISRRU3278 - Huawei Technologies Co.,Ltd
QISRRU3278

Remote Radio Unit

Sep 02, 2020

Equipment Class

CBD - Citizens Band Category A and B Devices
Indoor Router - FCC ID QISR2561 - Huawei Technologies Co.,Ltd
QISR2561

Indoor Router

Jul 11, 2020

Equipment Class

DTS - Digital Transmission System
Solar Smart Monitor & Data Logger - FCC ID QISSMARTLOGGER310 - Huawei Technologies Co.,Ltd
QISSMARTLOGGER310

Solar Smart Monitor & Data Logger

Mar 23, 2020

Equipment Class

DTS - Digital Transmission System
HUAWEI SuperCharge Wireless Car Charger - FCC ID QISCP39S1 - Huawei Technologies Co.,Ltd
QISCP39S1

HUAWEI SuperCharge Wireless Car Charger

Mar 18, 2020

Equipment Class

DCD - Part 15 Low Power Transmitter Below 1705 kHz